• Title/Summary/Keyword: construction damages

Search Result 521, Processing Time 0.025 seconds

A Basic Study on Reginal Prediction Model for Building Damage Costs acrroding to Hurricane (태풍에 따른 지역별 건물피해액 예측모델 개발 기초연구)

  • Kim, Boo-Young;Yang, Seongpil;Kim, Sang ho;Cho, Han Byung;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.253-254
    • /
    • 2015
  • Currently, according to the climate change, the damages due to the hurricane is more increased than before. In this respect, several countries have been conducted the studies regarding the damage prediction model of buildings to minimize the damages from natural disaster. As hurricane is the complex disaster including a strong wind and heavy rain, to predict the damage of hurricane, various factors has to be considered. However, mostly research has been conducted to consider only hurricane properties. Therefore, the objective of this study is to develop the regression model for predicting damages of buildings considering geography, socio-economy, construction environment and hurricane information. In the future, this study can be utilized to developing damage prediction model for building from hurricane in South Korea.

  • PDF

Noise Isolation Method at Construction Site (건설공사장 소음방지 대책)

  • Jung, Gab-Cheol
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.940-948
    • /
    • 2000
  • Noise and vibration generated at construction sites become serious issues because of bigger construction projects and growing use of heavy equipment. Especially in downtown construction, noise and vibration easily exceed the legal standards that can suffer the most of surrounding residents. The number of complaints by the residents who are exposed to the noise increases as their consciousness grows. However, the Korean regulations for the construction noise and vibration only present the overall limits for target areas and times zones, and this make it difficult to take effective measures. Also in rural area, disputes between construction sites and residents arise, but the dispute resolution or taking measures are difficult because clear standards concerning cause-and-effect, estimation of effective levels, calculation of damages, and future precautions and examples lack. This paper describes legal standards regarding the noise and vibration and presents judging standards for the physical damages. This paper also introduces example public complaints that happened at Daewoo construction sites to describe the problems in the existing law and further to enable smooth construction progresses by emphasizing the seriousness of public complaints.

  • PDF

A Study on the Improvement Method on Calculating the Damages Caused by the Bid Rigging in the Construction Work (건설공사 입찰담합으로 인한 손해액 산정 개선방안 연구)

  • Min, Byeong-Uk;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1053-1061
    • /
    • 2017
  • The study is concerned with providing the improvement method on making a reasonable and scientific decision on the damages accrued from the bid rigging in the construction work. According to the review on the precedent studies and decision cases on the damages caused by bid rigging, the representative problems include the insufficiency of the classification system on the damage calculation method and the omission of the necessary stage in the damage determination process. First, the improved classification system on calculating the damages caused by bid rigging is presented with the application to the bid rigging in the construction work by adding the ratio factor in addition to the damage calculation parameters such as price and cost. Second, the standard procedures organized with six stages is presented as the process required for determining the damages if the indemnification for bid rigging is claimed. The study becomes the foundation for resolving the problem with the undue burden on a party and for preventing the opportunity loss by resolving a dispute early through the improvement classification system and standard procedures presented in the study.

Damage Assessment of Steel Box-girder Bridge using Neural Networks (신경망을 이용한 강박스거더교의 손상평가)

  • Lee, In Won;Oh, Ju Won;Park, Sun Kyu;Kim, Ju Tae
    • Journal of Korean Society of Steel Construction
    • /
    • v.11 no.1 s.38
    • /
    • pp.79-88
    • /
    • 1999
  • Damages of a steel box girder bridge are detected using neural networks. Damage detection using neural networks has increasing momentum in structural engineering. It is a new effort to overcome the limitations of the conventional analytical approaches and applied to the damage detection of a steel box-girder bridge. Data sets for training neural networks are obtained from the acceleration response of the bridge under moving load. Finite element model is first defined and damages of 5, 10, 15 and 20% are assumed in the model. Not only the trained damages but untrained damages are detected in the assessment stage. The untrained damages can be detected with acceptable errors. Because the number of damaged locations are limited to a few parts, more researches are needed to put this technique into practice.

  • PDF

Studies on the Prevention of Damages on the Carbody of Aluminum Rolling Stock (알루미늄 철도차량 차체의 손상 방지를 위한 연구)

  • 서승일
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.3
    • /
    • pp.181-186
    • /
    • 2002
  • Aluminum rolling stocks have been developed for six years in Korea and commercial trainsets are being constructed by the carbuilder. Aluminum alloys are sensitive to various imperfections. In this paper, damages and failures of the aluminum carbody taking place during the process of development are investigated and accumulated data are released. Also, remedies for the failures are suggested and design changes are introduced. It is expected that all informations can contribute to construction of reliable and safe aluminum rolling stocks.

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

Disaster reduction technique based on the case study on embankment failures (댐.제방유실 사고사례를 통한 재해경감 대책기술)

  • Hong, Byug-Man;Kim, Hyun-Tae;Kang, Byung-Yoon;Yoo, Ki-Cheong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.117-128
    • /
    • 2005
  • Korea is affected by typhoon 2-3 times a year, and 50${\sim}$60 % of annual rainfall is concentrated during summer with heavy daily precipitation. Recently such natural conditions cause many of failures or damages of reservoirs and embankments. Overflow by heavy flood is the main cause that results 54.2 % of total embankment failures with damages of spillway, outlet channel and stilling basin. Since damages by overflow are triggered by scour of soils nearby the structures, use of proper backfill materials with great resistance against erosion should be considered and application of suitable construction method to protect erosion may be adopted. Most failures of levee are caused by piping along the surface of cross-structure underneath levee. Such failures may be protected by deep consideration of piping at the stage of design and good quality control during construction. Sufficient magnitude of spillway and outlet channel is the ideal way to prevent failures by the flood. For existing structures, remodeling with reinforcement to protect against flood with review of required storage of dam should be considered.

  • PDF

Case Study of Structure Damage due to Adjacent Deep Excavation (깊은 굴착에서 근접시공에 따른 구조물 피해사례 연구)

  • 김성욱;김주봉
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.113-120
    • /
    • 1999
  • Deep excavation,1 in the urban areas may cause terrible damages to the adjacent structures. Most damages are due to the settlement of ground during excavation work. This article introduces two actual examples of structure damage in subway construction projects. A through of attempts to find out the factors that are affecting to the settlement of ground was made through site investigations and analyses of measurement data. Some suggestions are given to prevent the repeat of trial and error in deep excavation projects. This kind of attempts are eccentrical to the development and improvement of information-oriented construction method.

  • PDF

Repaired concrete columns with fiber reinforced thixotropic mortar: experimental & FEA approach

  • Achillopoulou, Dimitra V.;Arvanitidou, Konstantinia C.;Karabinis, Athanasios I.
    • Computers and Concrete
    • /
    • v.15 no.1
    • /
    • pp.73-88
    • /
    • 2015
  • Following previous studies, the current paper describes the results of an experimental program concerning the repair of reinforced concrete columns by thixotropic pseudo plastic mortar, preformed to analyze and quantify the influence of initial construction damage to the behavior of the repaired element. Five columns (section scale 1:2) were designed according to the minimum requirements of reinforcement of ductility orientated codes' design with variables the percentages of initial construction damages. All were tested in axial compression with repeated cycles up to failure. For comparison reasons, another one of the same characteristics, yet healthy, was constructed and tested as a reference specimen. A numerical study (Finite Element Analysis) was conducted for further investigation of the behavior of the thixotropic mortar as repair material. The results indicate that: a) surpassing a specific amount of damage, columns even suitably repaired present lower strain capacity, b) finite element analysis present the same way of deboning of the repaired material taking into consideration the buckling of the reinforcement bars.

A STUDY OF SHOULDERING OF COMPENSATORY LIABILITY FOR DELAYED CONSTRUCTION FERIODS FOLLOWING BAD WEATHER CONDITIONS

  • Tae-Sang Jeong ; Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.705-708
    • /
    • 2005
  • In the case that construcion period is delayed because of the force majeure such as a typhoon or a flood, the owners in general should compensate the damages caused by those. But with exception the weather worsening of ordinary level is paid by contractors, while that of exceptional level by the owners. It is critical that it is difficult to distinguish objectively between ordinary and exceptional level weather worsening. Although the term of "ordinary" itself is too abstractive, we can reduce the disputes between owners and contractors by setting the appropriate and objective standard of distinction. For example in the case of rainfall it may be the standard of distinction whether the days of actual rainfall exceed those of average rainfall or not. If the days of actual rainfall don't exceed those of average rainfall contracters should pay the damages because it is distinguished with a ordinary level weather worsening. Besides the standard of distinction in another weather worsening such as severe cold/hot, strong wind etc. which have a effect on delaying the term of works could be settled as a similar model.

  • PDF