• Title/Summary/Keyword: construction design

Search Result 11,669, Processing Time 0.035 seconds

Economic Evaluation Method by Design Method ASD and LRFD of Aluminum Curtain wall (알루미늄 커튼월의 ASD/LRFD설계방법에 따른 경제성 평가 방법)

  • Moon, Sang-Deok;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.16-17
    • /
    • 2014
  • The curtain wall construction applied on high-rise building facades in Korea became generalized, but specialty of the CMr(Construction Manager) who needs to perform economical project management with specialty in the curtain wall construction is still lacking. Therefore, this study analyzed the structure design standard of the curtain wall, researched economical design alternatives. Based on the research results, if the ratio of dead load against wind load is less than 0.1256, LRFD will be more economical.

  • PDF

A Basic Study on the Application and Improvement of Delivery System for Interior Design of the Public Sector (공공부문 실내건축 설계용역 발주방식 개선을 위한 기초연구)

  • Nam, Keong-Woo;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.67-68
    • /
    • 2018
  • In the public sector, the number of interior construction projects is continuously increasing. When the interior construction is carried out, it is largely divided into design and construction stages. On the other hand, in order to place an order in the public sector, it requires institutional conditions such as business type, price criterion, award criteria, and guarantees. But in th case of interior design, it is necessary to establish a basis law to be applied for ordering. Therefore, this study analysed the necessity of improving the system related to the interior design order in the public sector and suggested ways to improve the system. In the future, we will continue to conduct research based on this research, and if institutional improvement is made through the proposed methodology, it will be possible to apply effectively not only in the public sector but also in the private sector.

  • PDF

Literature Review of Construction Guide and Design Standard for Root Barrier Design of Green Roof System (인공지반녹화용 방근 설계 및 품질 향상을 위한 가이드라인 및 기준 고찰)

  • Suh, Jung-Il;Kim, Young-Sam;Shin, Hong-chol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.239-240
    • /
    • 2019
  • The existing evaluation of root barrier resistance takes at least two years as an evaluation based on plant growth, and it is difficult to determine early performance in the process of quality control in the field. In this study, thus, the direction of the root barrier resistance evaluation system was presented by considering the construction specifications and design standards for root barrier design. As a result, it was necessary to establish a test method for reproducing simple and consistent test results for evaluating the durability of root barrier materials.

  • PDF

SUSTAINABLE DESIGN AUTOMATION AND MANAGEMENT USING XML

  • Byeong Cheol Lho;Jeong Hoon Kim;Ok Youn Yu;Julian Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.592-595
    • /
    • 2005
  • Concrete slab bridge is one of most common structures employed for local road constructions because of its simplicity in design and construction. Computer applications were developed to automate the repetitive computation for these simple structures. However, in most cases, managing the electronic documents produced by these applications has not been incorporated with design automation application yet. Resultant documents are often managed by individuals and disappear as time goes by due to lack of systemic management. This paper introduces a Web-based application developed to not only speed up the design process but also enhance the collection and manipulation of resultant electronic documents.

  • PDF

Analysis of the Causes of Defects in Fenestration Construction and Their Impacts on Construction Quality - Focused on Door Hardware - (창호철물공사 하자발생 원인과 시공품질 영향분석에 관한 연구 - 문(Door)에 사용되는 창호철물 중심으로 -)

  • Moon, Sang-Deok;Chung, Jae-Min;Ock, Jong-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.341-350
    • /
    • 2013
  • For this study, a series of interviews with engineers in the Korean construction industry was carried out through a formal workshop format to analyze the causes of the inferior quality of builders' hardware. The authors established the causes of defects in window hardware construction in relation to the three aspects of system, design, and construction as involving the following seven factors: lack of system (including low ability to create construction specifications); low social awareness of the importance of window hardware; low technical capability to create design drawings; low design costs; small manufacturing capacity; low construction cost; and short duration of construction. Among the seven causes, the biggest cause of defects in window hardware construction is the lack of a system (low ability to create construction specifications), followed by low technical capability to create design drawings. In addition, this study carried out basic research to create measures to prevent defects in window hardware construction by analyzing how such causes of defects are distributed depending on the scale of architectural firms and construction companies during actual projects.

Improvement Plan based on Awareness Investigation of Construction VE System in Domestic Construction (국내 건설공사 시공 VE 제도 인식조사에 기반한 개선방안)

  • Park, Jin-Young;Seo, Ho-Hyong;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.79-88
    • /
    • 2018
  • Construction business VE is classified into design stage VE and construction stage VE. The faster the application, the better the effect. Therefore, the design stage VE was legislated in 2000 and actively applied. However, it is urgent to activate the construction VE, which is complementary to the design VE system. In the meantime, we have made a lot of efforts to activate construction VE by suggesting the necessity of construction VE system, improvement of technology development compensation system, concrete implementation method of construction VE, but it was not effective due to lack of related laws. This study compares and analyzes construction VE system in Korea and abroad for the activation of construction VE after recognizing such domestic reality. A survey of experts in each field of the construction industry was conducted and suggestions for improvement of construction VE system suitable for domestic construction industry were suggested.

765kV Steel Tubular Tower Design On Considering Stringing Load (가선작업 하중을 고려한 765kV 강관철탑 설계)

  • Jung, Tay-Ho;Kim, Shin-Chul;Yoon, Young-Soon;Shin, Tae-Woo;Lee, An-Keun;Kim, Kwang-Youl
    • Proceedings of the KIEE Conference
    • /
    • 1998.11c
    • /
    • pp.935-937
    • /
    • 1998
  • The stringing load was added to tower design that consider the active load in 765kV transmission line construction. The nominal auxiliary members of steell tubular tower arm were altered into stress members by means of three dimensional design analysis method. 765kV transmission line construction also use self-standing tower that does not install temporary wire which support the section tower placed between drum field and engine field when stringing process.

  • PDF

A Study on the Improving Construction Processes through the Cooperative Design (협력설계를 통한 건설 프로세스 개선 방안)

  • Na Kyung-Chul;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.144-156
    • /
    • 2001
  • This study aims at improving the limitations of current construction processes. Previous solutions to improve construction processes have been focused on the improvement of local processes. This paper proposes a method to improve global effectiveness of construction processes through ascertainment of communication among the process participants. This paper provides two case studies: Deck plate installation processes and Duct installation processes. The case study illustrates a way to improve global effectiveness by incorporating downstream participants such as specialty contractors in upstream construction processes such as design and planning.

  • PDF

3D/BIM Applications to Large-scale Complex Building Projects in Japan

  • Yamazaki, Yusuke;Tabuchi, Tou;Kataoka, Makoto;Shimazaki, Dai
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.4
    • /
    • pp.311-323
    • /
    • 2014
  • This paper introduces recent applications of three-dimensional building/construction data modeling (3D) and building information modeling (BIM) to large-scale complex building construction projects in Japan. Recently, BIM has been utilized as a tool in construction process innovation through planning, design, engineering, procurement and construction to establish a front-loading-type design building system. Firstly, the background and introduction processes of 3D and BIM are described to clarify their purposes and scopes of applications. Secondly, 3D and BIM applications for typical large-scale complex building construction projects to improve planning and management efficiency in building construction are presented. Finally, future directions and further research issues with 3D and BIM applications are proposed.

Design practice for a prefabricated resort hotel in Hendurabi Island

  • Mahdoudi, Behnam;Sepasgozar, Samad;Hajivandi, Farnaz;Hojjat, Isa
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.271-280
    • /
    • 2017
  • Small islands in humid and hot climates have received less attention development due to lack of resources and difficulties for in-situ construction. This paper addresses this problem by presenting a modular system for sustainable construction of a resort hotel in accordance with the international tourism standards, in addition to, minimizing undesirable effects on nature. This has been achieved by review of literature in the scope of off-site construction and identification of the natural geographical features of Herndurabi Island. According to the information acquired, a feasibility study and design practice have been conducted to achieve a reasonable solution to equip Hendurabi Island as a sample with a self-sufficient prefabricate resort hotel. Findings indicate that the volumetric prefabricated modules would be a solution to devising a framework for design and construction in remote regions.

  • PDF