A Study on the Improvement of Logistic Support by Performance Based Logistics (성과기반군수(PBL)를 활용한 군수지원 발전방안 연구)

  • Choi, Seok-Cheol
    • Journal of the military operations research society of Korea
    • /
    • v.34 no.2
    • /
    • pp.43-61
    • /
    • 2008
  • Performance based logistics(PBL) is recently studied and applied for enhancing the combat readiness and reducing the life-cycle cost for weapon system in the United States. Therefore, in this paper, we review the issues of logistic support and suggest alternatives to effectively manage the logistic support for weapon system by using performance based logistics, especially during operation and support phase of weapon systems.

A Case Study of Quality Management System Program in General Contractor (종합건설회사의 품질경영시스템 적용사례연구;H건설 사례 중심으로)

  • Yang, Ki-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.588-592
    • /
    • 2006
  • Information trend in whole domestic industries can not be a exception for construction industry either. However, Construction companies applying quality information management system(QIMS) through practical use of internet is very limited. Consequently, this research finds the established sample of quality information management system(QIMS) of H-construction company out, and the quality is established to the practical use of the system to be like the this. therefore, the construction industry wished to become opportunity that construction industry competitive power is recognized cosmopolitanly to quality management system(QMS).

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

A Field Study on the Loss Factors of IS Development Project in the Public Sector: Perspectives of Project Management (공공부문 IS 개발 프로젝트 손실요인에 대한 현장연구: 프로젝트 관리를 중심으로)

  • Jang, Sung-Bong
    • Journal of Information Technology Services
    • /
    • v.3 no.2
    • /
    • pp.65-84
    • /
    • 2004
  • This research analyzes the causes of delay and resulting additional expenses on the IS project in the public sector, and then proposes some solutions to the problem. Through a field study, the research found that the causes include employer's attitude, the leadership and risk management ability of the project manager, and qualifications of project members. In order to avoid those problems, the project manager should secure various communication channels and good relationship between the employee and the contractor.

Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects (농어촌정비사업 공종별 실적공사비 적산시스템개발)

  • 김현영;이정재;김영기;오상원;전효묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.3
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

Study on Protective Coating Management Status in Overseas Nuclear Power Plant (해외 원자력발전소 방호도장 유지관리 현황 고찰)

  • Lim, Sang-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.318-319
    • /
    • 2018
  • Protective coatings at nuclear power plants should be designed to withstand exposure to ambient conditions during normal operation or design-basis accidents. However, there was a change in the perception of the protective coating to the revision of the Regulatory Guidelines by the NRC in July 2000. In other words, maintenance guidelines have been strengthened in order to minimize the clogging of the cooling water system due to the substances in the containment building. Therefore, KHNP, the contractor and operator of the nuclear power plant, plans to develop the coating system for nuclear power plants in accordance with the regulation, and plans to develop its own coating expert.

  • PDF

A study on Sub-contractor Product Assurance for development of Ka band Communication Payload System of COMS (통신해양기상위성 Ka 통신탑재체 개발 공동 및 용역 개발 참여기관 제품보증 연구)

  • Jeong, Cheol-Oh;Lee, Seung-Pal
    • Journal of Aerospace System Engineering
    • /
    • v.3 no.1
    • /
    • pp.6-11
    • /
    • 2009
  • It is anticipated that quality assurance for the Ka band Communication Payload System(COPS) development program of the communication, Ocean & Meteorological Satellite(COMS) may be a core technical factor to be concerned in order to avoid any failure, and to assure its final performance during the mission lifetime in space. Those can be managed and verified and assessed by performing the Quality Assurance (QA) and risk management which helps to prevent and to reduce the critical fails. This paper introduces the Product Assurance (PA) system and procedures for controlling and monitoring sub-contractors which were participated in Ka band Communication Payload System (COPS) development. Also this paper shows Quality Assurance (QA) procedures and detailed their processes for assured the product performed by local companies from site survey for selecting companies to delivery of their equipment.

  • PDF

A Structural Engineer's Approach to Differential Vertical Shortening in Tall Buildings

  • Matar, Sami S.;Faschan, William J.
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.1
    • /
    • pp.73-82
    • /
    • 2017
  • Vertical shortening in tall buildings would be of little concern if all vertical elements shortened evenly. However, vertical elements such as walls and columns may shorten different amounts due to different service axial stress levels. With height, the differential shortening may become significant and impact the strength design and serviceability of the building. Sometimes column transfers or other vertical structural irregularities may cause differential shortening. If differential shortening is not addressed properly, it can impact the serviceability of the building. This paper takes the perspective of a structural engineer in planning the design, predicting the shortening and its effects, and communicating the information to the contractor.

Verification of Life-Cycle Cost for the Urban Railway Vehicle (도시철도 차량에서 수명주기비용의 검증)

  • Chung, Kwang-Woo;Jeon, Young-Seok;An, Joon-Yong;Kim, Chul-Su;Chung, Jong-Duk
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.636-642
    • /
    • 2009
  • The application of LCC-techniques is being introduced at the on-going procurement programs of various techniques. LCC-techniques have the common characteristic that all are designed to motivate contractors to design, manufacture and deliver equipment with lower life cycle costs. You may believe that savings may be in the acquisition cost component of life cycle costs. However, primary emphasis is generally on reducing and controlling operating and support costs by transferring more responsibility to the contractor for equipment operating and support cost performance. It has been found that life cycle cost procurement provisions must be individually tailored to each program. In this study, the currently identified LCC procurement techniques including a variety of LCC incentive provisions are introduced. Moreover, verification method, a procedural issue and incentive to application of LCC-techniques are examined.

  • PDF

Collaborative Procurement System for IT-Enhanced Supply Chains (정보기술을 활용한 공급 사슬의 협업적 조달 시스템에 관한 연구)

  • Eungab Kim;Chankwon Park;Kitae Shin
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.129-141
    • /
    • 2002
  • This paper deals with the collaborative procurement process in a two-echelon supply chain that a manufacturing company and a contractor are connected through the information system. The real time information about inventory and production processing becomes available through this information system. We raise two issues related to the collaborative procurement process. First, we propose a VMI(Vendor-Managed Inventory) type of the procurement policy which focuses on the cost minimization for the total supply chain rather than individual companies. Second, based on the simulation study, we demonstrate that a collaborative procurement process is more cost-effective over classical procurement processes such as (Q, r). The result obtained in this paper can be applied to the quantitative evaluation of the cost saving effect when companies build the information sharing based, collaborative procurement system.

  • PDF