• Title/Summary/Keyword: coordinated dam operation

Search Result 5, Processing Time 0.025 seconds

Coping with Climage Change through Coordinated Operations of the Andong & Imha Dams (안동-임하댐 연계운영을 통한 미래 기후변화 대응)

  • Park, Junehyeong;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.12
    • /
    • pp.1141-1155
    • /
    • 2013
  • A number of studies have been performed to analyze climate change impacts of water resources system. In this study, a coordinated dam operation is compared with an existing operation strategy for coping with projected future runoff scenarios. GCMs (Global Circulation Models) and the LARS-WG downscaling method was used to project future climate scenarios. The water balance model called abcd was employed to estimate future runoff scenarios. The existing dam operation comes from the national dam construction guideline, which is called the "level-operation method." The alternative coordinated dam operation are constructed as a linear programming using New York City rule for refill and drawdown seasons. The results of annual total inflow in future is projected to decrease to 72.81% for Andong dam basin and 65.65% for Imha dam basin. As a result of applying future runoff scenarios into the dam operation model, the reliability of coordinated dam operation, 62.22%, is higher than the reliability of single dam operation, 46.55%. Especially, the difference gets larger as the reliability is low because of lack of water. Therefore, the coordinated operation in the Andong & Imha dams are identified as more appropriate alternative than the existing single operation to respond to water-level change caused by climate change.

Evaluating the economic benefit of diverse drought mitigation strategies for Korean reservoir systems based on simulated inflow sequences (유입량 모의 기법을 활용한 국내 다목적댐 가뭄 대책의 경제적 효과 평가)

  • Ji, Sukwang;Shin, Geumchae;Lee, Seungyub;Ahn, Kuk-Hyun
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.8
    • /
    • pp.485-496
    • /
    • 2023
  • Recently, South Korea has been making efforts to mitigate the risk of water scarcity during droughts by utilizing various drought response measures in dam operations. While various studies have been conducted on this topic, there is currently a lack of research on the economic effects of drought response measures. In this study, we evaluated the economic effects of drought response measures on nationwide multipurpose dams by using a long-term simulated inflow model based on ARIMA and Copula and a dam operation model that reflects drought response measures. The results showed that the expected benefits per unit flow rate were highest for coordinated operation and alternative water supply measures, at KRW 1,176 and KRW 1,139, respectively, while the benefits of emergency water supply utilization and water supply adjustment were estimated at KRW 956 and KRW 875, respectively. Additionally, when we examined the changes in the economic benefits of drought response measures based on the assumption of increased drought severity in the future, the changes in the drought risk resulting from reduced inflow increased the economic benefits of all drought response measures. The economic benefits of water supply adjustment increased by 2.6% compared to the baseline, while the economic benefits of coordinated operation and alternative water supply measures increased by 11.7% compared to the baseline. This suggests that dam-network-based measures, such as coordinated operation and alternative water supply measures, are crucial as drought risk increases. This study is expected to serve as a fundamental reference for selecting and utilizing drought response measures in the future.

Improvement of Water Supply Capability of the Nakdong River Basin Dams with Weirs (보를 포함한 낙동강 다목적댐 용수공급능력 개선에 관한 연구)

  • Jang, Cheol-Ho;Kim, Young-Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.637-644
    • /
    • 2016
  • This study sought to reevaluate the water supply capacities of the Nakdong river dams, and identify measures to remedy any shortages using weirs, focusing on 5 multipurpose dams and 8 weirs. The reevaluation of the dams was performed by the HEC-5 program using the original design criteria and inflow data recorded for each dam. The results show that the capacities of the 3 dams has decreased to 73~87%. Three simulations were performed to determine the effect of coordinating the dams and weirs. The first simulation was based on individual operation of the dams; the second on coordinated operation of the dams; and the third on coordinated operation of the dams and weirs. To obtain a water supply reliability of 95%, the annual water shortage was calculated for a 20-year period (1992~2011). In addition, long-term runoff simulation data used in the national river basin investigation by the Ministry of Land, Infrastructure and Transportation were used with the dam discharge data, because long-term inflow data for the weirs were not available. The simulations were performed by the HEC-ResSim program, with the reservoir network divided into 2 groups based on the Waegwan water station. The results show that water supply capacity for the 3 simulations to be $2424Mm^3/yr$, $2612Mm^3/yr$ and $2734Mm^3/yr$, respectively. This indicates that coordinated operation of the dams and weirs could provide an additional water supply of $122Mm^3/yr$.

Improvement of river environment in the downstream reaches of dams (댐하류의 하천환경 개선)

  • Ozawa, Takashi
    • Proceedings of the Korean Society of Environment and Ecology Conference
    • /
    • 2003.10a
    • /
    • pp.1-21
    • /
    • 2003
  • I introduce the Flexible Dam Operation (FDO) and some of sediment control techniques In dams which are implemented as trials to avoid or reduce environmental impact of dams on the downstream reaches. The FDO is a dam management method to improve river environment in the downstream reaches by means of the flushing flow, the maintenance flow and so on utilizing a vacant portion of capacity for flood control without interrupting prime flood control function during the rainy/typhoon season. It Is suggested by the guideline of the FDO that EDO should be implemented regularly after the trial for about three years. The basic conception of the FDO is described here. The example of excavation of deposited sediments in check dams and placement of sand ana gravel immediately downstream of the dams and the example of coordinated sediment flushing are described as some of sediment control techniques in dams. Now they are at the stage of experiment and trial. Therefore, it is important to increase examples and establish the technical methodology and the environmental evaluation method for them.

  • PDF

Development of Operating Guidelines of a Multi-reservoir System Using an Artificial Neural Network Model (인공 신경망 모형을 활용한 저수지 군의 연계운영 기준 수립)

  • Na, Mi-Suk;Kim, Jae-Hee;Kim, Sheung-Kown
    • IE interfaces
    • /
    • v.23 no.4
    • /
    • pp.311-318
    • /
    • 2010
  • In the daily multi-reservoir operating problem, monthly storage targets can be used as principal operational guidelines. In this study, we tested the use of a simple back-propagation Artificial Neural Network (ANN) model to derive monthly storage guideline for daily Coordinated Multi-reservoir Operating Model (CoMOM) of the Han-River basin. This approach is based on the belief that the optimum solution of the daily CoMOM has a good performance, and the ANN model trained with the results of daily CoMOM would produce effective monthly operating guidelines. The optimum results of daily CoMOM is used as the training set for the back-propagation ANN model, which is designed to derive monthly reservoir storage targets in the basin. For the input patterns of the ANN model, we adopted the ratios of initial storage of each dam to the storage of Paldang dam, ratios of monthly expected inflow of each dam to the total inflow of the whole basin, ratios of monthly demand at each dam to the total demand of the whole basin, ratio of total storage of the whole basin to the active storage of Paldang dam, and the ratio of total inflow of the whole basin to the active storage of the whole basin. And the output pattern of ANN model is the optimal final storages that are generated by the daily CoMOM. Then, we analyzed the performance of the ANN model by using a real-time simulation procedure for the multi-reservoir system of the Han-river basin, assuming that historical inflows from October 1st, 2004 to June 30th, 2007 (except July, August, September) were occurred. The simulation results showed that by utilizing the monthly storage target provided by the ANN model, we could reduce the spillages, increase hydropower generation, and secure more water at the end of the planning horizon compared to the historical records.