• Title/Summary/Keyword: construction CALS system

Search Result 73, Processing Time 0.025 seconds

A Study about Electronic Document Unification for Construction Job-site Report (건설현장보고 전자문서 일원화에 관한 연구)

  • Jeong, Seong-Yun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.925-928
    • /
    • 2007
  • As the field report data does not normalize, ordering organization requires different form every time and field reporters make out form as random, data and report to the ordering organization by different medium such as FAX, e-mail, paper document. Therefore, Field reporters must set and make out same information in required pattern. And ordering organization is being responsible for side works of totalizing and processing the reported data. This research suggests the electronic document unification about monthly construction progress report and construction present condition report system. In addition, it suggests electronically processing function that can handle field report business to unifying electronic documents. As using the result of this research, it will improve the work efficiency and simplify in report business.

  • PDF

A Strategy of Information Management System for Construction Company (건설산업의 효율적 정보관리체계 구축전략)

  • Lee Tai Sik;Kim Yong Chan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.458-461
    • /
    • 2001
  • The whole of industry sectors are getting achieved BPR(Business process Reencountering) which innovate the inefficient product organization through examined the value chain. Besides, they try to integrate ERP, CRM, and SCM which is based on value chain. Construction Industry, however, not only is not regularized it but is not inadequacy about information mind. Nowadays Korean government lead the construction CALS, only some large company Innovate and restructure the organization and product structure. It Is necessary to efficient manage the project information and historical data and develop CIC/PMIS to transfer from the function based information-flow to the project based information-flow. The purpose of the Information management system's success In Korea, therefore, this paper analyzes the information-intensive problems and proves the device to achieve the Information Management System through the Standardization, Synchronization, Centralization for Construction Company.

  • PDF

THE MODULES ADVENCEMENT TO DEVELOP PMIS INTO FMS IN THE CASES OF MEDICAL FACILITIES

  • Jong-Soon Park;Byeong-Gi Yoo;Kyung-Mi Hyun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1328-1333
    • /
    • 2009
  • On the construction area, Information Technology (IT) has been a considerably significant part over the all phases; plan, design, procurement, construction and post-construction. For example, CALS, CITIC, PMIS, FMS, BIM and etc, designed and applied for managing construction industry are already valuable to improve on the Construction Management (CM). To develop these management methods, lots of mixed-systems are studied and progressed so far. In this paper, more useful and efficient system modules are proposed through investigating PMIS cases implemented, especially medical projects, to improve into FMS on the post-construction. Because most PMIS on the construction phase is used not to continue as FMS, considerable cost and time is consumed to rebuild the system, even both systems have common modules. As these wastes are faced to design systems, the important modules on PMIS are derived and analyzed to apply to FMS to save time and cost on CM.

  • PDF

A Study of Process Modeling Method for Construction Business Process Reengineering (건설분야 BPR 수행을 위한 프로세스 모형화 기법 연구)

  • Kwak, Joong-Min;Park, Seo-Young;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.80-88
    • /
    • 2010
  • The construction industry concentrates their efforts on construction information technology (IT) including construction CALS. However, the actual circumstances for construction IT focuses on building hardware and it neglects importance of business process reengineering (BPR) for construction tasks. A systematic process modeling method and a computerized model by process concept need for building construction BPR. This study develops a generalized BPR procedure for construction projects, and then suggests a new process modeling method for construction BPR that consists of object-related process model (ORPM). Finally, this study develops a web-based ORPM Builder (ORPMB) based on the ORPM methodology, and the applicability of the developed system is verified by a case study with practical construction processes.

A Study on the development of Construction site management system to build Web-based BIM (웹기반 BIM 구축을 위한 건축현장 관리시스템 개발에 관한 연구)

  • Sung, Kyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.1081-1083
    • /
    • 2009
  • Several construction management systems, such as CIC, CALS, PMIS etc., are only focused on visualizing or collecting data without linking between them. So, it is required to develop a new concept construction management system able to control data throughout the construction process. The purpose of this study is to develop prototype of web-based BPMS, which implements whole information flow for each construction phase effectively by storing common data in general building constructions.

  • PDF

Analysis on the Determinants of Land Compensation Cost: The Use of the Construction CALS Data (토지 보상비 결정 요인 분석 - 건설CALS 데이터 중심으로)

  • Lee, Sang-Gyu;Seo, Myoung-Bae;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.461-470
    • /
    • 2020
  • This study analyzed the determinants of land compensation costs using the CALS (Continuous Acquisition & Life-Cycle Support) system to generate data for the construction (planning, design, building, management) process. For analysis, variables used in the related research on land costs were used, which included eight variables (Land Area, Individual Public Land Price, Appraisal & Assessment, Land Category, Use District 1, Terrain Elevation, Terrain Shape, and Road). Also, the variables were analyzed using the machine learning-based Xgboost algorithm. Individual Public Land Price was identified as the most important variable in determining land cost. We used a linear multiple regression analysis to verify the determinants of land compensation. For this verification, the dependent variable included was the Individual Public Land Price, and the independent variables were the numeric variable (Land Area) and factor variables (Land Category, Use District 1, Terrain Elevation, Terrain Shape, Road). This study found that the significant variables were Land Category, Use District 1, and Road.

A Study on Advanced Analysis of Construction Project Performance Evaluation (건설사업 수행성과평가에 대한 분석 고도화 연구)

  • Kim, Kyong hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

Establishment Construction Enterprise Resource Planning(ERP) & Construction Information Sttategy (건설정보화 전략과 ERP구축)

  • Lee Min-Nam;Oh Dong-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.164-170
    • /
    • 2003
  • This paper is to evaluate the informational direction, current situations and ERP establishment concerning constructing industry, to present the right directions, implemented cases for implementing constructional ERP, also to suggest the effect, influence, problems and shootings in constructional ERP arena. The constructing industries in korea are facing great turning point because of the huge corruptions currently happened and forcing to open the market in 1997. Attempting to establish Computer Integrated construction system (ERP) by breaking down constructing cost, improving quality, operating rapid and effective construction to enhance productivity, it is hard to achieve the goal with only inter-contractor's establishment. Constructing industries are integrated ones, consisted of many organizations for instance ordering agencies, contractors, subcontractors, material vendors, etc. and use various information formats such as texts, graphics, drawings. I dare suggest that implementation of constructional CALS including EDI/EC, GIS is tile only solution to control the information systematically generated in whole stages from planing, designing, constructing through maintenance, and to supply or switch the information.

  • PDF

The Study of Project Management Information System Establishment for Construction (건설사업관리 정보시스템(PMIS)구축에 관한 연구)

  • Yoon Jae-Ho;Moon Young-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.132-138
    • /
    • 2002
  • Recently, utilization of PMIS(Project Management Information System) is in high demand as it is desired to advance the construction market through cost reduction and quality improvement within the given schedule. However, PMIS developed by individual projects are mostly evolving around construction progress status due to the temporary nature of development period and use of the system by project executers is no more than perfunctory that results in limiting the effective communication between the project owner, project manager and constructor. Therefore, the purpose of this paper is to review the PMIS developed so far, and present the direction for an effective PMIS.

Development of CITIS Model and Analysis of Its functionality as a Collaborative Virtual Factory for Construction Projects (건설프로젝트의 협업적 가상기업으로서의 CITIS 모델개발 및 성능분석에 관한 연구)

  • Han Seung Heun;Chin Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.87-98
    • /
    • 2002
  • Korea government is making an effort to improve the efficiency in construction industry by introducing CITIS (Contractor integrated Technical Information Service). In order to provide a base for the application of CITIS into the construction industry, this research provides a concept of virtual factory which should be incorporated into CITIS system for the successful collaborative work in the virtual space. It then implements a prototype system through process and data modeling to apply into the road construction projects. The prototype system is tested to verify its efficiency. Finally, lesson learned from these works is provided to advance the current CITIS toward a collaborative virtual factory.