Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

'Knowing' with AI in construction - An empirical insight

  • Ramalingham, Shobha;Mossman, Alan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.686-693
    • /
    • 2022
  • Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.

  • PDF

Study on the Influence of Stakeholders in Construction Projects

  • Rajeev, S.;Kothai, P.S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.8-11
    • /
    • 2014
  • The interactions and interrelationships between stakeholders largely determine the overall performance of a construction project, and have the crucial responsibility for delivering a project to successful completion. An important component of stakeholder management is stakeholder analysis. Two case studies are conducted within Kerala (India). The main objective was to carry out stakeholder analysis using stakeholder organiser deluxe software, considering the data's collected from the project execution team using questionnaire. During data collection the key stakeholders were identified, to know how to manage them, their interest, power, attitude level etc, for quality improvement. Analyze the results using the software Stakeholder organizer deluxe and modeling of stakeholders is to be done. Finally validate the models of the projects. These findings may mainly reflect the stakeholder management environment in the respective regions of project implementation.

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • v.10 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

Concrete Quality Management for Unexpected Weather Condition (겨울철 기상이변시 콘크리트의 대응)

  • Han, Sang-Yoon;Park, Kyung-Taek;Son, Ho-Jeong;Baek, Dae-Hyun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.95-97
    • /
    • 2010
  • This study revealed unusual weather phenomena by comparing and analyzing monthly average temperature and amount of snowfall for the past 10 years, and, based on the weather phenomena, analyzed damage cases of concrete structures in winter. As a result, the temperature for the recent one year became greatly low compared with the monthly average for the past 10 years, and the snowfall increased by 4-5 times compared with the past, so that the frost damage of concrete structures also greatly occurred. Accordingly, in case of concrete construction, because there may occur various variables owing to abnormal weather conditions, it is required that thorough quality control should be performed even from the stage of construction plan, execution and maintenance.

  • PDF

A Basic Study on the BIM Service Based SLA for Setting the Application Level of BIM in the Procurement Phase (발주단계에서 BIM의 적용수준 설정을 위한 SLA 기반의 BIM 서비스에 관한 기초연구)

  • Kim, Ji-Yun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.251-252
    • /
    • 2016
  • Recently policy and clouding system to mandate the introduction of BIM in construction industry, various sensors technology, BIM in ICT technology and fusion, such as 3D scanning and printing technology has been further activated. However, the expression level of diversification associated with it, plan within one of the BIM project, design, engineering, it is difficult to have a different application has been consistent for each field, such as construction. Thus fell the efficiency of BIM apply, it is difficult to determine the appropriate level of BIM in the business early stage in order destination of position. In this study, in order to solve this problem, by utilizing SLA used in the IT field, it attempts to explore scheme which can be evaluated targeted level of BIM suitable for business in the planning phase.

  • PDF

INVESTMENT EVALUATION OF TRANSPORTATION INFRASTRUTURE PROJECTS USING BINOMIAL REAL OPTION MODEL

  • Qiyu Qian;Xueqing Wang;Charles Y.J. Cheah
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.563-572
    • /
    • 2007
  • Transportation infrastructure is critical to economic growth of a country such as China. Careful evaluation of investments in traffic infrastructure projects is therefore pertinent. As traditional evaluation methods do not consider the uncertainty of future cash flows and mobility during project execution, the real option approach is gradually gaining recognition in the context of valuing construction and infrastructure projects. However, many of the cases only evaluate individual options separately although multiple options often exist in a typical large infrastructure project. Using a highway project in China as a case study, this paper first evaluates a deferment option and a growth option embedded in the project. Subsequently, the values are combined using the fuzzy analytical hierarchy process. It is found that the combined value is less than the sum of the two option values. This finding is consistent with the theoretical observations given in past real option literature despite the use of a different approach.

  • PDF

EVALUATING THE FEASIBILITY OF THE HIGHWAY ENGINEERING SCHEDULE USING SIMULATION TECHNIQUE

  • Liu Weijun;Yuan Jianbo;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.897-901
    • /
    • 2005
  • In the highway engineering, the performance, quantity and status of machines available for the project have direct impact on the project time. For instance, the status of machines, such as working or in trouble, have great influence on the activity execution. Therefore, while scheduling the project, the project manager always increases the spare machines or prolong the activity time to avoid delaying the project time when some of the machines are in trouble in construction site. However, how many are the spare machines and how long are the prolonged activity time, which are estimated subjectively by the manager. This subjective estimation has been criticized for systematically overestimating or underestimating quantity of the machines and the activity time. In the paper, we propose and prototype a model to simulate the status of the machines in construction site, and then to evaluate the schedule feasibility considering the performance, quantity and statues of the machines involved.

  • PDF

Challenges and Future of Prefabricated Pipe Spools

  • Tadwalkar, Sahil;Lee, Yujin;Fischer, Martin
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.678-685
    • /
    • 2022
  • Prefabrication is a construction technique that is increasingly being applied to different building components due to its many benefits, including higher quality and lower waste. Despite these advantages, there are challenges in execution of these components on projects, due to transportation logistics, skilled labor requirements, and project management techniques. This paper investigates the current landscape of prefabricated pipe spools and potential solutions for minimizing these challenges. The scope of this research includes a proposed workflow, to standardize implementation of these components. Semi-structured interviews were conducted with industry professionals to assess current industry practices and the validity of the proposed workflow. Findings of this paper indicate that greater integration between design, fabrication and transportation is required to minimize inefficiencies when implementing prefabricated pipe spools on projects.

  • PDF

Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF