• Title/Summary/Keyword: construction damages

Search Result 521, Processing Time 0.028 seconds

A Experimental Study on the Complex Waterproofing Method of Exposure using PE Textiles of Mesh type and Highly Viscous Urethane (망사형 PE직물과 고점도 우레탄을 이용한 복층형 노출 방수공법에 관한연구)

  • Shao, Xu-Dong;Song, Je-Young;Kim, Young-Suk;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.127-130
    • /
    • 2011
  • The duplex waterproofing construction method has been investigated to improve various problems (how to fix the sheet, breaking, air/water pocket, and cracks caused by different materials) of the existing rooftop exposed waterproofing construction method. By using fiber sheet, Net PE fabric, and thixotropy urethane with high viscosity, the waterproofing construction method is to glue the ground and waterproof course by circular dot. The method is also to construct the waterproof course with high hardness by using waterproof membrane coatings in upper hybrid system. By gluing the ground and the waterproof course by circular dot, the study is expected to be useful to minimize the simultaneous breaking in the waterproof course as tensile stress is buffer in case of the ground crackling. Also, since the waterproofing construction method is good at moving and emitting vapor from the ground, it is considered to be effective to minimize any damages caused by air/water pocket and get loose of the waterproof course.

  • PDF

VALUATION OF A MULTI-STAGE RAINWATER HARVESTING TANK CONSTRUCTION USING A REAL OPTION APPROACH

  • Byungil Kim;Hyoungkwan Kim;SangHyun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.386-389
    • /
    • 2013
  • Under climate change and urbanization, rainwater harvesting (RWH) systems are emerging as an alternative source of water supply because of growing concern about water sustainability. RWH systems can satisfy the various watering needs and provide the environmental benefits of lessening the damages from flood, drought, and runoff. The economic success of a RWH system is vitally concerned with the determination of the design capacity of storage tank to be built in the system. The design capacity is determined by the factors of average annual rainfall, period of water scarcity, and water price during the whole life-cycles. Despite the high uncertainties inherent in these factors, the current engineering design of RWH system construction often assumes that storage tanks should be built all at once. This assumption implicitly ignores the managerial flexibility in responds to the future as new information comes out-the right to build storage tanks stage by stage depending on the evolution of demand. This study evaluates the value of a multistage storage tank construction using a real option approach. A case study involving a typical RWH system construction in Jeonju, the Republic of Korea is conducted. The managerial flexibility obtained from the real option perspective allows engineers to develop investment strategies to better cope with the issue of water sustainability.

  • PDF

A Study on Method for Damage Calculation Caused by Bid Rigging in Alternative Tenders for Construction Projects -Utilizing the Difference of the Design Score & Bidding Rate as Factor - (건설공사 대안입찰 담합으로 인한 손해액 산정모델 연구 - 설계점수 및 투찰률 차이 인자 활용 -)

  • Min, Byeong-Uk;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.741-749
    • /
    • 2018
  • The purpose of this study is to propose a rational and scientific damage calculation model in relation to damages caused by bid rigging in construction projects. Previous studies and precedents in relation to calculating damages from bid rigging suggest that the main issue was the lack of consideration in standards for deciding successful bids, selection of inadequate standard comparative markets, insufficiency in analyzing the appropriateness of competitive bid price influence factors, and absence of calculation model verification. In order to improve on these issues, a damage calculation method on alternative tenders for construction projects was proposed. For this calculation model, first, a standard market adequate to the successful bid selection standards was determined, second, an appropriate factor was selected by analyzing the correlation between competitive bid price influence factors, and third, a regression analysis was conducted on the selected factor. Lastly, this was demonstrated through verification of appropriateness, significance & normality of the proposed model and application of actual bid rigging cases. Through the proposed calculation model, this study seeks to serve as a base to prevent opportunity damages for parties involved in related court cases by early resolution of disputes and relief from issues of unfair damage burdens on a particular party.

Hydropower Development and Sustainability in the Mekong River Basin

  • Lee, Seung-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.37-37
    • /
    • 2012
  • The study aims to evaluate the complexity of relationships between the riparian states - China, Myanmar, Laos, Thailand, Vietnam and Cambodia - in the Mekong River Basin since the mid-1990s with special reference to the discourse on hydropower development. A special emphasis will be put on the influence of China on hydropower development. Although a variety of issues on the river basin have been discussed among the riparian states, none of them has been effectively implemented owing to the lack of China's commitment to the discussions for sustainable water management. Now, a new turning point is observed in the region with emergence of the issue on hydropower development, not only in the upper basin but also in the lower basin. The discourse on hydropower in Mekong has quickly drawn attention of the public, accelerated by the onset of construction of the Xayabury Dam in Laos since November 2010. The influence of China as the upstream country with its political, economic, and military power has increasingly grown in the region over the last few decades, and such trend recently intensifies together with an expansion of Chinese commercial interests in the region. Since the establishment of the Mekong River Commission (MRC) in 1995, the four MRC members have striven to push forward a sustainable use of water resources in the basin. But the legitimacy of the MRC system has been eroded due to the lack of participation by Myanmar and China, and in particular, the Chinese absence has made the four riparian states blind about the change of water regime due to the Chinese dams upstream. Environmental damages due to hydropower development might be possible, including a drop of fish yields, crop production, and damages to the river's ecosystems. Vietnam and Cambodia have already expressed their concerns over the dam construction towards China as well as Laos by pointing out detrimental impacts of the dams to their economies. China's move to collaborate with the other riparian states since 2010 has given a positive signal in terms of sustainable water management in the river. However, this phenomenon never confirms China's proactive contribution to the cooperative activities within the framework of the MRC system. Laos' initiative to build a new dam in the lower basin alarms those who are opposed to dam construction in the fear of its far-reaching damages to the environment. The question goes back to the year-long debate on policy priorities given to economic growth or the environment. The riparian states require wisdom based on a consensus about sustainable water use rather than hydropower development based on individual growth dreams.

  • PDF

Sustainable Road Construction Techniques with Special Emphasis on the Conservation and Restoration of Ecosystem in Japan (생태계의 보전·복원을 고려한 일본의 환경친화적 도로건설 기술 사례 연구)

  • Sung, Hyun-Chan;Moon, Da-Mi
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.4
    • /
    • pp.74-84
    • /
    • 2003
  • This study focuses on the technology to reduce destruction and damages of an ecosystem in the process of road construction. The authors investigated the ecological conservation activities and restoration technology which were applied to the construction of 2 bridges in Japan. The key results are as following : First, the most important thing in constructing eco-road was the linear design. Second, we need to adopt the environmental construction forms and materials to the design of structure. Finally, we have to use environment-friendly methods for the sake of the ecosystem at the real construction stage. Adopting those technologies has at least a few merits. First, we can achieve out goals : conservation and restoration in the local habitat. Second, we can save money instead of building a eco-bridge. There is a further advantage which makes it possible to develop environment-friendly technologies than before by drawing developers' attention.

Temperature Characteristics depending on the Changes of Surface-coated Curing Methods by using some bubble sheets during winter (동절기 버블시트 표면피복 양생방법 변화에 따른 철근의 온도특성)

  • Lee, Jea-Hyeon;Kyung, Yeong-Hyeok;Lee, Sang-Un;Lee, Joung-Gyo;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.13-14
    • /
    • 2016
  • In the modern construction industry, since numerous skyscrapers have been built, there have been sought for developing various kinds of methods for shortening a construction period. Therefore, many kinds of studies on some kinds of cold-weather concrete have been conducted actively for the purpose of a year-round construction. Accordingly, this research team once developed a double-layered bubble sheet as a surface-coated curing material for winter. And there have been raised some worries that some initial damages to frozen concrete caused by low temperature of reinforcing bars which are exposed out of the wall areas of a wall-type apartment during winter. Therefore, in this study, it is intended to find out clearly whether it is possible for concrete to be damaged initially or not by analyzing the temperature characteristics of the exposed reinforcing bars of the wall areas under the temperature conditions during winter.

  • PDF

Types and Characteristics of Slope Failure induced by the 15th Typhoon, Rusa (태풍 루사 영향에 의한 사면 붕괴 유형 및 특징)

  • Bae, Gyu-Jin;Koo, Ho-Bon;Baek, Yong;Choi, Young-Tae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.3.1-14
    • /
    • 2002
  • Many human lives and properties have been damaged by the annually occurring natural disasters. Among them, a typhoon accompanying a gale and a localized torrential downpour induce a first order damages. In this study, states, scales and other characteristics of slope failure induced by the typhoon Rusa, which damaged the whole Korea peninsular on August 30th for 3 days, were analyzed. In addition, permanent measures for slope failure are conducted to prepare natural disasters. Since the key factor on the slope failure is considered to be a rainfall. The characteristics of domestic rainfall and typhoon are investigated, and then failure forms and some characteristics of slope failure are analyzed. By comparing with the data of existing slopes, the hazard of slope failure is examined. There fundamental results could be applied to the future measures of slope failure.

  • PDF

Evaluation for High Strength Concrete using Pullout Test (인발법을 이용한 고강도 콘크리트 구조물의 강도평가방법)

  • Ko, Hune-Bum
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.85-91
    • /
    • 2008
  • Out of all the nondestructive test (NDT) methods, the pullout test is one of the most reliable techniques for estimating the strength of concrete under construction. However the pullout test inevitably produces significant surface damage because of the inherent test mechanism and costs too much for using measurement devices. In the view of construction engineers and inspectors, the main purpose of NDT methods for concrete is to verify whether the concrete strength of structure members exceeds the target strength or not. In this paper, a new pullout test method, which involves a pre-installed breaking bolt, with pre-determined breaking torques corresponding to the target strength of concrete, is introduced with related test data. The three types of test, the rebound hammer test, the pullout test, and the new pullout test with breaking bolt, were carried out on wall specimen with three types of concrete strengths. Our results show that concrete strength as evaluated by the pullout test with breaking bolt was similar with cylinder test results. Therefore it can be said that the new pullout test with breaking bolt is a useful method for checking the concrete strength without any surface damages in construction site.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

INFRASTRUCTURE RISK MANAGEMENT IN PREPAREDNESS OF EXTREME EVENTS

  • Eun Ho Oh;Abhijeet Deshmukh;Makarand Hastak
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.83-90
    • /
    • 2009
  • Natural disasters, such as the recent floods in the Midwest, Hurricane Ike in the Gulf coast region (U.S.), and the earthquake in Sichuan (China), cause severe damage to the infrastructure as well as the associated industries and communities that rely on the infrastructure. The estimated damages due to Hurricane Ike in 2008 were a staggering $27 billion, the third worst in U.S. history. In addition, the worst earthquake in three decades in Sichuan resulted in about 90,000 people dead or missing and $20 billion of the estimated loss. A common observation in the analyses of these natural disaster events is the inadequacy of critical infrastructure to withstand the forces of natural calamities and the lack of mitigation strategies when they occur on the part of emergency-related organizations, industries, and communities. If the emergency-related agencies could identify and fortify the vulnerable critical infrastructure in the preparedness stage, the damage and impacts can be significantly reduced. Therefore, it is important to develop a decision support system (DSS) for identifying region-specific mitigation strategies based on the inter-relationships between the infrastructure and associated industries and communities in the affected region. To establish effective mitigation strategies, relevant data were collected from the affected areas with respect to the technical, social, and economic impact levels. The data analysis facilitated identifying the major factors, such as vulnerability, criticality, and severity, for developing a DSS. Customized mitigation strategies that will help agencies prepare, respond, and recover according to the disaster response were suggested.

  • PDF