• Title/Summary/Keyword: construction plan

Search Result 3,313, Processing Time 0.025 seconds

Development Plan of Design for Safety in Construction (설계안전성 검토(DfS) 발전방안)

  • Shin, Ju Yeoul
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.351-356
    • /
    • 2017
  • This study introduces the current status of the design for safety(DfS) introduced as one of the owner - centered construction site safety management plan, and presents the problems and the improvement plan. The design for safety has been shifting from the construction management-oriented safety management to the owner-centered safety management system, The owner has to make the design considering the safety from the design stage centered on the owner. The owner has to review and approve the adequacy of the safety-conscious design and The risk factors that can not be eliminated during design are the system to prevent the disaster at the construction site by planning to eliminate the risk factor when writing the safety management plan that is made at the construction stage. The design for safety system implemented from May 2016 will be further developed to prevent the risk of safety accidents that may occur in construction sites, contributing greatly to the reduction of construction accident. In addition, it suggests ways to develop more efficient and convenient system through continuous hazard finding and system improvement.

Assessment of Education/Training System and Improvement Plan - Focused on the Chinese Construction Industry - (중국 건설기업의 교육훈련 시스템 분석 및 개선방안)

  • Wang, Nam;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.39-47
    • /
    • 2010
  • Top-notch global construction firms have been responding strategically in order to survive in a rapidly-changing market environment by training and securing excellent human resources. The purpose of this study is to propose a guideline for establishing a strategic human resources management system for the Chinese construction sector. Specifically, this study intends to suggest an overall strategic plan for improving the human resources management system based on the research outcomes obtained through an analysis of the Chinese construction market and human resource management practices. To meet the proposed research purpose, questionnaire survey and in-depth interviews were conducted in China. The analysis results indicated that Chinese construction firms are generally not prepared to carry out efficient training programs. In addition, the available contents and materials for education and technical training are extremely limited. Based on the problems drawn from the analysis results, an overall plan for the improvement of the education system is suggested.

Supply-Demand Forecast and Development Direction for Aggregate (골재의 수급 전망 및 개발 방향)

  • Kang, Ki-Woong;Choi, Sun-Mi;Kim, Jin-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.332-333
    • /
    • 2018
  • The master plan for aggregate supply and demand aims to ensure the feasibility viability of mid/long-term aggregate supply and demand by establishing comprehensive plans for regional groups and aggregate types. In addition, It will propose ways to reduce the environmental impact of the development of aggregates and to stabilize aggregate supply and demand across the country. Also, it will seek to promote the stable development of the construction industry through policy and related amendments.

  • PDF

Floating & Underground Space Extension Method for New Seoul City Hall (서울 시청사 뜬구조 공법)

  • Choi, Young-Gil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.254-255
    • /
    • 2013
  • New Seoul city hall completed in 1926 is a registered historical building. The remodeling plan has been developed for the expansion after the review by the governmental agency. Based on the plan, a new city hall should be constructed behind the current city hall while the facade, the main lobby and the dorm structure of the existing building, A new construction method, FUSEM, has been developed for this mission for the safety of the historical structure.

  • PDF

A Study on the Plan for Advanced Noise-Policy in the 21st Century (21세기 소음정책 선진화 방안 고찰)

  • Yang, Geun-Ho;Park, Young-Min;Lee, Nae-Hyun;Chang, Yoon-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.1
    • /
    • pp.21-30
    • /
    • 2009
  • The study show that things about the noise control are indicated at The Noise & Vibration Control Act and the other Act. Also, the details program and total government ministries' program for the noise control are indicated what are the advance noise control plan. The study consist of the four part which are "Draw up the environmental noise infrastructure plan; the install shall be done the noisemap & the automatic noise measurement devices", "Resetting of environmental noise standard at the application area and Introduce of indoor noise; the guide for region classification of the noise standard & indoor noise", "Setting of aircraft noise standard and Program of measurement point operation; the noise-assessment-standard shall change from WECPN to new index($L_{den}$, $L_{dn}$, $L_{Aeq\;24h}$) & the operation and control of aircraft noise measurement changes from local environmental office to central control center" and "The method of noise regulation at construction site and the plan on making of standard for vibration regulation; It shall be made that the guideline of construction noise should include a target-construction, noise standard etc & the ministries shall unify control about construction vibration of the blasting vibration". The advance noise-policy will improve efficiency to deal with civil appeal & damage on residents about noise.

A Study on the Development of a Public Building Renewal Model and Incorporating Mobility Technologies and Policy Innovations (모빌리티 기술을 접목한 공공건축물 리뉴얼 모델 개발 및 제도적 지원 방안 연구)

  • Nam, Seong-Woo;Bang, Hong-Soon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.483-494
    • /
    • 2024
  • The purpose of this study is to develop a model for renewing old public buildings by incorporating mobility technology into them for the convenience of citizens' transportation and the enhancement of public services, and to propose support measures to improve the direction of implementation. The main contents and results of this study are as follows. First, the renewal target site was selected based on the technical considerations and evaluation criteria required for the renewal of public buildings incorporating mobility technology, and the construction was planned by analyzing the necessary mobility technology based on the size, area, and district unit plan of the selected target site. Second, the expected cost was calculated based on the construction plan and the financial support plan necessary for reflecting mobility technology was proposed. Third, the improvement plan of the building code system required for the development of public building renewal incorporating mobility technology was proposed. This study had limitations in that it could not reflect detailed construction costs due to the lack of design standards and experience, and it was difficult to identify specific problems due to the lack of specific operation methods and implementation cases.

A Study on the Dome Plan of S. M. del Fiore Church of F. Brunelleschi (브루넬레스키의 산타 마리아 델 휘오레 교회의 돔계획에 관한 연구)

  • Kim, Seok-Man
    • Journal of architectural history
    • /
    • v.21 no.5
    • /
    • pp.19-32
    • /
    • 2012
  • The purpose of this paper is a study on the dome plan of S. M. del Fiore Church of F. Brunelleschi. The results of study are as follows: 1. The planning of floor, elevation and cross section plan of S. M. del Fiore church is basically planned by each other correlation. In particular, the octangular form of geometrical standard which is formed with altar as the center at the crossing part is important component elements which is decided by not only the dome, but form and size of the drum and floor plan form of the lantern 2. The dome which has been planned by F. Brunelleshi has completed the new dome, preserving gothic thought intended by the church plan after study on architecture of ancient Rome with Pantheon. And the dome which is a main space of church through all aspects of plan, structure, function and construction about the dome is a opportunity in the beginning of Renaissance architecture which is a new epoch and a turning point of architecture on various point of view. 3. The dome which is constructed by F. Brunelleshi has been planned through the innovative solution by the refusal of traditional semicircle form dome, centering use and creation double-shell structure form for the first time in history. And the construction of dome has been solved with the invention of various construction equipments and machineries, the stone rib planned for connection and reinforcement about shells of the octangular form, the support method for reduction the gravity of bricklayers work and the brick work of nock-patterned shape which is masonry construction method of the architecture of ancient Rome.

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

A Study on the Fire Safety Plan for High-Rise Building Construction (초고층 건축물 건설공사 시 화재안전계획 수립에 관한 연구)

  • Ham, Eun-Gu;Jeong, Myeong-Jin;Lee, Myeong-Gu
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.11a
    • /
    • pp.59-66
    • /
    • 2012
  • Recently buildings are constructed in larger and higher scales and becoming more complex. Every country in the world is competing to build high-rise buildings. Korea also has and is constructing high-rise buildings, like the 123story Jamsil Lotte Super Tower. However from small to large scale buildings and on construction sites there still are fire safety accidents that occur continuously. Therefore to improve fire safety plan, examining the actual fire safety management and understanding fire risk analysis Using Fire Modeling through Computer Simulation. Fire safety management plan related fire safety cases were collected an dan analyzed for the study. Also hazard analysis of High rise Buildings under fire compared with existing fire law sand regulations.

  • PDF

Study on Schematic Design for Educational Facilities of Hanyang Women's College (한양여자대학 교육시설의 계획설계에 관한 연구)

  • Jung, Won-Ju
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.2 no.1
    • /
    • pp.32-38
    • /
    • 2002
  • Hanyang woman's college educational facility general planning presents "Long-term and expansive space organization plan" of Hanyang woman's collage to correspond to sudden decline and "Globalization specialization" of "Matriculation competition rate by school age decrease in population" but there is primary purpose. To detailed item, secure "Flexibility of campus space by learning environment change" and studies and examines "Campus ashes construction plan by step by new earth purchase" we wish to propose "Long-term and systematic synthesis master plan" and "Newly-appointed official and present official new construction plan".

  • PDF