• 제목/요약/키워드: construction methodology

검색결과 1,389건 처리시간 0.028초

Micro X-ray CT 촬영을 통한 세립 점성토의 간극비 추정 방법 연구 (Study on a methodology for estimation of void ratio of very fine clayey soil by using micro X-ray CT scan)

  • 허성준;김광염;권영철;김홍택;신휴성
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.392-403
    • /
    • 2010
  • In this study, a new methodology by using the X-ray CT scan is proposed for estimating void ratio of very fine clayey soil. Since the particle size of the clay is too fine to calculate the volume of void inside the clays, CT scanning tests with a number of clay specimens that were artificially set to have various designated void ratios have been carried out. From the tests, a relationship between the CT values and void ratios is given to be used for estimating the invisible void ratio of very fine clay from a representative CT value scanned. The linear relationship was able to be acquired finally. It is expected that micro X-ray CT scanning can be capable of capturing the void ratio of very fine soils without any errors inherent in the conventional specific gravity tests.

  • PDF

함정 수명주기관리시스템(PLM) 구축을 위한 통합 자료환경(IPDE) 구현 방안 (IPDE(Integrated Product Data Environment) Implementation Method for the Application of Naval Ship PLM(Product Lifecycle Management))

  • 정연환;유재문
    • 대한조선학회논문집
    • /
    • 제42권6호
    • /
    • pp.698-709
    • /
    • 2005
  • This research analyzes the design work and construction work, which might be arising out of or during the procurement process of naval ships of the Korean Navy. This research also suggests the applicable information methodology driven out by utilizing PLM/POM tool, which could be one of practical solutions to the problems arising from the outcome of this analysis. As to the procedure and methodology of information technology of design and construction work of the ship, IPPD was adopted. Before its actual application, main contents of the IPPD were introduced in this research. And it's real application and subsequent concrete surroundings of IPDE were defined. In addition, addition, several detailed and necessary works to be fulfilled were defined, mainly focused on the application of IPDD for the design and construction stages of the ships suitable for the Korean Navy, And also, this analysis defines the main functions to be secured by adopting the PLM/POM tool and obtained the relevant functions partially herewith.

혼성 디자인의 의미구성과 표현특성에 관한 연구 - 개념적 혼성이론의 방법론을 중심으로 - (A Study on the Meaning Construction and Expression Characteristics of Hybrid Design - Focus on the Methodology of Conceptual blending theory -)

  • 김은지;이정욱
    • 한국실내디자인학회논문집
    • /
    • 제15권2호
    • /
    • pp.81-90
    • /
    • 2006
  • This treatise makes clear not only a structural methodology of 'the conceptual blending theory' using in a linguistics could be applied to the similar process in a hybrid design but also both methods include the same meaning construction in the sense of a mutual educational system. Both methods have something in common that they are fundamentally focused on a metaphorical expression which implies poetic messages to be concentrated on a formal structure. Therefore, the purpose of this treatise is to examine the structural characteristics in the hybrid design in order to analyze the rhetorical expressions(metaphor, allegory) as symbols of communication. One of the those is intertextuality that expresses metaphorically by blending and borrowing codes and another is hypertextual space where various texts twines around each other making brand-new and diverse organizations, as the combined allegory with a number of hidden expression. Ultimately, it is important that this approach could verify whether it deals the illogical present state of a spacial form or structure with a kind of mechanism of a 'conceptual blending theory' or not.

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • 한국건설관리학회논문집
    • /
    • 제7권4호
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

A risk-based framework for design of concrete structures against earthquake

  • Hassani, Mohammadhassan;Behnam, Behrouz;Maknoon, Reza
    • Computers and Concrete
    • /
    • 제25권2호
    • /
    • pp.167-179
    • /
    • 2020
  • Optimal design of structures against earthquake loads is often limited to reduce initial construction costs, while the cost induced to structures during their useful life may be several times greater than the initial costs. Therefore, it is necessary to consider the indirect costs due to earthquakes in the design process. In this research, an integrated methodology for calculating life cycle cost (LCC) of moment-resisting concrete frames is presented. Increasing seismic safety of structures and reducing human casualties can play an important role in determining the optimal design. Costs incurred for structures are added to the costs of construction, including the costs of reconstruction, financial losses due to the time spent on reconstruction, interruption in building functionality, the value of people's life or disability, and content loss are a major part of the future costs. In this research, fifty years of useful life of structures from the beginning of the construction is considered as the life cycle. These costs should be considered as factors of calculating indirect costs of a structure. The results of this work represent the life cycle cost of a 4 story, 7 story, and 10 story moment-resisting concrete frame by details. This methodology is developed based on the economic conditions of Iran in 2016 and for the case of Tehran city.

인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석 (Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges)

  • 김종협;정인수;윤원건;김정렬;박인석
    • 한국산업융합학회 논문집
    • /
    • 제24권6_2호
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

건설현장 근로자 및 관리기사의 안전의식과 안전교육 효율화 방안 (Effective Safety Education Schemes at Construction Sites for Enhancing Safety Consciousness of Workers and Engineers)

  • 김동하;고병인;임현교
    • 한국안전학회지
    • /
    • 제14권2호
    • /
    • pp.163-169
    • /
    • 1999
  • Safety education should not only prevent workers from industrial accidents but also contribute to improve the productivity of manufacturing plants or construction sites. In practice this do not happen because workers do not realize the importance of safety education. This study aims to suggest a methodology to improve safety education of construction sites by surveying conditions of safety education and the safety consciousness of workers and engineers. The results showed that most education except regular educations were nominally carried out. Lectures and audio-visual education were mainly used as educational methods. After trainees attended the education session they completed a written survey, the most dissatisfied factor about safety education was education circumstances, of which rate was around 36%. The proportion of construction engineers who thought that safety management was contributable to cost reduction was 35%, to construction period 20%, and to quality enhancement 48%. Based on these results, this research pointed out the need to review training manuals, the development of educational programs, improvement of educational facilities to improve safety education of construction sites, and finally to discussed these issues.

  • PDF

건설시뮬레이션기법을 이용한 시스템 철골계단 공법의 생산성 분석 (Productivity Analysis of Steel Staircase Systems Utilizing Simulation Method)

  • 이경석;이정훈;김현미;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.101-104
    • /
    • 2010
  • Development and practical emerging construction technologies has been studied as one of key solution for overcoming these barriers. Many literatures indicated that effective performance evaluation methodologies are demanding for efficient applications of new technologies. This paper presents a performance evaluation methodology using construction simulation technique and introduces studies of two cases where the steel staircase system, as an new technologies was applied and where the conventional method of staircase concrete works. Productivity was measured and calculated by site observation and construction simulations. This results show the quantified influence of new technology to site personnels and assist them to make various decisions for using or not using the technology depending on their own situations.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.