A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

Patterns and Trends in Schedule Control Practice of Korean General Contractors (건설기업 공정관리 패턴의 현황 및 변화 분석)

  • Jung, Young-Soo;Kim, Hee-A
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.88-96
    • /
    • 2011
  • Schedule control is an exceedingly fundamental and important construction business function. Even though enormous research efforts have been exerted in this area, there has been no comprehensive and quantitative study exploring detailed cost control practice of construction companies in terms of practical patterns and trends. In this context, this paper surveyed the patterns and trends of schedule control practice of Korean general contractors. Schedule control process as compared to schedule reduction is focused in this paper. The variables for practical schedule control process were identified first. A survey questionnaire was then developed and used in order to collect data from Korean general contractors. Survey results analyzing responses from 45 companies show that scheduling processes in practice have been significantly enhanced in terms of software tools, manuals, and capabilities of engineers.

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Coordinated Control of ULTC Considering the Optimal Operation Schedule of Capacitors (커패시터의 최적 스케줄링을 고려한 ULTC의 협조 제어)

  • Park, Jong-Young;Park, Jong-Keun;Nam, Soon-Ryul
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.6
    • /
    • pp.242-248
    • /
    • 2006
  • This paper proposes a coordinated control method for under-load tap changers (ULTCs) with shunt capacitors to reduce the operation numbers of both devices. The proposed method consists of two stages. In the first stage, the dispatch schedule is determined using a genetic algorithm with forecasted loads to reduce the power loss and to improve the voltage profile during a day. In the second stage, each capacitor operates according to this dispatch schedule and the ULTCs are controlled in real time with the modified reference voltages considering the dispatch schedule of the capacitors. The performance of the method is evaluated for the modified IEEE 14-bus system. Simulation results show that the proposed method performs better than a conventional control method.

A study on Improving Operation of the Records Disposition Schedule (기록물분류기준표의 운영과 과제)

  • Park, Yoo Jin
    • The Korean Journal of Archival Studies
    • /
    • no.8
    • /
    • pp.57-95
    • /
    • 2003
  • For a good record maintenance according to organization and functions in Korea, it is required to make better use of 'Records Disposition Schedule', which is originally developed as a computerized system that can control the whole records maintenance procedure and manage every record according to organization and functions. 'Records Disposition Schedule' is only a system that allows us to maintain every record according to organization and functions and manage every information about such organization and functions. Accordingly, a well-functioning Records Disposition Schedule requires the exact modification and operation of such schedule depending upon organizational or functional changes. If the Records Disposition Schedule is not reasonably modified and operated depending upon organizational or functional changes, we won't be able to maintain any records in linkage with organization and functions and control the whole works throughout record maintenance.

Module Suggestion to Develop an Integration System of Schedule and Change Control (공정 및 변경관리 통합시스템 개발을 위한 모듈 제안에 관한 연구)

  • So Young-Sung;Oh Seung-Jun;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.393-396
    • /
    • 2002
  • Purpose of this study is to suggest some modules to integrate schedule and change control. The study has been performed through the process of literature review, effect comparison of being not integrated and integrated of the schedule and change control, and finally suggest new integrated modules. The results of this study are as follows: 1) Suggestion of a Predicted Change Information Control Module: This nodule can be used to assess the impact of changes in advance and to prepare counteraction. 2) Suggestion of a Change Information Control Module: This module is used to update current schedule for the realized changes. 3) Suggestion of a Revision History Maintenance Module: This module is used to record schedule and cost revision history and to analyze the overall change trend.

  • PDF

Control Effect of Temperature and Humidity by Ventilation Fan Operation Methods in Wintering Honey Bee House (월동용 양봉사의 환기팬 작동방식에 따른 온 ${\cdot}$ 습도 조절효과)

  • Lee, Jong-Won;Lee, Hyun-Woo;Lee, Suk-Gun;Jin, Ran-Shu;Choi, Kwang-Soo
    • Journal of Bio-Environment Control
    • /
    • v.12 no.3
    • /
    • pp.127-131
    • /
    • 2003
  • This study was conducted to establish the ventilation fan operation schedule to be able to provide satisfactory environment for colonies in thc wintering honey bee house. The simulation and practical measuring test were conducted to verify the applicability of an existing simulation program to thc calculation of inside thermal environment condition of the house, and the environment control performance was compared between the two types of fan operation schedule to find the proper schedule. It was concluded that the program could be used to design thc materials of the enclosure and the fan operation schedule and decide the number of accommodation hives. Inside temperature of bee house controlled by the fan operation schedule B was lower than the schedule A under the similar high outside temperature condition. In the presence of the high outside temperature condition, inside air temperature of bee house could be decreased by changing fan operation schedule A to schedule B. The humidity variation in bee house controlled by the tan operation of schedule B was smaller than that by schedule A. These results indicated that the schedule B was superior in the aspect of the environment control performance.

The SPWM Fuzzy Controller for speed control of Induction Motor

  • Kamsri, T.;Riewruja, V.;Ukakimaparn, P.;Pongswatd, S.;Kummool, S.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.465-465
    • /
    • 2000
  • The paper presents the fuzzy control technique to adjust the gain schedule in the fuzzy controller. The micro computer is designed to the fuzzy controller to execute the proportional gain with the data of the error and speed command. The gain schedule is the fuzzy set which execute based on the fuzzy rule. The gain schedule from the fuzzy controller is fed to the sinusoidal pulse width modulation (SPWM) inverter for control the response and speed of the induction motor. The induction motor coupling to the DC motor and tachogenerator which DC motor as a load. The test result of the fuzzy control technique in the open loop control, it provides a good response and in the closed loop control it can control speed in the any condition of load design

  • PDF

A Study on the Method of Preliminary Works Management for a Schedule Performance Management (공정이행관리를 위한 선행작업관리 시안)

  • Park, Hong-Tae;Song, Young-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.3
    • /
    • pp.757-764
    • /
    • 2008
  • It is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the qualify and schedule management of the construction, We can make systematically preliminary works in accordance with construction schedule by the architecture construction items of the apartment house construction. We suggested important preliminary control item by the workers through experiential method of construction engineers in accordance with network schedule. should not use "we" in technical sentence.