SYSTEM ARCHITECTURE FOR INTEGRATION OF CONSTRUCTION E-BUSINESS SOLUTIONS: A MODEL FOR ENTERPRISE RESOURCE PLANNING AND PROJECT MANAGEMENT SYSTEM

  • Boong-yeol Ryoo;Irtishad U. Ahmad;Juan Zheng
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.497-502
    • /
    • 2005
  • Needs of automation and computerization in the construction industry has been recognized but the implementation of e-business solutions with project management systems has not been fully explored. In order to cope with different management practices in home office and project sites, integration of two popular systems, Enterprise Resource Planning (ERP) and Project Management System (PMS) is essential. The objective of this study is to find ways to functionally and systematically integrate ERP and PMS. With the integration of ERP and PMS, a project will be managed much more efficiently and effectively. It is expected that this study will benefit system integrators and help them to understand construction management processes and integrate the solutions with minimized programming work.

  • PDF

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Research on eco-friendly construction management plan for construction site through waste fiber resource recycling technology (폐섬유 자원재활용 기술을 통한 건설현장 친환경 시공관리 방안에 관한 연구)

  • Kim, Dae-Geon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.45-46
    • /
    • 2022
  • Recently, it is necessary to establish an eco-friendly construction system through recycling of waste material management at construction sites. This is required to reflect the times that require a carbon reduction system in construction as part of domestic and overseas carbon dioxide reduction. Therefore, we intend to establish eco-friendly construction management as part of resource recycling and carbon reduction through recycling technology for waste fibers generated at construction sites.

  • PDF

건설 안전관리 체계의 개선 방안에 관한 연구

  • 김세영;안병수
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2000.05a
    • /
    • pp.9-26
    • /
    • 2000
  • Eventually so as to realize the construction safety, 1 found out the cause of accident and specificities of the construction industry. This study presented to several situations and problems on construction safety. As a result of this study, the below matters must be improved for more effective the construction safety management system. 1. It need to introduce the total construction safety management system. Because there is not effectiveness in the current safety management to the first on the construction field. a. We must consider the safety in the whole parts of the process of the construction and constructors of each part must devide responsibility of the construction safety as a CDM(The Construction Designed Management) used in UK. b. It is desirable to proceed control of safety in the whole parts of the construction to introduce the total safety coordinator that can consult the matters of safety as a law accepted in EU. c. Like management of the construction safety in USA, direction of the construction safety must be made to work exactly by code or manual. d. To improve the organization of the construction safety on the construction field unefficient, it must be introduced safety supervisor, safety coordinator or institutionalization of safety consultant. 2. The law of the construction safety not only have wasteful element but also decrease efficiency by overlapping of regulation, The Ministry of Labour and The Ministry of Construction & Transportation, So laws related with safety must be instituted. a. To realize total safety management, The Ministry of Labour must legislate the basic law about safety management in whole field. b. To legislate the construction safety under one law, and improve efficiency of the overlapping of regulation and the similar law by The Ministry of Construction & Transportation. c. It must be made the law of construction safety that can proper to change of situation in construction. d. The standard of safety must be instituted belong to international level and improved by year. e. We must improve irrational regulation to realize activity of safety self regulating for progress competition in construction industry

  • PDF

A Study Of the Construction Management Applied to BAT Korea Factory Construction Project in Korea (BAT Korea Factory 건설 프로젝트의 CM 적용사례 연구 - Cost Management 사례를 중심으로 -)

  • Kim Duk-Kon;Kwon O-Kyung;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.48-57
    • /
    • 2003
  • BAT Korea's Factory is the one of the major projects that clearly confirms and demonstrates that Construction Management (CM), provided by a Korean CM Company to the foreign clients, enables them to successfully complete projects; with savings in time and reduction in cost, which it is $15\%$ lower than the cost of the overseas construction. Also, throughout the thorough schedule management, it was possible to commence with manufacturing one month after the completion date. The Key Success Factors was generated by the excellent construction management skills, and more importantly by the confidence gained by the client in giving a CM company full authority for the construction management of the project. This study has focus on elements of construction management applied to this project throughout the concept of 'One Stop Shop', including cost managements, contract management and value engineering etc. We hope that this study will provide useful data to enable public clients to take advantages of construction management, in a similar way to. the private clients, who have already implemented CM actively.

  • PDF

Extraction of Pivotal Entities of Construction Project Management using the CMBOK Framework (CMBOK Framework을 이용한 건설 프로젝트 핵심관리요소의 도출)

  • Lee Jong-Kook;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.140-148
    • /
    • 2004
  • Based on the CMBOK (Construction Project Management Body of Knowledge) Framework previously developed in early study by the authors in conjunction with use of some questionnaire surveys and personal interviews with industry professionals, the authors analyze interactions among the entities in the CMBOK framework for the extraction of pivotal entities of construction project management and identify twelve pivotal entities in construction project management, then verify the existence of twelve pivotal entities in real construction project management of construction company and checked the validity of the entities with a real case of interaction phenomenon. This research provides the construction industry with a starting point for improving construction project management efficiency by identifying the pivotal entities.

A Study on the Improvement of Safety Management of Public Sector in the Construction Industries (공공부문의 건설공사 안전관리 개선방향에 관한 연구)

  • Shin, Dong Hyuk;Lee, Myeong Gu;Yoon, Young Geun;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.5
    • /
    • pp.78-86
    • /
    • 2019
  • Various safety measures have been established and implemented in order to reduce construction accidents. However, statistics data on at construction sites still show higher accident and mortality rates than other industries. As a result of investigating the causes of accidents occurring in the construction industry, most accidents resulted from the failure of the system. Therefore, the existing safety management system of the construction site is monitored so that it operates properly in the field, and it is an important factor to actively participate in construction work. In order to overcome this, the government emphasized on-site inspections and planning and implementation confirmation by public institutes to ensure the effectiveness of the safety management system through amendment of the Construction Technology Promotion Act, but the orderer' safety capability and manpower are insufficient at present. Therefore, in this study, the safety management system, such as design for safety, safety management plan, safety check, safety management cost, etc. specified in the Construction Technology Promotion Act, is regularly checked and confirmed to improve the effectiveness of the safety management system as well as to improve the safety management system of the construction site by deriving measures to strengthen the public function of the government.

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

A Study on the Management Information System for Supporting the Supervision of Construction Workplace (건설감리실무 지원을 위한 정보관리시스템 구축에 관한연구)

  • Noh, Dae-Won;Jeong, Byong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.85-93
    • /
    • 2003
  • The purpose of this study was to construct the management information system for supporting the supervision of construction workplace. For the purpose, firstly, this study surveyed the present states and the problems of construction workplace in Korea. And then, defined the range and the process of the supervision of construction workplace, and examined the information standards of construction and the CALS standards for supporting. As a result, this study proposed the first stage of management information system, which consists of several basic functions, such as, document management, system management and partially, duality management and construction information management.

CREATING TOTAL PROJECT MANAGEMENT SYSTEM ON APPLYING LEAN CONSTRUCTION

  • Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.41-49
    • /
    • 2007
  • GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF