The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.107-110
/
2011
The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, falsework (temporary structures) in construction projects is fundamentally important. However, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. It is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop the safety assessment system, this research utilizes the BIM technology and collects important information by importing data from BIM models and use it in the planning stage.
Xia, Nan;Lam, Wendy;Tin, Pamela;Yoon, Sungwon;Zhang, Na;Zhang, Weiwei;Ma, Ke;Fielding, Richard
Safety and Health at Work
/
제11권1호
/
pp.26-32
/
2020
Background: Hong Kong's construction industry currently faces a manpower crisis. Blue-collar workers are a disadvantaged group and suffer higher levels of chronic diseases, for example, cancer, than the wider population. Cancer risk factors are likely to cluster together. We documented prevalence of cancer-associated lifestyle risk behaviors and their correlates among Hong Kong construction workers. Methods: Data were collected from workers at 37 railway-related construction worksites throughout Hong Kong during May 2014. Tobacco use, alcohol consumption, unbalanced nutrition intake, and physical inactivity were included in the analysis. Latent class analysis and multivariable logistic regression were performed to identify the patterns of risk behaviors related to cancer, as well as their impact factors among construction workers in Hong Kong. Results: Overall, 1,443 workers participated. Latent class analysis identified four different behavioral classes in the sample. Fully adjusted multiple logistic regression identified age, gender, years of Hong Kong residency, ethnicity, educational level, and living status differentiated behavioral classes. Conclusion: High levels of lifestyle-related cancer-risk behaviors were found in most of the Hong Kong construction workers studied. The present study contributes to understanding how cancer-related lifestyle risk behaviors cluster among construction workers and relative impact factors of risk behaviors. It is essential to tailor health behavior interventions focused on multiple risk behaviors among different groups for further enlarging the effects on cancer prevention.
정부는 신용평가시스템을 객관화하여 회생가능성이 있는 기업은 자금을 지원하고, 회생가능성이 없는 기업은 조기에 구조조정을 추진하는 방안을 발표하였다. 이러한 정부발표는 자본시장을 통한 구조조정의 기반을 강화하여 신속한 구조조정이 이루어질 수 있는 기틀을 마련함으로써 재무건전성이 낮은 중견건설사는 구조조정 위험에 확대될 수 있다. 본 연구는 2019년 기준으로 주택사업에 집중된 10개 중견건설사를 선정하여 은행의 재무심사기법을 통해 재무건전성을 분석하였고, 이러한 분석결과를 통해 구조조정 위험에 노출될 가능성이 높음을 확인할 수 있었다. 2020년에는 경제성장률 하락과 부동산규제 강화로 건설업 성장률이 전반적으로 하락될 것으로 판단되어 자본금 납입비율이 낮은 중견건설사는 안정적인 신용등급을 유지할 가능성이 낮아 구조조정에 포함될 가능성이 높다. 본 연구는 중견건설사가 구조조정 위험에서 벗어날 수 있도록 공신력 있는 연구기관의 자료를 활용하여 KCSI 평가모델을 설정하였고, 실무전문가 설문조사를 통해 각 항목마다 차별화된 위험비율을 나타냈다. 이러한 연구결과는 중견건설사 경영진에게 신용리스크 저감방안을 실천하도록 제언할 수 있었고, 구조조정 위험에 벗어날 수 있는 기틀을 마련하였다.
건설공사는 다양한 리스크에 노출되어 있으며, 건설공사의 리스크는 더욱 증가하는 경향을 보이고 있다. 건설공사의 리스크 증가는 건설사의 리스크 예측 및 대응의 중요성을 더욱 증가시키고 있다. 건설사가 건설공사의 리스크를 대응하는 방법 중 하나는 리스크 비용을 사전에 예측 또는 산정하여 이를 실행예산에 반영하는 것이다. 리스크 비용과 관련하여 다양한 연구들이 수행되어 왔지만, 국내 건설사의 실행예산 편성 시 리스크 비용 산정에 관한 인식과 실태에 관한 분석은 미흡한 것으로 나타났다. 본 연구의 목적은 종합건설사의 실행예산 편성 시 리스크 비용 산정과 관련된 인식과 실태를 조사·분석하여 주요 특징 및 시사점을 도출하는데 있다. 본 연구의 주요 결과를 요약하면 실행예산 편성 시 리스크 비용 반영의 중요성에 대한 인식은 상당히 높았으나, 상대적으로 리스크 비용을 산정하는 수준은 상대적으로 미흡한 것으로 나타났다. 리스크 비용 산정을 효과적으로 수행하기 위해서는 실적 데이터, 가이드라인, 전사적 표준절차 등 실무기반이 구축되어야 하며, 충분한 견적기간도 할애될 필요가 있었다. 또한 리스크 비용 산정을 위해 빅데이터 분석기법을 포함한 정교한 분석기법의 활용에 대한 관심은 높지만 현재 준비 및 활용 수준은 낮은 것으로 나타나 이에 대한 실무 적용성을 높이기 위한 연구개발이 필요하다고 할 수 있다.
The 3th International Conference on Construction Engineering and Project Management
/
pp.292-301
/
2009
The employment of risk management theory in Urban Disaster Management System (UDMS) has become an important trend in recent years. The viewpoint of risk management is mainly a comprehensive risk assessment of various internal and external factors, and a subsequent handling of risks. Through continuous and systematic accumulation and analysis of risk information, disaster prevention and rescue system is established. Taking risk management theory as the foundation, Organization for Economic Cooperation and Development (OECD) has developed a series of UDMS in the mega-cities all over the world. With this system as a common platform, OECD cooperates with different cities to develop disaster prevention and rescue system consisting of vulnerability assessment methods, risk assessment and countermeasures. The paper refers to the urban disaster vulnerability assessment and risk management of OECD and the mega-cities of different advanced and developed countries in the world, and then constructs a preliminarily drafted structure for the vulnerability assessment methods and risk management mechanism in the metropolitan districts of Taiwan.
프로젝트 리스크관리는 프로젝트 착수에서 완공에 이르기까지 프로젝트 생애주기 동안 프로젝트의 범위, 비용, 일정 등에 영향을 미치는 위협 및 기회 요인을 포함하는 리스크를 사전에 식별하고 이에 대한 완화전략을 사전에 마련함으로서 프로젝트를 성공에 이르게 하는 효과적인 관리를 위해 활용된다. 프로젝트를 진행하는데 있어서 완공일이 지나기 전에 예산과 공사기간을 정확히 예측하는 것은 불가능하므로, 미국 워싱턴교통부에서는 사업비 규모에 따라 여러 분야의 전문가를 참여자로 하는 워크숍을 실시하게 함으로서 체계적인 리스크관리를 의무화하고 있다. 하지만 국내 건설 현장에서는 체크리스트 및 리스크분석 위주의 리스크관리만 이루어지고 있어 효율적인 관리가 이루어지지 않고 있다. 따라서 본 연구에서는 국내 A하천정비사업에 워크숍 기반 리스크관리기법을 국내 처음으로 적용해 봄으로서 국내 현실에 적합한 효율적인 리스크관리 방법을 제안하였다. 또한 이러한 리스크관리 전 과정에 식별된 리스크를 분석하여 완화전 후의 리스크에 대한 비교를 쉽게 살펴보고 관리할 수 있는 RBES 프로그램을 활용하였다. 그 결과 전체 사업비용과 공사기간의 증가 문제를 사전에 인지하고 이에 대한 실질적인 완화대책을 수립하게 함으로서 공사기간 지연효과를 미리 방지하는 효과가 있었다.
Soltanmohammadi, Mehdi;Saberi, Morteza;Yoon, Jin Hee;Soltanmohammadi, Khatereh;Pazhoheshfar, Peiman
Industrial Engineering and Management Systems
/
제14권3호
/
pp.221-235
/
2015
Risk assessment is an important phase of risk management. It is the stage in which risk is measured thoroughly to achieve effective management. Some factors such as probability and impact of risk have been used in the literature related to construction projects. Because in high-rise projects safety issues are paramount, this study has tried to develop a quantifying technique that takes into account three factors: probability, impact and Safety Performance Index (SPI) where the SPI is defined as the capability of an appropriate response to reduce or limit the effect of an event after its occurrence with regard to safety pertaining to a project. Regarding risk-related literatures which cover an uncertain subject, the proposed method developed in this research is based on a fuzzy logic approach. This approach entails a questionnaire in which the subjectivity and vagueness of responses is dealt with by using triangular fuzzy numbers instead of linguistic terms. This method returns a Risk Critical Point (RCP) on a zoning chart that places risks under categories: critical, critical-probability, critical-impact, and non-critical. The high-rise project in the execution phase has been taken as a case study to confirm the applicability of the proposed method. The monitoring results showed that the RCP method has the inherent ability to be extended to subsequent applications in the phases of risk response and control.
건설산업의 환경은 대형화, 전문화의 추세와 공사이행기간의 증가와 건설공사의 입찰에 있어서 중요한 리스크 요인과 불확실 요인이 존재하게 되었으며 하도급자의 판단오류 및 인식부족은 이윤감소 혹은 적자를 초래하게 되며, 이는 결과적으로 하도급자에게 재정적 부담을 주게된다. 따라서 입찰단계에서의 리스크요인에 의한 공사예비비 산정을 예측하고 계약의 합의와 이행 과정에서 하도급자의 목표이윤 확보를 고려한 입찰단가를 산정하는 것은 매우 중요하다. 이러한 취지에서 본 연구는 하도급자의 공종별 사례로 선정하여 입찰금액 산정에 미치는 리스크에 대한 중요도가 공사비에 미치는 영향정도를 기초로 하여 분석하고, 이를 바탕으로 하도업자의 합리적인 입찰전략을 수립하는 기초자료로 활용하는데 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.