Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.
This study is to find out primary factors through the punch list in the large scale apartment housing complex, to prevent repeatedly occurring defects of construction and to gain quality management. The following are the findings of the research. (1) The positive strengthening of supervision for the workers can contribute to prevent defects of apartment construction and make better quality of the construction. (2) A solution should be made for the poor of surface join and the damage of work element showing a lot in the apart construction, which prevent defects and improve construction quality. (3) Indirect factors such as negligence and carelessness of the management should be improved to advance construction quality, and the caution and control strengthening of the management should be followed. It is revealed that hitch, omission, and heedlessness come from the defects, and the shortage of skill and checking appear as indirect factors. Therefore, to get quality improvement, the enhancement of the management factors, employment of excellent workers, and enhancement of working attitude and construction management are needed.
엑셀 기반의 서류 작성, 결재, 품질 시험을 수행하는 건설현장의 품질관리업무는 많은 시간과 노력이 소요된다. 엑셀 기반의 업무는 품질시험성적서 양식 인쇄, 품질시험 수행, 시험성적서 작성 및 결재, 관리대장 작성으로 구성된다. 이렇듯 분리된 품질관리 프로세스는 업무 소요시간과 효율성을 저하시킨다. 따라서, 품질관리업무의 생산성을 향상시키기 위해 클라우드 기반의 건설현장 품질관리 시스템이 개발되었다. 본 연구의 목적은 건설현장 도입 초기 단계인 품질관리시스템의 생산성을 분석하는 것이다. 본 연구는 건설현장 품질관리시스템을 도로 건설현장에 도입하고, 도입 전·후의 품질관리업무 프로세스 변화를 면밀히 분석했다. 또한 품질관리자들에게 설문조사를 실시하여 품질관리시스템 도입 전·후의 업무 시간 데이터를 수집했다. 수집한 데이터에 몬테카를로 시뮬레이션 방법론을 적용하여 건설현장 품질관리시스템의 생산성 향상 효과를 분석하고 결과를 제시하였다. 본 연구의 결과는 품질관리 업무 자동화를 위한 후속 연구들의 기초자료로 활용할 수 있을 것이다.
우리나라 건설공사의 품질관리체계는 관련법에 근거한 규정의 조합과 시공자가 구축한 ISO/KS A 9001에 의한 품질경영 시스템의 운용에 의한 방법의 혼합형이다. 이 두 가지의 품질확보체계는 상호 보완적이며 통합된 체계로 운영되어야 하나, 시공자의 품질경영시스템을 활용하지 못하고 법에서 정한 기준과 방법, 절차 등의 규정에 따라 모든 공사에 있어서 일상화된 품질관리업무가 수행되고 있다. 이러한 현상은 ISO규격이 도입된 이래 지난 10여 년간 계속된 문제점으로 개선이 요구되고 있다. 품질관리의 철저를 목표로 고객 만족을 위한 예방적 품질관리사고를 정착하는 일은 건설산업의 당면과제이다. 이에 본 논문에서는 건설현장 의 실무자를 대상으로 품질관리 관련 의식에 관한 설문조사를 실시하였으며 그 결과를 토대로 건설공사 품질관리 체계의 운용에 대한 만족도를 정리하고, 나아가 향후의 개선방안에 대한 논점을 제시하고자 한다.
최근에 건설 중인 공동주택 구조물이 분괴하는 등 부실시공이 사회적 이유로 대두되고 있는 실정이다. 부실시공에 대한 원인은 다양하게 있고 요인별 미치는 영향도 다르겠지만 건설회사 시공관리자 측면에서 문제점을 알아보고자 하였다. 따라서 본 연구는 품질·안전문제 해결을 위해 건설현장의 건설회사 시공관리자의 배치에 있어 기술자 경력, 기술자 인원수, 기술자 투입시기 등의 적정성에 대해 알아보고자 한다. 본 연구 수행을 위해 객관적인 의견 조사를 위해 건설사업관리자를 대상으로 설문조사를 실시하였고, 그 결과 건설회사 시공관리자 수를 늘려야 하며, 또한 중간 경력의 시공관리자를 투입하여 실질적 관리가 가능하도록 하여야 하는 것으로 나타났다. 그리고 건설회사의 시공관리자의 계약직을 대폭 축소하는 동시에 안전관리자나 품질관리자와 유사하게 현장 시공관리자 투입인원을 제도적으로 규정할 필요가 있는 것으로 나타났다.
An, Hyo-Kyung;Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
한국건축시공학회지
/
제12권1호
/
pp.10-21
/
2012
As one of the key IT applications, the project management information system (PMIS) played a significant role in construction management processes in Korea. On increasing use of PMIS, regular quality assessment to identify user's requirements of PMIS is necessary. However, there have been rare research efforts for quality assessment for the construction PMIS. This paper aims to propose a priority index of quality improvement for construction PMIS using the importance and satisfaction measures and to verify the discrimination power of the priority index by comparing it with other quality improvement priority index. In addition, this paper discusses some possible ways of PMIS quality improvement. The analysis of quality improvement priority was based on a questionnaire responded by 253 PMIS users (construction managers and constructors). The methods of PMIS improvement were based on the interviews with eight experts. These findings would be the foundation of further researches on PMIS quality improvement. However, more efforts are required to enhance the priority index, in terms of reflecting weighted values of quality assessment factors.
Quality management in construction industry becomes more significant under the existing conditions such as, increasing higher demand caused by the high value of real estate and extension of the warranty period. Therefore, this study presents the alternative idea related to the current quality management conditions of small and medium construction companies, including the difficulties and problems in qualify management, in order to develop the systematical method for the quality management in small and medium construction company.
국내 산업 전반에 걸친 정보화 추세는 건설산업에도 예외가 될 수 없지만, 급속하게 전파되고 있는 인터넷의 활용을 통하여 효율적인 건설품질관리업무를 수행하고 있는 건설업체는 몇몇 대형건설업체에 불과하다. 따라서 본 연구는 국내 H건설의 품질정보관리시스템(QIMS)의 구축사례를 알아보고, 이러한 시스템의 활용을 통하여, 향후 건설품질경영시스템(CQMS)이 정착되고 발전되어서 국내건설산업 전체가 국제적으로 품질경쟁력을 인정받는 계기가 될 수 있는 기반을 제시하고자 한다.
The 6th International Conference on Construction Engineering and Project Management
/
pp.252-254
/
2015
Building Information Modeling (BIM) encourages effective information share and utilization among project participants during entire life cycle of facility. This paper presents a method that keeps track of the historical quality records involved in construction operations and facilitates using BIM. The method is coded into BIM based Quality Record Traceability (BIM-QRT) System that makes use of historical records obtained from database administrating construction operations. This study is of value to practitioners because the method makes clear the project participants' responsibility relative to the quality of each and every element of the facility. The main objective of this research is to develop an accurate, fully automated method for construction Quality Record Tracking by using a BIM along with construction operations data obtained by information technology. Test cases verify the usability and validity of the methods implemented in the system.
Identifying the root causes of substandard construction projects is crucial considering the social and economic issues structural failures can cause. To date, the focus has predominantly been on identifying and penalizing the culprits rather than uncovering the fundamental reasons. Therefore, this study aims to identify various factors that contribute to failures in construction project quality management, including aspects of substandard construction projects, and determine the relationship between these factors and substandard construction projects. Through a literature review and case analysis, 61 influential factors were identified. A survey targeting participants including structural designers, architectural designers, construction companies, CM, and researchers was conducted to gauge the consensus on these factors. A regression analysis was performed based on data from 724 survey respondents. Ultimately, based on the 17 key influencing factors identified by the regression analysis, 9 preventive measures against substandard construction projects were proposed. This study is significant as it elucidates the reasons behind construction project quality management failures that lead to substandard construction projects and establishes a framework for developing practical solutions to real-world problems rather than theoretical or abstract ones.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.