• 제목/요약/키워드: competitive electricity market

검색결과 198건 처리시간 0.022초

전력시장 공정경쟁을 위한 소비자정보 통합 모델 설계 및 유통에 관한 연구 (A Study on the Integrated Model Design and Circulation of the Customer Information for Electricity Market Competition)

  • 고종민;박상후;노재구;김영일;최승환
    • 전기학회논문지
    • /
    • 제60권9호
    • /
    • pp.1668-1673
    • /
    • 2011
  • Recent power industries are to be progressed as moving into horizontal markets and expanding of competitive systems through promoting SmartGrid. In these environments, the information on power consumers leads to establish a part of power markets through active and real-time participations instead of participating it as a passive manner presented by a vertical integration. Also, such information should be established as a way that effectively reflects changes and market behaviors occurred in power market participants. Therefore, in this study, a method that develops consumer information models, performs integrated managements, implements registration and distribution, and forms integrated management centers is presented to commonly use the consumer information according to the change in the environment of power industries.

양수발전기의 전략적 시장참여에 대한 해석 모형 연구 (A Study on the Strategic Competition Model of Pumped Storage Plant)

  • 이광호
    • 전기학회논문지
    • /
    • 제56권10호
    • /
    • pp.1738-1743
    • /
    • 2007
  • This paper addresses the bidding strategies of a pumped-storage hydro plant in an electricity market. Competitive bidding of pumping and generating of a pumped-storage plant is formulated in a game theoretic problem in accordance with the three different ownership of scheduling; Market Operator(MO), generating company(Genco), and combined type of MO and Genco. Optimal conditions for Nash Equilibrium are derived in the form of market prices during the scheduling periods. Simulation results show the different ownership models produce different schedules of pumping and generating, which correspond to the objective of the scheduling owner of a pumped-storage hydro plant.

혼잡에 의한 시장지배력 삭감방안으로서의 Must-Run 계약용량 산정방안 (The Calculation Method of Must-Run Contract Capacity as Market Power Reduction Considered TR Congestion.)

  • 이동진;신영균;한석만;정구형;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.728-730
    • /
    • 2004
  • Transmission congestion is one of the Key factors to local market power in competitive electricity markets. Other players' strategy is also considered. This paper presents an alternative methodology in market power under transmission congestion and other players' strategy. The proposed methodology was demonstrated with the Optimal Power Flow(OPF). Case study is fulfilled by GAMS simulation.

  • PDF

최적조류계산을 이용한 한계손실계수의 전력시장 적용 (Marginal Loss Factor using Optimal Power Flow in Power Market)

  • 고용준;신동준;김진오;이효상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.509-511
    • /
    • 2001
  • In the competitive electricity market, various pricing methods are developed and practiced in many countries. Among these pricing methods, marginal loss factor(MLF) can be applied to reflect the marginal cost of network losses. For the calculation of MLF, power flow method has been used. However, it shows some shortcomings such as necessity of regional reference node, and absence of an ability to consider network constraints. The former defect might affect adversely to the equity of market participants and the latter might generate an inappropriate price signal. To overcome these defects, the utilization of optimal power flow(OPF) is suggested in this paper. 30-bus system is used for the case study to compare the MLF by the power flow and the OPF method for 24-hour dispatching and pricing.

  • PDF

Multi-Area Unit Commitment with Bilateral Contract Approach in Deregulated Electricity Market

  • Selvi, S.Chitra;Devi, R.P.Kumudini;Rajan, C.Christober Asir
    • Journal of Electrical Engineering and Technology
    • /
    • 제4권3호
    • /
    • pp.346-352
    • /
    • 2009
  • The eventual goal of this paper is to help the generating companies and load-serving entities to choose appropriate relative levels of interconnected system versus bilateral trades while considering risk, and economic performance. In competitive power markets, electricity prices are determined by balance between demand and supply in electric power exchanges or bilateral contracts. The problem formulation is bilateral contract incorporated into Multi-area unit commitment with import/export and tie-line constraints. This proposed method considers maximizing own profit or minimize the operating cost among the generating companies in multi-area system. The feasibility of the proposed algorithm has been demonstrated using IEEE system with four areas and experimental results shows that proposed method is reliable, fast and computationally efficient

한전 765kV 송전선로 확충계획의 확률론적 신뢰도 평가 (Probabilistic Reliability Evaluation for 765kV Transmission Lines of KEPCO Grid Expansion Planning)

  • 트란트룽틴;권중지;최재석;전동훈;한경남
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.237-239
    • /
    • 2005
  • The importance and necessity conducting studies on grid reliability evaluation have been increasingly important in recent years due to the number of black-out events occurring through in the world. Quantity evaluation of transmission system reliability is very important in a competitive electricity environment. The reason is that the successful operation of electric power under a deregulated electricity market depends on transmission system reliability management. Also in Korea it takes places. This paper presents the probabilistic reliability evaluation for 765KV transmission lines of KEPCO grid expansion planning. The Transmission Reliability Evaluation for large-Scale Systems (TRElSS) Version 6.2, a software package developed by Electric Power Research Institute (EPRI) is utilized in determining the improved probabilistic reliability indices of (KEPCO) system.

  • PDF

TRELSS를 이용한 우리나라의 확률론적 신뢰도 평가에 관한 연구 - V (Probabilistic Reliability Evaluation of KEPCO System using TRELSS - V)

  • 전동훈;김태균;차승태;추진부;트란트룽틴;이상식;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.11-14
    • /
    • 2004
  • In recent, the importance and necessity of some studies on reliability evaluation of grid comes from the recent black-out accidents occurred in the world. The quantity evaluation of transmission system reliability is very important under competitive electricity environment. The reason is that the successful operation of electric power under the deregulated electricity market depends on transmission system reliability management. This paper introduces features and operation modes of the Transmission Reliability Evaluation for Large-Scale Systems(TRELSS) Version 6.2, a program made in EPRI, for assessing reliability indices of composite power system. The package accesses not only bulk but also buses indices for reliability evaluation of composite powers system. The characteristics of the TRELSS program are illustrated by the case studies using the KEPCO system

  • PDF

비용기반 전력시장에서의 용량요금 산정방안에 관한 연구 (A Study on the Capacity Payment in Cost Based Pool)

  • 한석만;김발호
    • 전기학회논문지
    • /
    • 제57권9호
    • /
    • pp.1531-1535
    • /
    • 2008
  • In the past vertically integrated power system, the power utility forecasted power demand and invested new power plants to keep a system adequacy. However, in the competitive electricity markets, a principle part of the capacity investment is market participants who decided the investment to maximize their profit. Especially, one of the main factors in their long-term decision making is the retrieval of fixed costs (construction costs). This paper presents the capacity payment in electricity power markets. The capacity payment (CP) in Cost Based Pool (CBP) is needed to recover fixed costs. However, CP in CBP was applied not only recovering fixed costs but also ensuring supply reliability. In order to operate harmonious power markets, pool needs reasonable CP mechanism. This paper analysis CP using capacity proportion and Reliability Pricing Model (RPM).

미국 전력시장에서의 전력품질의 차별화 전략 검토 (Review for Differentiated Strategy of Power Quality in the U.S.A)

  • 최상봉;김대경;정성환;김호용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.207-209
    • /
    • 2001
  • Intensive competition in the electricity market and demand for higher quality service force the utilities to change their strategies in setting price and quality combination. As cost-up by homogeneously enhancing the electricity service quality may reduce their competitiveness, differential service is to be taken into consideration. Priority Service, which provides customers with a selection of service options at a range of prices and reliability for all or portions of their loads, has drawn attention from utilities in an increasingly competitive environment. Priority Service is to enlarge service options for customers who have diverse needs for supply reliability. This paper in the light of this point reviews differentiated strategy of power quality in the U.S.A.

  • PDF

전력시장 과점구조에서의 발전기 기동정지 게임 해석 (Analysis on Unit-Commitment Game in Oligopoly Structure of the Electricity Market)

  • 이광호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권11호
    • /
    • pp.668-674
    • /
    • 2003
  • The electric marketplace is in the midst of major changes designed to promote competition. No longer vertically integrated with guaranteed customers and suppliers, electric generators and distributors will have to compete to sell and buy electricity. Unit commitment (UC) in such a competitive environment is not the same as the traditional one anymore. The objective of UC is not to minimize production cost as before but to find the solution that produces a maximum profit for a generation firm. This paper presents a hi-level formulation that decomposes the UC game into a generation-decision game (first level game) and a state(on/off)-decision game (second level game). Derivation that the first-level game has a pure Cournot Nash equilibrium(NE) helps to solve the second-level game. In case of having a mixed NE in the second-level game, this paper chooses a pure strategy having maximum probability in the mixed strategy in order to obviate the probabilistic on/off state which may be infeasible. Simulation results shows that proposed method gives the adequate UC solutions corresponding to a NE.