The information and communications construction business has the characteristics of an infrastructure industry and responsibility for the construction and maintenance of all ICT infrastructures. With the recent proliferation of the smart convergence of various industries based on ICT infrastructure, the role of the information and communications construction business has been highlighted to accommodate the convergence and implementation environment in construction and medical industries. Therefore, this paper seeks policy measures to establish the new role of the information and communications business under the rapidly developing smart convergence environment and the priorities of policy measures to strengthen the capability of the information and communications business using a quantitative model. The analysis result suggests that the difference in importance of each policy measure should be considered in order to execute effectively the policy of promoting the information and communications construction business. Given the constraint of limited budget, policy priorities include the development of new markets, and establishment of incentive for new technology. This study is significant for its theoretical contribution, being the first quantitative approach to policy priorities for the promotion of information and communications construction business under the smart convertgence environment.
International conference on construction engineering and project management
/
2024.07a
/
pp.495-500
/
2024
This paper aims to make clear the transition process of information transfer in wooden post and beam construction in Japan during the introduction and development of machine precutting technology. The machine precutting technology started from 1970s and developed toward line production or automated CAD-CAM production and have got over 90 % market share in the Japanese newly built wooden houses. Based on literature review and interviews with manufacturers of precutting machines, the transition of wooden post and beam construction houses was divided into four periods: i) before the introduction of precutting, ii) the introduction of precutting (the early stage), iii) the automation of precutting, and iv) the maturity of precutting, and the review reveals how the information of design and processing was made and transfered in each period. In addition, the modeling and comparison of information transfer in each period visually shows the transition of information transfer with the development of machine precutting technology. Before the introduction of precutting, when carpenters were responsible for the generation of both design and processing information, information was coordinated at each stage of the process based on expert knowledge, but highly precise and uniform processing of machine precutting reduced the need for such coordination skills. On the other hand, the review suggested that the precut processing technology has changed step by step based on the traditional technical system, which has maintained the rational transfer of information.
Journal of the Korea Institute of Building Construction
/
v.13
no.6
/
pp.619-626
/
2013
Many pictures are taken at a construction site, but the information of the pictures is not managed in an efficient and systematic manner. For this reason, when a construction worker has scant field experience or knowledge, it is hard to communicate with others efficiently. Therefore, the information of the pictures taken is not fully utilized in any deliberation or conflict among interested parties, facilities maintenance, and construction of another structure, although they were taken for those purposes. This study discusses the need for combining vector-photos with image and 5W and 1H information, and develops a prototype module for creating vector-photos and saving them in a server. The vector-photos taken can be saved to a server in real time, and efficiently managed by a DB system. If a system to link the vector-photos with a BIM model is developed in the future, it is expected that the vector information in the picture can be connected with the property information of an object. As a result, the vector-photos can be utilized in more diverse ways.
Korean Journal of Construction Engineering and Management
/
v.2
no.4
s.8
/
pp.99-106
/
2001
Construction workers occupies only $10{\%}$ of the entire industry, but the $30{\%}$ of the critical accidents in whole industry occurs in construction industry. Since there are many dangerous process and lack of safety information measures in the construction industry, both short and long term operation in education, training, and information are necessary. Examples for existing accidents in construction sites will be very useful for preventing accidents. And if the research for individual accidents perfectly achieved, it will give valuable information to construction sites which will be very useful for preventing accidents. The object of this study is to develop construction safety information system to give safety information to construction process by work field. The data base are made from 860 major accidents mostly in buildings and apartments in year 1999 through 2000(KOSHA).
International conference on construction engineering and project management
/
2013.01a
/
pp.274-278
/
2013
Over the past several years, the building codes that govern commercial building construction have become increasingly prescriptive in nature, specifying detailed information related to the design and installation of the systems, while offering no reasoning behind their prescriptive measures. For example, metal stud framing is commonly used in commercial building construction to create bearing walls and non-bearing partition walls. BIM provides a powerful platform for developing and implementing "pre-planning" tools and methods to facilitate both engineering and administrative controls during construction. This paper discusses the use of BIM to enhance constructability for commercial building construction activities, specifically metal stud framing. Using specific real-world examples this paper demonstrates ways that BIM can be used to foresee potential construction issues and motivates and informs future uses of BIM technologies
Proceedings of the Korean Institute of Building Construction Conference
/
2017.11a
/
pp.183-184
/
2017
Some of the information created during the design phase of an New NPP life cycle is useful only for the execution of the construction phase; however, much of the information greatly impacts the longer-term operational phase. To most make use of design and construction information produced by data based design system during the construction and operation phase, This research is identified controlled data and drawn design information of controlled equipment from documents generated during the life-cycle stages. This study aimed to analyze related documents to assure traceability of controlled equipment from design phase through O&M and then suggested DB(Data Base) based control method on technical information of major equipment throughout nuclear power plant lifecycle.
Underground constructions continue to provide challenges to Geotechnical Engineers yet they pose the best opportunities for development and deployment of advance technologies for analysis, design and construction. The reason for this is that, by virtue of the nature of underground constructions, more data and information on ground characteristics and response become available as the construction progresses. However, due to several barriers, these data and information are rarely, if ever, utilized to modify and improve project design and construction during the construction stage. To enable the use of evolving realtime data and information, and adaptively modify and improve design and construction, the paper presents an analysis and design system, called AMADEUS, for underground projects. AMADEUS stands for Adaptive, real-time and geologic Mapping, Analysis and Design of Underground Space. AMADEUS relies on recent advances in IT (Information Technology), particularly in digital imaging, data management, visualization and computation to significantly improve analysis, design and construction of underground projects. Using IT and remote sensors, real-time data on geology and excavation response are gathered during the construction using non-intrusive techniques which do not require expensive and time-consuming monitoring. The real-time data are then used to update geological and geomechanical models of the excavation, and to determine the optimal, construction sequences and stages, and structural support. Virtual environment (VE) systems are employed to allow virtual walk-throughs inside an excavation, observe geologic conditions, perform virtual construction operations, and investigate stability of the excavation via computer simulation to steer the next stages of construction.
The purpose of this study is to establish a novel system for on-site management of construction and demolition waste. Construction waste has always been one of largest waste in the world and has long lacked an effective management system. Although various countries have planned the disposal of waste at the political level, the real-time and effective management of construction sites has not been mentioned. Especially in China, the continuous development of the construction industry also generates a large amount of waste, and China is not prepared for a large amount of construction waste. In order to alleviate the huge impact of construction waste on society and the environment, this study proposes a waste management method that combines Building Information Modeling technology and Radio Frequency Identification technology. Through this research, by using information technology to manage the generation and discharge of construction waste, and record the amount and information of waste generation, also improve the management method of construction waste.
International conference on construction engineering and project management
/
2015.10a
/
pp.195-199
/
2015
Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.189-190
/
2011
The purpose of this study is to suggest the development direction for vendor management in plant construction. Therefore this research has proposed the integration management of vendor and information standardization. This research has proposed that plant industry association manage the basic information of vendor. And each company manage the performance evaluation of vendor's firm. Expecially, vendor management system should be developed by ISO information system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.