Transactions on Electrical and Electronic Materials
/
제18권5호
/
pp.279-286
/
2017
In this paper, an optimal approach for the wide-area regulation of control devices in a transmission network is proposed. In order to realize an improved voltage profile and reduced power loss, existing devices such as tap-changing transformers, synchronous machines, and capacitor banks should be controlled in a coordinated and on-line manner. It is well-understood that phasor measurement units in transmission substations allow the system operators to access the on-line loading and operation status of the network. Accordingly, this study proposes efficient software applications that can be employed in area operation centers. Thus, the implanted control devices can be regulated in an on-line and wide-area coordinated approach. In this process, efficient objective functions are devised for both voltage profile improvement and power loss reduction. Subsequently, sensitivity analysis is carried out to determine the best weighting factors for these objectives. Extensive numerical studies are conducted on an IEEE 14-bus test system and a real-world system named the Azarbayjan Regional Transmission Network. The obtained results are discussed in detail to highlight the promising improvements.
This study investigated the distribution of subject properties in Korean. Based on the previous studies on so-called 'subjecthood diagnostics' in Korean Multiple Subject Constructions (MSCs), the current study investigates how different subject properties are distributed in single subject constructions (Non-MSCs) and MSCs. Focusing on two distinct subject properties - obligatory control (OC) of PRO and coordinated deletion (CD) - an empirical syntactic experiment was designed to test how these two subjecthood diagnostics behave in the Non-MSC and MSC environments. Seventy Korean native speakers were tested over magnitude estimation task, composed of 80 Korean sentences representing different subject properties in single or multiple subject constructions. Overall results showed (i) both OC and CD can be used as subjecthood diagnostic tests in the Non-MSC environments, but (ii) that only OC can be used as a subjecthood diagnostic test in the MSC environments.
A loop power system has a nonlinear characteristics. Also it is very hard to analyse through a equation if a discontinuous characteristic of the ULTC is added to a system. However, the problem which is hard to analyse by equations can acquire the useful result with what use the genetic algorithm (GA) which is a multi-point search program. In this paper, we proved through a simulation that the proposed method can reduce an operation frequency of tap changers and improving the quality of voltage of the buses by decreasing the deviation between the actual voltage and the reference voltage through the coordinated control of the ULTC that use GA in the loop power system.
This paper describes a coordinated control algorithm for rear-side collision avoidance. In order to assist driver actively and increase driver's safety, the proposed coordinated control algorithm is designed to combine lateral control using a steering torque overlay by Motor Driven Power Steering (MDPS) and differential braking by Vehicle Stability Control (VSC). The main objective of a combined control strategy is twofold. The one is to prevent the collision between the subject vehicle and approaching vehicle in the adjacent lanes. The other is to limit actuator's control inputs and vehicle dynamics to safe values for the assurance of the driver's comfort. In order to achieve these goals, the Lyapunov theory and LMI optimization methods has been employed. The proposed coordinated control algorithm for rear-side collision avoidance has been evaluated via simulation using CarSim and MATLAB/Simulink.
International Journal of Control, Automation, and Systems
/
제3권spc2호
/
pp.322-333
/
2005
This paper proposes a combination of the Thyristor Controlled Series Capacitor (TCSC) and Static Var Compensator (SVC) installation for enhancing the damping performance of a power system. The developed scheme employs a damping controller which coordinates measurement signals with control signals to control the TCSC and SVC. The coordinated control method is based on the application of projective controls. Controller performance over a range of operating conditions is investigated through simulation studies on a single-machine infinite-bus power system. The linear analysis and nonlinear simulation results show that the proposed controller can significantly improve the damping performance of the power system and hence, increase its power transfer capabilities. In this paper, a current injection model of TCSC is developed and incorporated in the transmission system model. By using equivalent injected currents at terminal buses to simulate a TCSC no modification of the bus admittance matrix is required at each iteration.
A Photovoltaic (PV) system's power output varies with the change of climate. Frequency deviations, tie line voltage swings are caused by the varying PV power when large PV power from several PV systems is fed in the utility. In this paper, to overcome these problems, a simple coordinated control method for smoothing the variations of combined PV power from multiple PV systems is proposed. Here, output power command is formed in two steps: central and local. Fuzzy control is used to produce the central smoothing output power command considering insolation, variance of insolation and absolute average of frequency deviation. In local step, a simple coordination is kept between the central power command and the local power commands by producing a common tuning factor. Power converters are used to achieve the same output power as local command power employing PI control law for each of the PV generation systems. The proposed method is compared with the method where conventional Maximum Power Point Tracking (MPPT) control is used for each of the PV systems. Simulation results show that the proposed method is effective for smoothing the output power variations and feasible to reduce the frequency deviations of the power utility.
최근 10년간 긴급차량(소방방채청 기준)의 출동 건수 및 출동 시간은 지속적으로 증가하는 추세이며, 혼잡으로 인한 출동여건은 나빠지고 있다. 특히, 일반 승용차의 양보가 힘든 상황에서 신호제어 전략은 출동시간을 줄일 수 있는 중요한 방법 중 하나로서 본 연구에서는 경찰청의 UTIS 사업과 연계하여 신호교차로에서 사용가능한 긴급차량 preemption 알고리즘을 보행자를 고려한 현시전략 및 주기 회복 전략을 고려하여 개발하였다. 또한 이를 평가하기 위한 방안으로 VISSIM을 이용하여 대전에 위치한 비연동축 및 연동축에 대하여 모의실험을 수행하였다. 모의실험의 객관적 평가를 위해 네트워크 정산 및 검증 과정을 수행하였으며, 이를 기반으로 기존 고정식 신호제어와 preemption 신호제어에서 긴급차량과 일반차량의 통행시간 및 평균지체를 검토하였다. 긴급차량의 경우 preemption 이후 주기회복에 "Add 또는 Subtract"을 사용할 경우 36.8~43.3%, "Dwell" 방식을 사용할 경우 30.7~46.0%의 통행시간 감소가 확인되었으며, 일반차량의 경우, 비연동축에서 Dwell 방식을 취할 경우 평균지체가 33.5%까지 증가하였으며, 연동축에서는 0.5% 증가만 확인되었다. 또한 비연동축에서 "Add 또는 Subtract"은 0.7%, 연동축에서는 4.5% 평균지체 증가가 확인되었다. 따라서 preemption 이후 주기회복과정은 연동축에서는 "Dwell", 비연동축에서는 "Add 또는 Subtract"의 방식이 우수할 것으로 판단된다. 그러나 연동축에 대한 명확한 구분이 어려울 경우, "Dwell" 방식의 사용은 신중히 고려되어야 할 것으로 판단된다.
In diesel engine technology the drive to reduce emissions and fuel consumption with improved performance targets has led to many advances. In particular, Exhaust Gas Recirculation (EGR) and Variable Geometry Turbocharger (VGT) have played a key role in achieving these aims by permitting flexible control of the engine inlet gas charge. The full potential of these devices are difficult to achieve due to limitations in the classical control methods. However, fuzzy logic is particularly appealing due to its simple heuristic nature. The controller used in this work was designed using the Matlab Fuzzy Logic Toolbox. The overall object is to access the potential for emissions and fuel consumption reductions during transient events whilst maintaining and even improving driveability. Classical control methods (PID), as used on production engines, are examined and contrasted with an coordinated control that utilizes fuzzy logic.
This paper describes the coordinated droop control method for stand-alone type DC micro-grid to improve reliability and utilization of distributed generations and energy storage. The stand-alone type DC micro-grid consists of several distributed generations such as a wind power generation, solar power and micro-turbine, and energy storage. The proposed method which is based on autonomous control method shows high reliability and stability through coordinated droop control of distributed generations and energy storage and also capability of battery management. The operation of stand-alone type DC micro-grid was analyzed using detail simulation model with PSCAD/EMTDC software. Based on simulation results, a hardware simulator was built and tested with commercially available components and performance of system was verified.
Purpose: This study aimed to examined the effects of upper and lower limb coordinated exercise of proprioceptive neuromuscular facilitation (PNF) on static and dynamic balance ability. Methods: The subjects of this study were 18 patients who had been diagnosed with a stroke and hospitalized and who had received rehabilitation treatment at D rehabilitation hospital located in J city. They were randomly and equally assigned to a PNF upper and lower limb coordinated exercise group and an ordinary central nervous system development and treatment group, and they conducted exercises for eight weeks. They carried out exercise three times per week, for 30 minutes per each time. After each four minutes of exercise, each participant was given a and rest for one minute after exercise for four minutes was given. In order to test the subjects' static and dynamic balance ability and their dynamic balance ability, frailty and injuries,: a cooperative studyies of intervention techniques (FICSIT-4) test, a four- step square test (FSST), a timed up and go test (TUG), and a TWT3M tests wasere conducted before and after the exercise. Descriptive statistics were taken for the general characteristics of the subjects, and an independent t-test was conducted both before and after the exercise in order to examine differences between the two groups before and after the exercise were conducted. The A statistical significance level was set at p= 0.05. Results: In all the tests (of FICSIT-4, FSST, TUG, and TWT3M), both the experimental group and the control group saw more improved results, but the experimental group's results were significantly higher than those of the control group, and the size of the effects was larger in the experimental group than in the control group, with statistically significant results. Conclusion: PNF upper and lower limb coordinated exercise applied to chronic stroke patients produced brought significant results in static and dynamic balance ability. PNF and is considered as an important intervention program to improve stroke patients' balance ability.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.