• Title/Summary/Keyword: construction engineers

Search Result 4,550, Processing Time 0.036 seconds

Changes of Tide Velocity and Direction with Saemangeum Project (새만금사업에 따른 조류속 및 유향 변화(농지조성 및 농어촌정비))

  • 김정균;송기일;최진규
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.66-71
    • /
    • 2000
  • This study was carried out to investigate the changes of tide velocity and sea bottom topology during the construction period of sea dike. The tide velocity and sea bottom depth were measured in Saemangeum area every year, and analyzed and compared to the initial data. The current and future changes of the tide velocity and direction according to the construction of Saemangeum sea dike were presented.

  • PDF

Impacts of Yongdam dam managment Plan on Daechung dam Storage (용담댐 관리계획이 대청댐 저수량에 미치는 영향)

  • 박정남;이재면;김태얼
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.550-555
    • /
    • 1999
  • yongdam multipurpose is under construction to divert a part fo Geum riverlfow to Mankyung watershed and to supply the domestic water to the Chunju region and produce the hydro-electricity. Generally construction of dam by the method of inther-region water transfer affects the quantity and quality of water inthe down streams and reservoirs. The impact of operation plan of Yondgam dam on the quantity and quality of water in the Guem river and Daechung dam was investigated .It was recommended that the discharge of water transfer from one watershed to another should be minimized as much as possible.

  • PDF

The Valuation of Economical Efficient for Construction Cost of Ground Electrodes in Distribution Lines (배전선로용 접지전극 재료별 공사비의 경제성 평가)

  • Shim, Keon-Bo;Kim, Kung-Chul;Lee, Hyung-Su;Park, Jae-Duck;Park, Sang-Man
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.293-297
    • /
    • 2006
  • To receive size of same ground resistance by form of construction work of ground electrode, there is difference of amount or price of used resources, and should construct ground electrode little more effectively because appear to differ in life period according to nature of ground electrode resources, but should consider economical efficient.

  • PDF

A Study on the Criteria for Appointment of Safety and Health Managers in the Construction Industry (건설업 안전·보건관리자 선임기준 개선 방안에 관한 연구)

  • Lee, Yeonsoo;Park, Yongkyu
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.110-115
    • /
    • 2014
  • The construction accidents which had been on the downward trend for the past decades have increased for five consecutive years since 2008. In order to let the increasing trend of construction accident slow growing or switching to decline, various efforts are required of all members in construction industry such as government, employers, construction engineers, safety managers, construction workers, etc. Although the criteria for appointment of safety managers in construction site introduced in 1982 have contributed to prevent construction accident as a forefront for the past 30 years, it has not been a remarkable improvement in the safety manager's status and roles which have been required to change according to the changes of circumstances and environments. In associated with a newly introduced the criteria for appointment of health managers in construction site in the year 2015, the problems such as role, status, number of safety and health managers are needed to be considered comprehensively and improved widely. In this study, we propose several improvement plans which will improve the current criteria for appointment of safety and health managers in construction sites.

Intelligent management system for tunnel under construction using ITIS (Intelligent Tunnelling Information System)

  • Kim Changyong;Hong Sungwan;Bae Gyujin;Kim Kwangyeom
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.170-175
    • /
    • 2003
  • Ground and rock mass considered in tunnelling have characteristics such as uncertainty, heterogeneity and structural complexity because they have been formed undergoing various geological events for a long period. So, it is difficult for engineers to predict behaviors of rock mass in tunneling. In the paper the authors describe the development of an integrated expert system prototype for site investigation, design and construction in tunnelling and introduce the case applying this system to the tunnel construction site under construction. Geostructure Research Group in Korea Institute of Construction Technology (KICT) has developed the system during the past 4 years. The system mainly consists of several modules which is related to the design, construction and management of tunnelling. The test site, Neung-dong tunnel is located in Ulsan, Korea. The geology map shows it may confront big fault zone whose width is over kilometres. With the networking system of ITIS, various information of face mapping, monitoring and other construction task can be transmitted into the database and GIS Server at real time. And necessary analyses can be carried out with the modules equipped in the system.

  • PDF

A Case Analysis of the Economic Impact on Accidents during Excavation (터파기 공사 사고의 경제적 영향 사례분석)

  • Go, Kwang-Ro;Lee, Ghang;Choi, Myung-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.7-10
    • /
    • 2008
  • As the land price in the downtown area increases, buildings are becoming bigger, deeper and higher. Consequently, the importance of underground construction has increased. Although construction engineers make every effort to complete underground construction without any problem, construction failures like landslides and the collapse of a retaining wall occur because of the uncertainty of the soil conditions as well as the unexpected risks of excavation work. In order to prevent potential excavation accidents, it is essential to understand the causes and impacts of such accidents. However, there are only a few examples of construction failures, which show the economic impact on accidents during excavation because of the sensibility of the information. This paper presents two cases of excavation accidents, which were investigated by construction insurance company. The compensation for the accidents paid by the insurance company was compared with the estimated costs calculated based on the estimation method for excavation accidents proposed by our previous study. The comparison results showed that the estimate calculated by our method was much less than the actual compensation because the estimate solely focused on the construction costs whereas the compensation included other external factors.

  • PDF

A Study of the Automation System using a Multi-DOF Manipulator for the Curtain Wall Installation in a Skyscraper (다 자유도 매니퓰레이터를 이용한 커튼월 시공 자동화에 관한 연구)

  • You, Seung-Nam;Lee, Soung-Yel;Choi, Hyeun-Seok;Lee, Kye-Young;Lee, Sang-Heon;Han, Chang-Soo
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.940-945
    • /
    • 2004
  • Recently, the trend in architectural forms has been toward taller and larger building. The building materials, therefore, are getting larger and heavier as wall. Most of the construction projects are, however, dependent on outdated equipment and human resources. Construction processes up to now face a number of problems, including dangerous work, high construction cost and heterogeneous construction quality. In various construction sites, automation in construction has been introduced to address these problems. This paper proposes a human-machine cooperative system in the construction site; the system utilizes construction of a curtain wall in tall buildings. The use of automation system at construction sites can reduce the need of human involvement. Construction time and cost can be reduced as well. The most important aspect of the use of automation system at construction sites is prevention of accidents.

  • PDF

A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.

AUTOMATED HAZARD IDENTIFICATION FRAMEWORK FOR THE PROACTIVE CONSIDERATION OF CONSTRUCTION SAFETY

  • JunHyuk Kwon;Byungil Kim;SangHyun Lee;Hyoungkwan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.60-65
    • /
    • 2013
  • Introducing the concept of construction safety in the design/engineering phase can improve the efficiency and effectiveness of safety management on construction sites. In this sense, further improvements for safety can be made in the design/engineering phase through the development of (1) an automated hazard identification process that is little dependent on user knowledge, (2) an automated construction schedule generation to accommodate varying hazard information over time, and (3) a visual representation of the results that is easy to understand. In this paper, we formulate an automated hazard identification framework for construction safety by extracting hazard information from related regulations to eliminate human interventions, and by utilizing a visualization technique in order to enhance users' understanding on hazard information. First, the hazard information is automatically extracted from textual safety and health regulations (i.e., Occupational Safety Health Administration (OSHA) Standards) by using natural language processing (NLP) techniques without users' interpretations. Next, scheduling and sequencing of the construction activities are automatically generated with regard to the 3D building model. Then, the extracted hazard information is integrated into the geometry data of construction elements in the industry foundation class (IFC) building model using a conformity-checking algorithm within the open source 3D computer graphics software. Preliminary results demonstrate that this approach is advantageous in that it can be used in the design/engineering phases of construction without the manual interpretation of safety experts, facilitating the designers' and engineers' proactive consideration for improving safety management.

  • PDF

An Adaptive and Real-Time System for the Analysis and Design of Underground Constructions

  • Gutierrez, Marte
    • Geotechnical Engineering
    • /
    • v.26 no.9
    • /
    • pp.33-47
    • /
    • 2010
  • Underground constructions continue to provide challenges to Geotechnical Engineers yet they pose the best opportunities for development and deployment of advance technologies for analysis, design and construction. The reason for this is that, by virtue of the nature of underground constructions, more data and information on ground characteristics and response become available as the construction progresses. However, due to several barriers, these data and information are rarely, if ever, utilized to modify and improve project design and construction during the construction stage. To enable the use of evolving realtime data and information, and adaptively modify and improve design and construction, the paper presents an analysis and design system, called AMADEUS, for underground projects. AMADEUS stands for Adaptive, real-time and geologic Mapping, Analysis and Design of Underground Space. AMADEUS relies on recent advances in IT (Information Technology), particularly in digital imaging, data management, visualization and computation to significantly improve analysis, design and construction of underground projects. Using IT and remote sensors, real-time data on geology and excavation response are gathered during the construction using non-intrusive techniques which do not require expensive and time-consuming monitoring. The real-time data are then used to update geological and geomechanical models of the excavation, and to determine the optimal, construction sequences and stages, and structural support. Virtual environment (VE) systems are employed to allow virtual walk-throughs inside an excavation, observe geologic conditions, perform virtual construction operations, and investigate stability of the excavation via computer simulation to steer the next stages of construction.

  • PDF