• Title/Summary/Keyword: construction methodology

Search Result 1,383, Processing Time 0.035 seconds

Emission Dispersion Analysis based on the Development Density associated with Urban Planning (a case study of the Delft city on Netherlands) (도시계획에 따른 개발밀도에 근거한 도시 대기오염 확산분석 - 네덜란드 Delft시를 사례로 -)

  • Kim, In Su;Yang, Choong Heon;Hu, Hye Jung;Sung, Jeong Gon
    • International Journal of Highway Engineering
    • /
    • v.16 no.3
    • /
    • pp.21-33
    • /
    • 2014
  • PURPOSES : This study presents a specific methodology for air dispersion analysis of urban areas methodology in accordance with urban planning and transport policy. METHODS : This study performed three alternatives including development density and public transit applying integrated urban model for the Delft city on Netherlands. Based on this result, the two types of air pollutant emissions($PM_{10}$, NOx) were calculated and analyzed the emission dispersion on that City. RESULTS : As a result, the quality of air near the City is better than that of current conditions showed that approximately from 2.1 to 7.9% according to alternatives. CONCLUSIONS : Air quality assessment in urban areas can be reasonably performed by applying a methodology when urban development and transport policy are considered.

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

OPTIMIZATION OF THE PARAMETERS OF FEEDWATER CONTROL SYSTEM FOR OPR1000 NUCLEAR POWER PLANTS

  • Kim, Ung-Soo;Song, In-Ho;Sohn, Jong-Joo;Kim, Eun-Kee
    • Nuclear Engineering and Technology
    • /
    • v.42 no.4
    • /
    • pp.460-467
    • /
    • 2010
  • In this study, the parameters of the feedwater control system (FWCS) of the OPR1000 type nuclear power plant (NPP) are optimized by response surface methodology (RSM) in order to acquire better level control performance from the FWCS. The objective of the optimization is to minimize the steam generator (SG) water level deviation from the reference level during transients. The objective functions for this optimization are relationships between the SG level deviation and the parameters of the FWCS. However, in this case of FWCS parameter optimization, the objective functions are not available in the form of analytic equations and the responses (the SG level at plant transients) to inputs (FWCS parameters) can be evaluated by computer simulations only. Classical optimization methods cannot be used because the objective function value cannot be calculated directely. Therefore, the simulation optimization methodology is used and the RSM is adopted as the simulation optimization algorithm. Objective functions are evaluated with several typical transients in NPPs using a system simulation computer code that has been utilized for the system performance analysis of actual NPPs. The results show that the optimized parameters have better SG level control performance. The degree of the SG level deviation from the reference level during transients is minimized and consequently the control performance of the FWCS is remarkably improved.

GNSS-Based PHC Pile Cutting Position Sensing Methodology (GNSS 기반 PHC 파일 절단위치 센싱 방법론에 관한 연구)

  • Cho, Se-Hyun;Yoou, Geon-Hee;Kim, Jun-Sang;Lee, Jun Ho;Hur, Je;Kim, Young Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.387-388
    • /
    • 2023
  • PHC pile head cutting is an essential work in pile foundation construction. However, since the work has labor-intensive characteristics, there are problems such as productivity and safety. So in previous study PHC pile one-cutting head cutting automation equipment was developed to solve this problem. However, it has been investigated as a limitation that checking the cutting position of the PHC pile can be challenging in place where a rotary laser leveler cannot irradiate cutting position, as the sensing unit of the developed automated equipment utilizes an optical method. Therefore, the objective of this study is to delvelop a GNSS-based methodology for sensing the cutting position of PHC piles to overcome the limitations of the optical method and to examine its feasibility for field application. If the proposed methodology is applied to the construction site, it is expected that the convenience and productivity of the PHC pile cutting position sensing work will be improved.

  • PDF

The construction project's risk threshold calculation methodology applying a concept of VaR (VaR개념을 응용한 건설공사 위험허용도 산정방법)

  • Kim Seon-Gyoo;Kim Jae-Jun;Kim Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.65-72
    • /
    • 2001
  • With the recent rising project complexities and competitive environments in the construction projects, a risk management is recognized as more important management tool than the others. However, as most risk management techniques applied to the construction projects are centered around their initial phases and risk analyses, they are not developed into general project management technique such as time management, cost management and quality management, etc., that are usually applied in the process of construction. Thus, this paper proposes a response process to construction project risks based on the risk threshold and its calculation methodology applying a concept of VaR to establish risk management as general management technique in the construction projects.

  • PDF

A Study on the Methodology for planning Construction Accident Prevention (건설안전 대책수립의 방법론에 관한 연구)

  • Son, Ki-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.2 no.1
    • /
    • pp.43-49
    • /
    • 1987
  • Currently, Safety accidents have been raised & more concerned despite that Government has emphasized on preventing accidents in construction area of Korea. An accident is due to several causes of it, thus this the study, as the above, will specify the methodology to establish more effective safety prevention plan, itself, compared to most studies being based on a case, specially for the projects under Far-East District, Corps of Engineers, USA. Additionally, this study will be limitted for performance method and the projects will not be classified with the same sorts as domestic ones are.

  • PDF

A Study on the Internet Based Monitoring System (인터넷 기반 계측관리시스템에 관한 연구)

  • 한병원;허인욱;조충붕
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.635-642
    • /
    • 2002
  • In this study, a new internet-based methodology to manage the data acquired during the construction and maintenance of structure is study A new internet-based monitoring system to obtain and to manage the measured information regardless of physical location of each user was developed. This method provided an enhanced integration methodology for construction management by implementing common internet or intranet platform

  • PDF

Actual Condition and Extended Suggestions of Legal Management of Construction Enterprise in Korea (건설기업 법정관리의 실태와 향후 과제)

  • Kim, Jin-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.208-209
    • /
    • 2013
  • In recent times, the legal management of construction enterprise has become one of important theme in the domestic construction industry. Therefore, the objective of this paper is to consider rational methodology of legal management of construction enterprise. To achieve this objective, this paper performs a case study about the major cause and significant characteristic of the legal management. In conclusion, the following factors are systematized : 1) actual condition of legal management of construction enterprise in korea, 2) the influence and extended suggestions of legal management.

  • PDF

A Case Study of Chulik Construction in Early 16th Century -Based on the Shroud from Heumjo Kim`s Grave- (16세기 전기 철릭의 구성법 일례 -金欽祖(1461~1528) 분묘 출토의 철릭을 중심으로-)

  • 이은주
    • The Research Journal of the Costume Culture
    • /
    • v.7 no.2
    • /
    • pp.242-256
    • /
    • 1999
  • A Study on the construction of Chulik in the early 16th century based on the shrouds from the excavated grave of Kim, Heum-Jo(1461∼1528) is reported in this paper. This paper first reviews the general construction methodology found in the shrouds from other graves in early 16th century revealed from a report on Chulik from the excavated grave of Kim, Heumjo. This paper finds that there exist at least three different Chulik forms according to the ratios between upper portion and lower portion in Chulik. The upper portion to the lower portion ratio grows with time. Among the three forms, this Chulik of interest falls in the first one of the three forms. This new finding of the chronological evidence for the first category of the three forms provides us the latest chronology for the first category, which is up to the year 1567. This paper also shows that the second and the third categories of Chulik in early Chosun Dynasty lasted until 1580\`s and until 1590\`s, respectively. Several remarks on construction methodology found in the Chulik of interest are also reported in this paper.

  • PDF

Infrastructure Asset Management System Methodologies for Infrastructure Asset Management System in U.S.

  • Lee Sang-Youb;Chung Seung-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.67-72
    • /
    • 2003
  • Infrastructure asset management is a methodology for programming infrastructure capital investments and adjusting infrastructure service provision to fulfil established performance, considering the life-cycle perspective of infrastructure. In this study, the methodologies for infrastructure asset management system implemented in sewer management system, bridge management system, pavement and highway management system, and embankment dam management system are described with focus on the system in U.S. As the major methodology to support the decision-making for asset mangers to better allocate the limited funds to the area needing it the most. various demand forecasting methodologies used in wastewater, water, transportation, electricity, and construction are also introduced for their applicability towards infrastructure asset management.