• Title/Summary/Keyword: construction methodology

Search Result 1,389, Processing Time 0.034 seconds

Risk Mitigation Methodology of the General Conditions of Contract (공사계약일반조건의 위험요인 감소방안)

  • Yoon, Chul-Sung;Kwon, Soon-O;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.177-185
    • /
    • 2005
  • Construction uncertainties are frequently exposed to the claims. In most cases, an interpretation of the claims is based on the construction contract. Therefore, the key points of contract negotiation are how to fairly distribute the contract risks to the client and contractor. For these, a FIDIC that is considered as an international standard contract form would be a good reference to decide reasonable contract risk distribution. In order to find out any unreasonable and unfair contract clauses at the general conditions of contract applying generally to public construction project in Korea, this study surveys, analyses and evaluates the general conditions of contract based on a FIDIC, and then proposes a risk mitigation methodology to response those clauses' risk factors reasonably.

Intent signal generation of the exoskeletal robotics for construction workers and verification of its feasibility (건설작업자의 근력지원을 위한 외골격 모듈의 동작의지신호 생성 및 타당성 검증)

  • Lee, Seung-Hoon;Yu, Seung-Nam;Lee, Hee-Don;Jang, Jae-Ho;Han, Chang-Soo;Han, Jung-Soo
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1603-1608
    • /
    • 2008
  • Powered robotic exoskeletons are currently under development for assisting or supporting human muscle power. Many applications using this system for the purpose of national defense system, medical support, and construction industry are now frequently introduced. In this paper, we proposed the exoskeletal wearable robotics for construction workers. First, we analyzed general work conditions at the construction site and set up target tasks through the datum. Then dominant muscles’ activity which is related with the defined target tasks was checked up. Herein, wearers’ intent signal generation methodology was introduced in order to effectively activate the proposed system. In the final part of this paper, we evaluated the capability and feasibility of the exoskeletal robotics by the electromyography (EMG) signal variance; demonstrated that robotic exoskeletons controlled by muscle activity could be useful way of assisting with construction workers.

  • PDF

UTILITY-BASED PERFORMANCE MEASUREMENT SYSTEM (UBPMS) FOR COMPARISON OF CONSTRUCTION PROJECTS

  • Ki-Hyun Kim;Hee-Sung Cha;Ju-Yeoun Han;Il-Han Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1509-1514
    • /
    • 2009
  • CII BM&M(Benchmarking & Metrics) in USA and DTI(Department of Trade and Industry) in UK have built up systems that enable performance measuring and made the results of performance measurement comparable between projects to utilize them as benchmarking tools. By comparing the results of performance measurement, it is possible to grasp the success level of project management and to establish the direction of management. However, construction projects are much diversified and even those projects with the same work type have different attributes. Therefore, simply comparing the results of project performance measurement without considering the characteristics of projects is not justifiable and affects the reliability of the benchmarking results. Therefore, to solve this problem, this study presents a methodology that makes it possible to compare the individual construction projects considering various characteristics. The benefits and importance of project characteristics to overall project performance will be quantitatively expressed and they will be reflected on the results of performance management. By maximally converting multiple projects with different characteristics into the same projects through a new methodology to convert different projects into the same level utilizing such utility-bases and comparing the performances of those projects, project performance results can be utilized in project management as a tool for more accurate decision making and as a robust benchmarking tool.

  • PDF

Integration of BIM and Simulation for optimizing productivity and construction Safety

  • Evangelos Palinginis;Ioannis Brilakis
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.21-27
    • /
    • 2013
  • Construction safety is a predominant hindrance in in-situ workflow and considered an unresolved issue. Current methods used for safety optimization and prediction, with limited exceptions, are paper-based, thus error prone, as well as time and cost ineffective. In an attempt to exploit the potential of BIM for safety, the objective of the proposed methodology is to automatically predict hazardous on-site conditions related to the route that the dozers follow during the different phases of the project. For that purpose, safety routes used by construction equipment from an origin to multiple destinations are computed using video cameras and their cycle times are calculated. The cycle times and factors; including weather and light conditions, are considered to be independent and identically distributed random variables (iid); and simulated using the Arena software. The simulation clock is set to 100 to observe the minor changes occurring due to external parameters. The validation of this technology explores the capabilities of BIM combined with simulation for enhancing productivity and improving safety conditions a-priori. Preliminary results of 262 measurements indicate that the proposed methodology has the potential to predict with 87% the location of exclusion zones. Also, the cycle time is estimated with an accuracy of 89%.

  • PDF

Implementation of the Methodology for BioAPI Conformance Test (BioAPI v2.0 표준적합성 시험방법 개발 및 구축)

  • Shin, Woo-Chang
    • Journal of Information Technology Services
    • /
    • v.10 no.3
    • /
    • pp.179-188
    • /
    • 2011
  • Biometrics is one of promising future technologies within personal identification area, and its application stretches to other variety industry site. Therefore it is necessary to test whether these products are implemented in conformance withe the BioAPI international standard specification. This paper presents the specific construction and application examples of BioAPI v2.0 conformance test suite according to the method described in ISO/IEC 24709. The problems and experience that have been discovered in the construction are described. Three BSP products claiming conformance to BioAPI was tested by proposed the test methodology and tools.

Key Factors and Analysis Models of the Preliminary Feasibility Study in u-City Construction by Attracting Private Investment (민간투자유치를 통한 u-City 구축에 있어서 사전 타당성 분석의 핵심요인과 분석모델)

  • Kim, Myung-Dong;Park, Kwang-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.1-6
    • /
    • 2012
  • This paper aims to suggest a validity analysis model that would be helpful for local governments considering u-City construction projects and a methodology for them to promote build-transfer-lease (BTL) u-City projects. This methodology mainly uses quantitative and qualitative analysis based on the Value For Money (VFM) designed by the Public and Private Infrastructure Investment Management Center (PIMAC) under the Korea Development Institute (KDI). BTL projects requires a large amount of capital and involves long-term investments. Therefore, multi-faceted validity analysis is required for the success of a project. This study will enumerate various factors to be considered in the pre-analysis of validity of BTL projects and suggest a methodology to verify them. A case study of a BTL project promoted by Ansan City assisted in designing this study in detail.

Optimization of Mixing Proportion of Press-forming Board by Response Surface Methodology (반응표면분석법을 이용한 가압성형 보드의 최적 배합비 산정)

  • Lee, Jun-Cheol;Kim, Jin-Sung;Lee, Bo-kyeong;Choi, Hyeong-Gil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.182-183
    • /
    • 2019
  • In this study, the optimization of mixing proportion of press-forming board with blast furnace slag, pearlite and bottom ash was investigated using the response surface methodology. Ten Mixing proportions of specimens were designed by the response surface design, and then flexural failure load, moisture content and water absorption of specimens were measured. As a result of the reaction surface analysis based on the experimental results, it was possible to derive the optimal mixing proportion with the satisfaction of 93%.

  • PDF

A case study on the efficient construction methodology of ERP system (효과적인 ERP 시스템 구축을 위한 사례 분석)

  • 김건호;한상욱
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.2
    • /
    • pp.167-179
    • /
    • 2001
  • In this study, an overall survey of ERP system and methodology are first introduced, then an efficient way of const겨cting ERP system is suggested through a case study on S company S company has not reached the goal of ERP system as it planned and is still working on the project. The main idea for the efficient construction methodology of ERP system is that BPR (Business Process Reengineering) should be accomplished and the company should have enough time to test the ERP package and a proper ERP team organization before the ERP system is introduced. It is suggested that introduction of ERP system bring about benefits to companies in terms of effective management system.

  • PDF

A Study of Methodology for Automatic Construction of OWL Ontologies from Sejong Electronic Dictionary (대용량 OWL 온톨로지 자동구축을 위한 세종전자사전 활용 방법론 연구)

  • Song Do Gyu
    • Language and Information
    • /
    • v.9 no.1
    • /
    • pp.19-34
    • /
    • 2005
  • Ontology is an indispensable component in intelligent and semantic processing of knowledge and information, such as in semantic web. However, ontology construction requires vast amount of data collection and arduous efforts in processing these un-structured data. This study proposed a methodology to automatically construct and generate ontologies from Sejong Electronic Dictionary. As Sejong Electronic Dictionary is structured in XML format, it can be processed automatically by computer programmed tools into an OWL(Web Ontology Language)-based ontologies as specified in W3C . This paper presents the process and concrete application of this methodology.

  • PDF

Development of a new CVAP structural analysis methodology of APR1400 reactor internals using scaled model tests

  • Jongsung Moon;Inseong Jin;Doyoung Ko;Kyuhyung Kim
    • Nuclear Engineering and Technology
    • /
    • v.56 no.1
    • /
    • pp.309-316
    • /
    • 2024
  • The U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide (RG) 1.20 provides guidance on the comprehensive vibration assessment program (CVAP) to be performed on reactor internals during preoperational and startup tests. The purpose of the program is to identify loads that could cause vibration in the reactor internals and to ensure that these vibrations do not affect their structural integrity. The structural vibrational analysis program involves creating finite element analysis models of the reactor internals and calculating their structural responses when subjected to vibration loads. The appropriateness of the structural analysis methodology must be demonstrated through benchmarks or any other reasonable means. Although existing structural analysis methodologies have been proven to be appropriate and are widely used, this paper presents the development of an improved new structural analysis methodology for APR1400 reactor internals using scaled model tests.