• Title/Summary/Keyword: construction period comparison

Search Result 143, Processing Time 0.03 seconds

Comparison of Construction Methods with Zoysiagrass at the New Incheon International Airport (인천국제공항 착륙대 녹지지역의 잔디식재를 위한 한국잔디류 시공법 비교)

  • 이상국;이정호;주영규
    • Asian Journal of Turfgrass Science
    • /
    • v.16 no.2
    • /
    • pp.75-83
    • /
    • 2002
  • The back-filled soil of the New Incheon International Airport construction site was reclaimed with sea sand in near the Young-Jong island. The primary study was carried out from August 1993 to June 1997 to study soil amendment and to select salt resistance turfgrass species. This study dealt with low maintenance area that included most part of open space of airport site. The second experiment, from October 1996 to August 1998, focused on soil amendment and selection of turfgrass species for alongside runway where turf area was maintained. Through two previous studies, propagation methods with zoysiagrass were tested for alongside runway and surrounding areas at 1998. The study of construction methods with zoysiagrass, vegetative propagation showed better results on visual quality and cover rating compare with seeding propagation. However, significant different between vegetative and seeding propagation was not showed on visual quality and drought tolerance after one year of plot establishment. The cover rating by seeding construction methods reached in excess of 70% of limitation suggested by the Incheon International Airport Cooperation. Zoysia net and sprigging net methods were the most suitable where there requires rapid and high rate of ground cover. Seeding propagation should be acceptable to obtain a resonable cover rating where there allows relatively longer period of completion. Therefore, it should be possible to attain a proper rating of ground cover on the site of open space, alongside runway or areas similar to the New Incheon International Airport which is being built on dredged seashore sand. However, the methods of soil amendment, selecting salt tolerance species, and proper construction procedure should be considered at the a time.

Proposal of Return Period and Basic Wind Speed Map to Estimate Wind Loads for Strength Design in Korea (강도설계용 풍하중 평가를 위한 재현기간과 기본풍속지도의 제안)

  • Ha, Young-Cheol
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.2
    • /
    • pp.29-40
    • /
    • 2018
  • Strength design wind loads for the wind resistance design of structures shall be evaluated by the product of wind loads calculated based on the basic wind speed with 100 years return period and the wind load factor 1.3 specified in the provisions of load combinations in Korean Building Code (KBC) 2016. It may be sure that the wind load factor 1.3 in KBC(2016) had not been determined by probabilistic method or empirical method using meteorological wind speed data in Korea. In this paper, wind load factors were evaluated by probabilistic method and empirical method. The annual maximum 10 minutes mean wind speed data at 69 meteorological stations during past 40 years from 1973 to 2012 were selected for this evaluation. From the comparison of the results of those two method, it can be found that the mean values of wind load factors calculated both probability based method and empirical based method were similar at all meteorological stations. When target level of reliability index is set up 2.5, the mean value of wind load factors for all regions should be presented about 1.35. When target level of reliability index is set up 3.0, wind load factor should be presented about 1.46. By using the relationship between importance factor(conversion factor for return period) and wind load factor, the return periods for strength design were estimated and expected wind speeds of all regions accounting for strength design were proposed. It can be found that return period to estimate wind loads for strength design should be 500 years and 800 years in according to target level of reliability index 2.5 and 3.0, respectively. The 500 years basic wind speed map for strength design was suggested and it can be used with a wind load factor 1.0.

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

A Study on the Construction Records and Architectural Type of Unsoo-sa Daeoong-jeon in Busan (부산 운수사 대웅전의 조영기록과 건축형식 연구)

  • Seo, Chi-Sang;Kim, Yoon-Jeong
    • Journal of architectural history
    • /
    • v.22 no.5
    • /
    • pp.47-64
    • /
    • 2013
  • The purpose of this paper is to examine the foundation and subsequent reconstruction years of Unsoo-sa Daeoong-jeon in Busan, especially based on the five records of this building. Moreover, this paper aims to analyze the possibility of the architectural type changes by comparison with nearby Buddhist buildings. The results of this study are summarized as follows. First, Unsoo-sa Daeoong-jeon was built in 1655. Afterward, it had been repaired through five times, but most members of it's wood-framework were found to had been prepared and constructed in 1655. Second, such as the gongpo type, roof type, module system, intercolumnar distance and proportion of intercolumnar distance and column-height, the architectural type of this building is similar to nearby Sinhung-sa Daekwang-jeon. This was because the identical monk-craftsmen carried out the many constructions of nearby temples with their architectural skills at the same period. Third, in particular, the style and created-time of the front gongpos are different from those of the rear gongpos. That is why the front gongpos were replaced when Unsoo-sa Daeoong-jeon was reconstructed in 1771.

Comparison of Standard Specification for the Curing of Cold Weather between Korea and China (한국과 중국의 한중 콘크리트 표준시방서의 보온양생 규정 비교)

  • Hu, Yun-Yao;Jeong, Jun-Taek;Lim, Gun-Su;Han, Jun-Hui;Kim, Jong;Han, Min-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.131-132
    • /
    • 2023
  • In this paper, standard specification of heat curing section of cold weather concrete between Korea and China were compared. First, Korea concrete specification (KCS 14 20 40) stipulates that the application period is less than 4℃ per day or less than 0℃ per day right after pouring, but in China, the outdoor daily average temperature is less than 5℃ for five consecutive days. This is believed to be due to the difference in temperatures between Korea and China in winter. Next, in the case of Korea, KCS do not show that the concrete temperature in curing should be 5℃ or higher to prevent early frost damage and obtain the minimum required compressive strength. On the other hand, in the case of China, the specificaion does not show that the curing method is selected based on the concrete surface coefficient after considering the outdoor temperature. In addition, in Korea and China regulation, the temperature of the space during thermal curing was shown to be similar.

  • PDF

An Analysis of the Prediction Accuracy of HVAC Fan Energy Consumption According to Artificial Neural Network Variables (인공신경망 변수에 따른 HVAC 에너지 소비량 예측 정확도 평가 - 송풍기를 중심으로-)

  • Kim, Jee-Heon;Seong, Nam-Chul;Choi, Won-Chang;Choi, Ki-Bong
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.11
    • /
    • pp.73-79
    • /
    • 2018
  • In this study, for the prediction of energy consumption in the ventilator, one of the components of the air conditioning system, the predicted results were analyzed and accurate by the change in the number of neurons and inputs. The input variables of the prediction model for the energy volume of the fan were the supply air flow rate, the exhaust air flow rate, and the output value was the energy consumption of the fan. A predictive model has been developed to study with the Levenbarg-Marquardt algorithm through 8760 sets of one-minute resolution. Comparison of actual energy use and forecast results showed a margin of error of less than 1% in all cases and utilization time of less than 3% with very high predictability. MBE was distributed with a learning period of 1.7% to 2.95% and a service period of 2.26% to 4.48% respectively, and the distribution rate of ${\pm}10%$ indicated by ASHRAE Guidelines 14 was high.8.

An equivalent linear SDOF system for prediction of nonlinear displacement demands of non-ductile reinforced concrete buildings with shear walls

  • Saman Yaghmaei-Sabegh;Shabnam Neekmanesh;Nelson Lam;Anita Amirsardari;Nasser Taghizadieh
    • Structural Engineering and Mechanics
    • /
    • v.85 no.5
    • /
    • pp.655-664
    • /
    • 2023
  • Reinforced concrete (RC) shear wall structures are one of the most widely used structural systems to resist seismic loading all around the world. Although there have been several efforts to provide conceptually simple procedures to reasonably assess the seismic demands of structures over recent decades, it seems that lesser effort has been put on a number of structural forms such as RC shear wall structures. Therefore, this study aims to represent a simple linear response spectrum-based method which can acceptably predict the nonlinear displacements of a non-ductile RC shear wall structure subjected to an individual ground motion record. An effective period and an equivalent damping ratio are introduced as the dynamic characteristics of an equivalent linear SDOF system relevant to the main structure. By applying the fundamental mode participation factor of the original MDOF structure to the linear spectral response of the equivalent SDOF system, an acceptable estimation of the nonlinear displacement response is obtained. Subsequently, the accuracy of the proposed method is evaluated by comparison with another approximate method which is based on linear response spectrum. Results show that the proposed method has better estimations for maximum nonlinear responses and is more utilizable and applicable than the other one.

A Study on the Archtectural Planning Compared with Space for Before and After Remodeling of General Hospitals in Korea (국내 종합병원의 리모델링 전.후 공간비교에 관한 건축계획적 연구)

  • Lee, Joo-Young;Kim, Sang-Bok;Yang, Nae-Won
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.16 no.2
    • /
    • pp.7-15
    • /
    • 2010
  • An early stage of general hospital in Korea was the quantitative growth period. Remodeling has been required to meet the increasing medical demands. To accept the change of paradigm and management operation method, remodeling occurred from the 20th century. Remodeling plans are difficult to define the direction of the detailed plan due to various factors in the beginning of the construction, Therefore, it is necessary to analyze the possibility and limitation of a feasible remodeling plan of general hospitals through the comparison of existing hospital before remodeling and after the remodeling takes effect. A comparison of the researched hospital's blue prints before and after the remodeling and recently built hospital's blue print, analyzed characteristic of the space variation by the remodeling. The purpose of research is to confirm a possibility and limitation of remodeling of general hospitals comparing with merits and faults of extension, reconstruction, and construction. In conclusion, the area of remodeling hospitals increase mostly medical department(ward, outpatient department, inpatient department) and subsidiary facilities, but the area of ward and inpatient department are less than the new hospitals. Especially, public area is greatly increased by the diversification of corridor function. Also, remodeling hospitals represent a limitation to plan departments in need of equipment-intensive space. To address this problem, expansion space is used mainly with inpatient department and existing space is placed mainly with low-impact department by equipment ; outpatient department, administration department.

Effects of Shore Stiffness and Concrete Cracking on Slab Construction Load I: Theory (슬래브의 시공하중에 대한 동바리 강성 및 슬래브 균열의 영향 I: 이론)

  • Hwang, Hyeon-Jong;Park, Hong-Gun;Hong, Geon-Ho;Im, Ju-Hyeuk;Kim, Jae-Yo
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.1
    • /
    • pp.41-50
    • /
    • 2010
  • Long-term floor deflection caused by excessive construction load became a critical issue for the design of concrete slabs, as a flat plate is becoming popular for tall buildings. To estimate the concrete cracking and deflection of an early age slab, the construction load should be accurately evaluated. The magnitude of construction load acting on a slab is affected by various design parameters. Most of existing methods for estimating construction load addressed only the effects of the construction period per story, material properties of early age concrete, and the number of shored floors. In the present study, in addition to these parameter, the effects of shore stiffness and concrete cracking on construction load were numerically studied. Based on the result, a simplified method for estimating construction load was developed. In the proposed method, the calculation of construction load is divided to two steps: 1)Onset of concrete placement at a top slab. 2)Removal of shoring. At each step, the construction load increment is distributed to the floor slabs according to the ratio of slab stiffness to shore stiffness. The proposed method was compared with existing methods. In a companion paper, the proposed method will be verified by the comparison with the measurements of actual construction loads.

A CONSTRUCTION OF AN AUTOMATIC OBSERVATION SYSTEM FOR BRIGHT AND LONG PERIOD VARIABLE STARS (밝은 장주기 변광성관측을 위한 자동관측시스템 구축)

  • Yoon Joh-Na;Lee Chung-Uk;Cha Sang-Mok;Kim Yong-Gi
    • Journal of Astronomy and Space Sciences
    • /
    • v.23 no.2
    • /
    • pp.143-152
    • /
    • 2006
  • An automatic observation system has been constructed at Chungbuk National University for the purpose of monitoring the bright and long period variable stars effectively. We improved the control part of 40cm telescope of the LX200 and developed n observing software ObsTool II so that the telescope, CCD camera and dome can be controlled in one software. ObsTool II is a COM (Common Object Module) based software, which can be easily reprogrammed in case that a new telescope or CCD camera is installed. Because this system has an additional function in which the telescope can switch the variable, comparison, and check stars respectively as like a photoelectric observation, we can observe the variable star even if the CCD view field does not contain the comparison star with the variable star. In order to check the system stability a W UMa type variable V523 Cas and a magnetic cataclysmic variable TT Ari have been observed with the constructed system and the results have been discussed in context with the possibility of a further application of our automatical observation system.