Journal of Construction Engineering and Project Management
/
v.1
no.2
/
pp.18-27
/
2011
Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies have shown. However, considering all the firm's aspects in a competitive way is a crucial process for the ECF's culture. This research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance at the organizational level, and to explore its impact on the organizations that adopt QMS. This model is based on specific elements and their related indicators which have been derived from national approaches and models of MP. This model determines the performance level (PL) of the organization that is measured by means of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the ECFs. This model has been validated using another questionnaire and the majority of surveyed experts agreed that the proposed model can be applied effectively.
International conference on construction engineering and project management
/
2009.05a
/
pp.369-374
/
2009
Project-based joint ventures are often used in the construction industry to assemble an organization that meets a client's project needs and matches or exceeds the capacities of competitors. The joint venture / partnerships provides the means for a firm to quickly add resource, political, technical, or other required strengths that will increase project acquisition. This paper sets out to study the types of joint ventures, different issues or problems while having joint ventures and the critical factors that contribute to successful joint ventures. A questionnaire was designed and administered to survey the issues and present practices of joint ventures in the South Florida construction industry. Along with the questionnaire, personnel interviews were also conducted to get first hand knowledge about the subject matter. The results are presented in the paper. These results specifically identify the overall practice of joint ventures in South Florida as well as indicate the most significant factors leading to failure or success of these ventures.
This paper suggests the establishment of construction arbitration tribunal in The Korean Commercial Arbitration Board or the construction arbitration institution under the Ministry of Construction for effective system of Construction Arbitration. Our conclusion tells that it is desirable to establish construction arbitration institution under the Ministry of Construction upon the result of analyzing some factors such as participation of construction workers, sophistication of construction field. In contrast, it is more desirable to establish the construction arbitration tribunal in The Korean Commercial Arbitration Board when we consider the feasibility, sophistication of ADR, organization, rules, arbitrator availability, internationalization Therefore, our final suggestion is to establish construction arbitration tribunal in The Korean Commercial Arbitration Board for effective system of Construction Arbitration. More detailed are as follows: . Establishment of the committee for resolution of construction disputes consisting of experts and specialists from construction-related institution, union, law firm and universities. 1 The committee manages finance, rules on construction arbitration and arbitrator members. 1 Establishment of intermediation team, construction arbitration team, housing arbitration team, real estate arbitration team under the construction arbitration tribunal . Establishment of a committee of arrangements consisting of experts and specialists from The Korean Association of Arbitration Studies, Korea Arbitrators Association, The Korean Commercial Arbitration Board, The Construction Association of Korea in order to accomplish effective system for construction arbitration.
At the contract for power plant construction, the penalty appropriation on performance decrease is signed between ordering organization and construction firm. In this, the penalty cost signed must be reasonable value that both of ordering organization and construction firm can accept, therefore the methodology for penalty appropriation is very important. Cogeneration is a system that produces electricity and heat at the same time, therefore the penalty appropriation for cogeneration should be uncertain. Thermoeconomics analyzes various energy costs, however the relation of thermoeconomics and penalty cost may not be analyzed up to now. The aim of this study demonstrates that thermoeconomics can be applied to the penalty appropriation at the performance acceptance test. As the result of CGAM system, if the construction cost is $10,000,000, the value of $6,665,688 was appropriated to the electricity production performance and the value of $3,334,312 was appropriated to the heat production performance. Therefore if one percentage at the electricity production performance decreases, the penalty is $6,666, and one percentage at the heat production performance decrease, we can understand that the penalty is $3,334.
International conference on construction engineering and project management
/
2009.05a
/
pp.558-565
/
2009
In recent years, the demand for green buildings is growing fast due to legislative and social pressures. Construction organizations, which play an important role in promoting building industry growth, are facing with challenges on how to adapt themselves to enhance sustainability of the buildings. In this paper, the green value chain and system frameworks, an extend application of Porter's value chain and system models, are introduced. Based on deep analysis of the green value chain and system frameworks, a revolution model for construction organizations towards green building is created. Management factors critical for a successful green building project, at the firm and project organization level, are extracted. Furthermore, external critical relationships are also identified. Fully understanding of these management factors and the model can help and enable practitioner to know what new capabilities should be deployed and developed in the long run for maximizing sustainability.
J.L. Park;S.S. Kim;D.J. Kwark;J.G. Park;J.H. Kim;J.J. Kim
International conference on construction engineering and project management
/
2013.01a
/
pp.315-320
/
2013
The aim of this study is to compare efficiency and Total Factor Productivity(TFP) between Korean and Japanese construction firms in Korea and Japan over the period of 2005-2011. The results of this study are as follows. Efficiency scores of Korean construction firms are 0.797, and Japanese construction firms are 0.921. Second, annual total factor productivity growth of Korean construction firms is 0.5% and technical progress do much for TFP decrease. However Japanese construction firms marked annual increasing of 2.5% of TFP. Third, technical progress contributed in TFP increase of construction firms in Korea. Korean construction firms, however, relatively lagged behind Japanese construction firms in technical progress. Therefore, Korean construction firms need strategies to achieve technical advances including adopting new technology or process innovation to maintain competitiveness, survive, and develop in the future competition with Japan.
In recent years, academic scholars and practitioners have given increasing attention to the importance of strategic performance measurement systems including both financial and non-financial performance metrics. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps an enterprise to translate strategic objectives into relevant performance within an organization. While the current literatures and management articles offer BSC design and implementation. there are few reports of detailed validation of using the rationalized sets of CSF (Critical Success Factors) and KPI (Key Performance Indicators) for the Korean construction industry. This paper first propose the perceived sets of CSF/KPI using current literatures and validate with a major construction company's executives and senior managers in Korea. The paper then examines whether the perceived sets of CSF/KPI have co-relationships with the firm performances. The results of the research contribute in heightening of competitiveness of the Korean construction companies in strategic and performance management.
Korean Journal of Computational Design and Engineering
/
v.9
no.1
/
pp.77-91
/
2004
Integrating computer-aided design with computer-aided fabrication and construction will fundamentally redefine the relationship between design and construction. Rapid prototyping(RP) is evaluated as one of the integration method available but it has been regarded as very expensive and complex design evaluation tool and is only suitable for large mechanical design shops in automobile and aerospace industry. However current status of rapid prototyping is changing since the new generation of RP equipment, less expensive and more user-friendlier, now can be installed and use in design firms. Simultaneously increasing use of 3D CAAD software is also helping to use rapid prototyping widely. It is crucial to acknowledge rapid prototyping technologies are not only for avant-garde architect such as Frank O. Gehry but ordinary 90% architects, who can have benefit from fast and cost-effective technology. With its fast development and adaptation in architectural industry, it is quite necessary to include rapid prototyping education in regular CAAD courses either undergraduate or graduate level.
The Journal of Asian Finance, Economics and Business
/
v.8
no.7
/
pp.215-224
/
2021
This article emphasizes the consequences of exploring the relationship between sustainable development practices and non-financial performing factors. Also, it investigates the combined effects of the transformational leadership style on the relationship between sustainable development practices and non-financial performing factors. Using primary data sources, this study reviews the literature on the relationship between the factors of the effectiveness of sustainable development practices of Jordanian contractors and non-financial performance. A total of 290 questionnaires were personally distributed to contractors in the Amman district in Jordan. Only 253 questionnaires were returned and usable for further analysis, which represents a response rate of 87%. Data was collected from October 2020 until April 2020. Hypotheses were tested through multiple regression analysis, and hypotheses for interacting effect were examined through hierarchical multiple regression analysis. Based on the results of the analysis obtained there is a significant effect on the relationship between sustainable development and non-financial performances. It shows that construction companies involved in sustainability practices will able to improve their performance, which contributed significantly toward the overall firm's performance. Whereas, results from hierarchical multiple regressions showed that transformational leadership had no moderation effect on the non-financial performance in such a way that reaches a higher firm performance level.
International conference on construction engineering and project management
/
2013.01a
/
pp.94-102
/
2013
The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.