Kim, Do-Hyung;Lee, Dongyoun;Lee, Hak-Ju;Min, Yoon-Gi;Park, Insung;Cho, Hunhee
Journal of the Korea Institute of Building Construction
/
v.20
no.4
/
pp.357-365
/
2020
While numbers of apartment housing are continually rising in the domestic housing construction industry, apartment contractors are currently developing plane models, upgrading facilities, and relevant technology, and investing much efforts to meet the higher demands of consumers. However, the construction process of apartment housing involves the intricate properties of the construction industry such as materials, workforce, equipment, weather, and unpredictable situations. If any of these factors becomes discordant and results in interference and interruption of the construction process, then defects, both functional and aesthetic, are likely to occur due to errors in the plan of industry organizers and constructors. Therefore, this research identifies the types of defects in an apartment construction project and analyzes their relative importance. Firstly, this research reviews the previous research trends and will reduce the needs of this research. Afterward, defect repair costs corresponding to the different defect types are calculated by applying results of the research and performing frequency analysis on defect types included in 'Tenant preliminary research' on apartments constructed by Company A. As a result of analyzing the importance of defect type, the top six activities, including tile, floor, paper hanging, PL window, cabinetry, and kitchen cabinet, are found to be of high importance, and the top six activities in question need of repair and management of defects first. The results of this study will help establish a plan to initially respond to such problems as refusal to move in and filing a defect suit against delay in repairing defects.
Lee, Kang Wook;Han, Seung Heon;Park, Hyung Keun;Chin, Kyung Ho
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.1
/
pp.347-354
/
2013
In the recent global construction environment, EPC contracts that integrate planning, design, procurement, and construction have been widely used for industrial facilities. Similarly, as the importance of the engineering capability such as project management consulting(PMC) and front end engineering design(FEED) has been increased, design-build contracts also have been gradually adopted for infrastructure projects. Whereas, the Korean infrastructure industry has fragmentary features which mainly emphasize on the construction sector. Therefore, this study aims at developing strategies for enhancing the engineering capability and for balancing the competitiveness between engineering and construction sectors in the Korean infrastructure industry. To this end, the authors first carried out market analysis for both global and domestic market. Then, a structured survey and expert in-depth interviews were sequentially performed in order to reflect practitioners' perspectives and needs for institutional strategies. As a result, five strategies drawn from this study are as follows: 1) rearranging the government's roles for supporting the engineering sector; 2) establishing institutional bases being compatible with global standards; 3) fostering value-added workforce for undertaking complex tasks; 4) constructing an consortium between an engineering association and general contractors; and 5) building a nationwide collaborative networks for overseas market expansion.
The delay in the construction permit for the building, which obtained the approval of business proposal, may lead to a difference in the maintenance cost ranging between 20% and 30% in the neighborhood where the residents moved in, along with the new project under construction in the surrounding area amidst rigorous regulations that aim to promote energy-saving and the heightened interest of the public in energy conservation, and such problem would become the major source of serious public complaints. Thus, the energy-saving plan needs to be prepared when the approval is granted to the business plan. In order to prevent public complaints or ensure effectiveness of government's energy plan, it may be effective to apply the energy-saving plan based on current standards upon the award of construction permit when two years have elapsed since the date of the scheduled commencement of construction or when the start of construction is delayed as stipulated in the Article 18 of the Enforcement Decree of Housing Act. If the energy-saving plan and related technologies are merely the parts of license and permit process without fully serving their purposes and functions, it would be waste of time to deploy a lot of workforce and review and seek consultation. The government or owners of buildings need to fully understand the energy-saving aspects and exert effort to enhance the energy efficiency of buildings.
Korean Journal of Construction Engineering and Management
/
v.20
no.1
/
pp.41-51
/
2019
With the aging of the population and the slowdown of the job market, elderly workers make up a large portion of the construction workforce. Also, due to the nature of the construction industry, where outdoor work is frequent, the weather has a more sensitive impact on elderly workers than on younger ones. The study aims to analyze the degree of weather risks exposed to elderly workers in the construction industry using the measure of work loss days. To that end, construction accidents that affected 28,514 elderly workers in seven cities from 2012 to 2016 (a total of 12,789 days) were analyzed to calculate work loss days per different weather factors. The results show that the elderly workers were seriously affected when the temperature was between $-12^{\circ}C$ and $-10^{\circ}C$, humidity between 55% and 60%, precipitation between 128mm and 181mm, and wind speed between 5.5m/s and 6.5m/s, with the highest work loss days. The combined effects between the weather factors were also analyzed to identify the conditiosn that leaded to high work loss days of elderly workers. This study contributes to effective safety management and pleasant working environment between weather factors and shedding light on the relationship between weather factors and work loss days of elderly workers.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.1
/
pp.138-147
/
2020
The construction field is one of the most representative job creation businesses, but it has been pointed out that the overall quality of the jobs is low because of the nature of the order-made production industry, such as unstable employment structure, aging workforce, etc.. Accordingly, the government plans to implement the "prevailing wage system" that guarantees a minimum wage for construction site workers. In reality, however, only a market wage could be used for a construction cost estimation because there was no standard for the prevailing wage. A comparative analysis of the prevailing wage and market wage was performed. This paper proposes a framework for estimating the reasonable prevailing wage in the construction industry. The results showed that the prevailing wage was estimated to be 4.7% lower than the market wage when the proposed framework is applied to the carpenters' case. This suggests that the proposed model could be used as an alternative for market wage considering the original purpose of the prevailing wage. This study will construct the basic data for scientific analysis on the wage, and finally, help estimate the reliable prevailing wage in the future.
Welding is an absolutely essential component of industries such as the automotive industry, the construction industry and even the aviation industry. Although it is a widespread technology it is still characterized by lots of uncertainties. This still requires well experienced and highly skilled workforce to design and perform safe welding processes. The early knowledge of distortion and residual stresses is almost an issue which is influenced mainly by the welding parameters and the fixture design. But more and more engineers want to know as well final properties of the assembled components. With the beginning of the computer age in the 1970s and 1980s last century, the numerical prediction of manufacturing processes using FEM was gradually getting better and has established itself in the industry since the 1990s as a standard tool. Unlike in metal casting and forming industry, however, the everyday use of FEM- simulation tools for welding processes eked out a shadowy existence for a long time. This paper will give a short classification of welding simulation types and a structured overview on the technical questions. Selected case studies and the benefits achieved through simulations with the software Simufact welding are discussed. Finally an outlook on future developments will be given.
DE ARAUJO, Victor;POLANCO, Cesar;MORALES, Elen;CORTEZ-BARBOSA, Juliana;GAVA, Maristela;GARCIA, Jose
Journal of the Korean Wood Science and Technology
/
v.47
no.5
/
pp.607-616
/
2019
On account of the lack of education of Brazilian worker, this paper analyzed the characteristics of those professionals working in the production sector of timber houses. A sectoral survey was carried out with respective entrepreneurs to investigate the available professionals (career and contract types), evaluate the demands of skilled workers, and indicate solutions to improve the quality of labor qualification. Similarly, over 65% of sampled producers presented both direct-hired and outsourced workforce. For such contract ways, Civil Engineers and Architects were the main careers. Carpenters, Civil Engineers and Architects experienced on timber were the main sectoral demands. Timber Engineers have good potentials of service for this sector. The creation of courses on timber products can emerge as a key alternative to train people.
This study analyzed the effects of labor aging on labor productivity using panel statistics of 16 local governments from 1995 to 2017. The aging of the labor force, defined as the proportion of workers aged 60 or older in total employment, in the results of the panel regression analysis considering regional fixed effects and various adjustment variables, has a very consistent and significant negative effect on labor productivity. For every 1% increase in aging, labor productivity decreases by about 0.14 ~ 0.20%. In addition, the per capita capital stock and human capital considered as adjustment variables contributed to the increase of labor productivity, and the unemployment rate, which is a proxy variable of the economic fluctuation, has a significant negative effect on labor productivity as expected. The coefficient of the industrial structure, which represents the share of the service industry in the whole industry, was positive, but is not significant. The results of this study suggest that the design and construction of economic and educational policies that can maintain and expand human capital are necessary to curb the reduction in labor productivity expected by the aging workforce.
The trends of Green growth and environmentally-friendliness came to be the key development indicator for sustaining global environment for the future. Korean government reflected these trends in the main flows of the national development index. Korean construction industry is concentrating investment on fields related to these trends such as technologies for carbon dioxide deduction, materials or products for environmentally-friendly building and alternative energy development, as well. However, efforts to follow these trends during the construction process as a step for production phrase are not being considered enough. In this study, we analysed current status and points to be improved of on-site environment management by surveying major project owners and representatives of the environmental affairs in the leading companies of those fields. Also, we suggested organizational structure and operation model as a solution for enhancing environmentally-friendliness for systematic approach to manage on-site environment in public construction sites. In addition to these solutions, further approaches such as shifting paradigm of project owners and contractors, securing workforce and practical budget for efficient management activities, developing environmental management manuals, setting standards for evaluation of activities are needed for the stable settlement of on-site environmental management.
Since most construction workers comprehend information on work through sight, the importance of safety signs are increasing by the day. In Korea, due to the sharp economic progress and the higher standard of the workforce, since the end of 1980, each year the number of foreign workers entering the country who working simple technical jobs have increased this condition. This study researched safety signs, which are the final accident prevention measures at the workplace. Based on the study, comprehension of the standard safety signs of the Occupational Safety and Health Act (OSHA) was lacking at a level of 2.5. Also, the perception level of the Industry Public Safety Law (38%) was very low. And, it was found that sex and experience or non-experience in safety training was not an issue in the level of understanding. However, when satisfying the standards of the Occupational Safety and Health Act and changing the safety signs, the level of understanding went up to 3.49 and the perception level was increased significantly to 70%. Thus, it is concluded that, since the foreign workers are mainly from non-English speaking countries and because the workers of Korea are not familiar with English, in order to provide proper safety information, there must first of all be simplistic and concise pictograms. This will provide needed information and must be coupled with simple English words that can give additional information to the worker and be effective in helping him understand and perceive the safety sign. Also, it has been determined that the existing forms of safety signs and their effectiveness in industry accident prevention must be reassessed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.