• Title/Summary/Keyword: combined load

Search Result 1,124, Processing Time 0.036 seconds

Analysis of Stability and Behavior of Slope with Solar Power Facilities Considering Seepage of Rainfall (태양광 발전시설이 설치된 사면의 강우시 침투를 고려한 안정성 및 거동 분석)

  • Yu, Jeong-Yeon;Lee, Dong-Gun;Song, Ki-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.7
    • /
    • pp.57-67
    • /
    • 2023
  • Slope failures during rainfall have been observed in mountainous areas of South Korea as a result of the presence of solar power facilities. The seepage behavior and pore pressure distribution differ from typical slopes due to the presence of impermeable solar panels, and the load imposed by the solar power structures also affects the slope behavior. This study aims to develop a method for evaluating the stability of slopes with solar power facilities and to analyze vulnerable points by considering the maximum slope displacement. To assess the slope stability and predict behavior while considering rainfall seepage, a combined seepage analysis and finite difference method numerical analysis were employed. For the selected site, various variables were assumed, including parameters related to the Soil Water Characteristic Curve, strength parameters that satisfy the Mohr-Coulomb failure criterion, soil properties, and topographic factors such as slope angle and bedrock depth. The factors with the most significant influence on the factor of safety (FOS) were identified. The presence of solar power facilities was found to affect the seepage distribution and FOS, resulting in a decreasing trend due to rainfall seepage. The maximum displacement points were concentrated near the upper (crest) and lower (toe) sections of the slope.

Water-blocking Asphyxia of N95 Medical Respirator During Hot Environment Work Tasks With Whole-body Enclosed Anti-bioaerosol Suit

  • Jintuo Zhu;Qijun Jiang;Yuxuan Ye;Xinjian He;Jiang Shao;Xinyu Li;Xijie Zhao; Huan Xu;Qi Hu
    • Safety and Health at Work
    • /
    • v.14 no.4
    • /
    • pp.457-466
    • /
    • 2023
  • Background: During hot environment work tasks with whole-body enclosed anti-bioaerosol suit, the combined effect of heavy sweating and exhaled hot humid air may cause the N95 medical respirator to saturate with water/sweat (i.e., water-blocking). Methods: 32 young male subjects with different body mass indexes (BMI) in whole-body protection (N95 medical respirator + one-piece protective suit + head covering + protective face screen + gloves + shoe covers) were asked to simulate waste collecting from each isolated room in a seven-story building at 27-28℃, and the weight, inhalation resistance (Rf), and aerosol penetration of the respirator before worn and after water-blocking were analyzed. Results: All subjects reported water-blocking asphyxia of the N95 respirators within 36-67 min of the task. When water-blocking occurred, the Rf and 10-200 nm total aerosol penetration (Pt) of the respirators reached up to 1270-1810 Pa and 17.3-23.3%, respectively, which were 10 and 8 times of that before wearing. The most penetration particle size of the respirators increased from 49-65 nm before worn to 115-154 nm under water-blocking condition, and the corresponding maximum size-dependent aerosol penetration increased from 2.5-3.5% to 20-27%. With the increase of BMI, the water-blocking occurrence time firstly increased then reduced, while the Rf, Pt, and absorbed water all increased significantly. Conclusions: This study reveals respirator water-blocking and its serious negative impacts on respiratory protection. When performing moderate-to-high-load tasks with whole-body protection in a hot environment, it is recommended that respirator be replaced with a new one at least every hour to avoid water-blocking asphyxia.

Sewage Treatment Using a Double Media Reed Constructed Wetland (복층여재 갈대 인공습지에 의한 생활하수 처리)

  • Seo, Jeoung-Yoon
    • Journal of Wetlands Research
    • /
    • v.16 no.4
    • /
    • pp.379-388
    • /
    • 2014
  • A sewage was treated using a serially combined vertical(VFCW) and horizontal flow double media (sand and zeolite for VFCW and sand and waste oyster-shell for HFCW) reed constructed wetland(HFCW) with intermittent feeding (see Fig. 1). The sewage was fed into the reed constructed wetland for 10 minutes every 6 hours at the hydraulic load of $314L/m^2{\cdot}day$. The summarized results were as follows: pH values in the effluent depended very heavily on oyster-shell height filled in the HFCW. They were maintained at less than pH 6.24 when the height of the oyster-shell layer was 200 mm. Influent DO(oxygen demand) values(average 0.19 mg/L) were increased in the VFCW(average 7.65 mg/L) and decreased again in the HFCW(average 6.49 mg/L). They were higher in the winter than in the summer. The OTR(oxygen transfer rate) was $57.15g\;O_2/m^2{\cdot}day$ in the VFCW and $5.65g\;O_2/m^2{\cdot}day$ in the HFCW. The removal efficiency of $NH_4{^+}$-N was 80.17%(6.01 $NH_4{^+}$-N mg/L in the effluent). It was lower than that in the case where only zeolite was filled in the reed constructed wetland. But it was expected that treated sewage effluent using a double media reed constructed wetland with 300 mm zeolite layer could stably meet the Korean treated sewage effluent standard(20 mg T-N/L). Average removal efficiencies were SS 88.09%, BOD 88.12%, $COD_{Cr}$ 83.11%, $COD_{Mn}$ 85.58%, T-N 57.21%, $NH_4{^+}$-N 80.17%, T-P 86.73%. Nearly, The concentration of $NO_3{^-}$-N in the effluent of the VFCW was decreased in that of the HFCW. More than half of T-N in the effluent was $NO_3{^-}$-N(7.92 mg/L) but the concentration of $NO_2{^-}$-N in the effluent was average 0.90 mg/L. The removal efficiencies of T-P were 93.24%, 86.30% and 55.44% at the height of the oyster-shell-filled constructed wetland of 800 mm, 500 mm and 200 mm, respectively and therefore, they were proportional to oyster-shell height filled in the HFCW.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

Optimum Configuration, Filter Media Depth and Wastewater Load of Small-scale Constructed Wetlands for Treating the Hydroponic Waste Solution in Greenhouses (시설하우스 폐양액 처리를 위한 소형 인공습지의 최적 조합방법, 여재깊이 및 폐양액 부하량)

  • Park, Woo-Young;Seo, Dong-Cheol;Lim, Jong-Sir;Park, Seong-Kyu;Cho, Ju-Sik;Heo, Jong-Soo;Yoon, Hae-Suk
    • Korean Journal of Environmental Agriculture
    • /
    • v.27 no.3
    • /
    • pp.217-224
    • /
    • 2008
  • To obtain optimum configuration, depth and load of constructed wetlands(CWs) for treating of hydroponic waste solution(HWS) which was produced in greenhouses, the study was conducted with 4 kinds of combined systems such as Vertical flow(VF)-Horizontal flow(HF), VF-VF, HF-VF and HF-HF CWs. In four configurations of CWs, the treatment efficiency of pollutants from HWS under depth of HF and VF beds, HWS loading and HWSs were investigated. Removal rate of pollutants under different depth of VF and HF in 2-stage hybrid CWs was in the order of 50 cm < 70 cm regardless of CWs configuration. Removal rate of pollutants under HWS loading in 2-stage hybrid CWs was in the order of $150L\;m^{-2}\;day^{-1}{\fallingdotseq}300L\;m^{-2}\;day^{-1}\;>\;450L\;m^{-2}\;day^{-1}$. The optimum depth and HWS loading were 70 cm and $300L\;m^{-2}\;day^{-1}$ in four configurations of CWs, respectively. Using this optimum condition, for various HWSs (cucumber, paprika and strawberry HWS), removal rate of pollutants in HF-HF CWs was higher than that in HF-VF CWs. Optimum configuration of 2-stage hybrid CWs for treating hydroponic waste solution in greenhouses was found out to be HF-HF CWs. Therefore, under the optimum conditions, removal rate of BOD, COD, SS, T-N and T-P in HF-HF CWs were 84, 81, 84, 51 and 93%, respectively.

Changes in the Stability Properties of Methylcellulose Emulsions as Affected by Competitive Adsorption Between Methylcellulose and Tween 20 (메칠셀룰로오스/Tween 20 경쟁 흡착이 메칠셀룰로오스 유화액의 안정도 특성에 미치는 영향)

  • Hong, Soon-Taek
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.37 no.10
    • /
    • pp.1278-1286
    • /
    • 2008
  • The effect of Tween 20 addition on changes in the stability of methylcellulose (MC) emulsions (1 wt% MC, 10 wt% n-tetradecane, 20 mM bis-tris buffer, pH 7) was investigated by creaming stability and orthokinetic stability measurements. In the case of MC emulsions containing varying amounts of oil (1$\sim$30 wt%) and no Tween 20 added, creaming stability, judged by mean migration velocity of fat globules ($V_m$), was found to depend on droplet size: the larger the droplet size, the worse the stability [$V_m$: 0.326 $\mu$m $min^{-1}$ ($d_{32}$: 0.32 $\mu$m) ${\rightarrow}V_m$: 0.551 $\mu$m $min^{-1}$ ($d_{32}$: 0.53 $\mu$m)]. With Tween 20, creaming stability was found to be worse than the one without Tween 20, except for MC emulsion containing 0.2 wt% Tween 20. In addition, cream stability was the lowest with the lowest concentration of Tween 20 and a tendency to recover with increasing Tween 20 concentration [$V_m$: 0.598 $\mu$m $min^{-1}$ (0.01 wt%)${\rightarrow}V_m$: 0.389 $\mu$m $min^{-1}$ (0.2 wt%)] was found. From viscosity measurement for aqueous bulk phase of MC emulsions, such a change in the creaming stability was found to coincide well with the results of viscosity measurement. Therefore, it was reasonable to say that creaming stability of MC emulsions containing Tween 20 depended on MC concentration in aqueous bulk phase, which was in turn varied by competitive adsorption between MC and Tween 20 at the oil droplet surface. In case of orthokinetic stability, judged by destabilization time ($t_d$), it was found that the addition of Tween 20 resulted in lowered stability with more pronounce tendency at higher concentrations [$t_d$: 160 min (0.03 wt%)${\rightarrow}t_d$: 100 min (0.2 wt%)]. Moreover, combined with previous results, the orthokinetic stability of MC emulsions containing Tween 20 was found to be exponentially proportional to MC load. In conclusion, competitive adsorption between MC and Tween 20 may affect the stability properties of MC emulsion to varying extents, depending on the concentration of Tween 20.

Design and Full Size Flexural Test of Spliced I-type Prestressed Concrete Bridge Girders Having Holes in the Web (분절형 복부 중공 프리스트레스트 콘크리트 교량 거더의 설계 및 실물크기 휨 실험 분석)

  • Han, Man Yop;Choi, Sokhwan;Jeon, Yong-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3A
    • /
    • pp.235-249
    • /
    • 2011
  • A new form of I-type PSC bridge girder, which has hole in the web, is proposed in this paper. Three different concepts were combined and implemented in the design. First of all, a girder was precast at a manufacturing plant as divided pieces and assembled at the construction site using post-tensioning method, and the construction period at the site will be reduced dramatically. In this way, the quality of concrete can be assured at the manufacturing factory and concrete curing can be well controlled, and the spliced girder segments can be moved to the construction site without a transportation problem. Secondly, a numerous number of holes was made in the web of the girder. This reduces the self-weight of the girder. But more important thing related to the holes is that about half of the total anchorages can be moved from the girder ends into individual holes. The magnitude of negative moment developed at girder ends will be reduced. Also, since the longitudinal compressive stresses are reduced at ends, thick end diaphragm is not necessary. Thirdly, Prestressing force was introduced into the member through multiple stages. This concept of multi-stage prestressing method overcomes the prestressing force limit restrained by the allowable stresses at each loading stage, and maximizes the magnitude of applicable prestressing force. It makes the girder longer and shallower. Two 50 meter long full scale girders were fabricated and tested. One of them was non-spliced, or monolithic girder, made as one piece from the beginning, and the other one was assembled using post-tensioning method from five pieces of segments. It was found from the result that monolithic and spliced girder show similar load-deflection relationships and crack patterns. Girders satisfied specific girder design specification in flexural strength, deflection, and live load deflection control limit. Both spliced and monolithic holed web post-tensioned girders can be used to achieve span lengths of more than 50m with the girder height of 2 m.

Seismic Design of Columns in Inverted V-braced Steel Frames Considering Brace Buckling (가새좌굴을 고려한 역 V형 가새골조의 기둥부재 내진설계법)

  • Cho, Chun-Hee;Kim, Jung-Jae;Lee, Cheol-Ho
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.1
    • /
    • pp.1-12
    • /
    • 2010
  • According to the capacity design concept which forms the basis of the current steel seismic codes, the braces in concentrically braced frames (CBFs) should dissipate seismic energy through cyclic tension yielding and cyclic compression buckling while the beams and the columns should remain elastic. Brace buckling in inverted V-braced frames induces unbalanced vertical forces which, in turn, impose the additional beam moments and column axial forces. However, due to difficulty in predicting the location of buckling stories, the most conservative approach implied in the design code is to estimate the column axial forces by adding all the unbalanced vertical forces in the upper stories. One alternative approach, less conservative and recommended by the current code, is to estimate the column axial forces based on the amplified seismic load expected at the mechanism-level response. Both are either too conservative or lacking technical foundation. In this paper, three combination rules for a rational estimation of the column axial forces were proposed. The idea central to the three methods is to detect the stories of high buckling potential based on pushover analysis and dynamic behavior. The unbalanced vertical forces in the stories detected as high buckling potential are summed in a linear manner while those in other stories are combined by following the SRSS(square root of sum of squares) rule. The accuracy and design advantage of the three methods were validated by comparing extensive inelastic dynamic analysis results. The mode-shape based method(MSBM), which is both simple and accurate, is recommended as the method of choice for practicing engineers among the three.

A Experimental Study on Nitrous Oxide Formation in Direct Injection Diesel Engine (직접분사식 디젤엔진에서 아산화질소의 생성에 관한 실험적 연구)

  • Yoo, Dong-Hoon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.2
    • /
    • pp.188-193
    • /
    • 2015
  • It has been generally recognized that $N_2O$(Nitrous Oxide) emission from marine diesel engines has a close correlation with $SO_2$(Sulfur Dioxide) emission, and diversity of fuel elements using ships affects characteristics of the $N_2O$ emission. According to recent reports, in case of existence of an enough large NO(Nitric Oxide) generated as fuel combustion, effect of the $SO_2$ emission in exhaust gas on the $N_2O$ formation is more vast than effect of the NO. Therefore, $N_2O$ formation due to the $SO_2$ element operates on a important factor in EGR(Exhaust Gas Recirculation) systems for NOx reduction. An aim of this experimental study is to investigate that intake gas of the diesel engine with increasing of $SO_2$ flow rate affects $N_2O$ emission in exhaust gas. A test engine using this experiment was a 4-stroke direct injection diesel engine with maximum output of 12 kW at 2600rpm, and operating condition was set up at a 75% load. A standard $SO_2$ gas with 0.499%($m^3/m^3$) was used for changing of $SO_2$ concentration in intake gas. In conclusion, the diesel fuel included out sulfur elements did mot emit the $SO_2$ emission, and the $SO_2$ emission in exhaust gas according as increment of the $SO_2$ standard gas had almost the same ratio compared with $SO_2$ rate in mixture inlet gas. Furthermore, the $N_2O$ element in exhaust gas was formed as $SO_2$ mixture in intake gas because increment of $SO_2$ flow rate in intake gas increased $N_2O$ emission. Hence, diesel fuels included sulfur compounds were combined into $SO_2$ in combustion, and $N_2O$ in exhaust gas should be generated to react with NO and $SO_2$ which exist in a combustion chamber.

A Hybrid Forecasting Framework based on Case-based Reasoning and Artificial Neural Network (사례기반 추론기법과 인공신경망을 이용한 서비스 수요예측 프레임워크)

  • Hwang, Yousub
    • Journal of Intelligence and Information Systems
    • /
    • v.18 no.4
    • /
    • pp.43-57
    • /
    • 2012
  • To enhance the competitive advantage in a constantly changing business environment, an enterprise management must make the right decision in many business activities based on both internal and external information. Thus, providing accurate information plays a prominent role in management's decision making. Intuitively, historical data can provide a feasible estimate through the forecasting models. Therefore, if the service department can estimate the service quantity for the next period, the service department can then effectively control the inventory of service related resources such as human, parts, and other facilities. In addition, the production department can make load map for improving its product quality. Therefore, obtaining an accurate service forecast most likely appears to be critical to manufacturing companies. Numerous investigations addressing this problem have generally employed statistical methods, such as regression or autoregressive and moving average simulation. However, these methods are only efficient for data with are seasonal or cyclical. If the data are influenced by the special characteristics of product, they are not feasible. In our research, we propose a forecasting framework that predicts service demand of manufacturing organization by combining Case-based reasoning (CBR) and leveraging an unsupervised artificial neural network based clustering analysis (i.e., Self-Organizing Maps; SOM). We believe that this is one of the first attempts at applying unsupervised artificial neural network-based machine-learning techniques in the service forecasting domain. Our proposed approach has several appealing features : (1) We applied CBR and SOM in a new forecasting domain such as service demand forecasting. (2) We proposed our combined approach between CBR and SOM in order to overcome limitations of traditional statistical forecasting methods and We have developed a service forecasting tool based on the proposed approach using an unsupervised artificial neural network and Case-based reasoning. In this research, we conducted an empirical study on a real digital TV manufacturer (i.e., Company A). In addition, we have empirically evaluated the proposed approach and tool using real sales and service related data from digital TV manufacturer. In our empirical experiments, we intend to explore the performance of our proposed service forecasting framework when compared to the performances predicted by other two service forecasting methods; one is traditional CBR based forecasting model and the other is the existing service forecasting model used by Company A. We ran each service forecasting 144 times; each time, input data were randomly sampled for each service forecasting framework. To evaluate accuracy of forecasting results, we used Mean Absolute Percentage Error (MAPE) as primary performance measure in our experiments. We conducted one-way ANOVA test with the 144 measurements of MAPE for three different service forecasting approaches. For example, the F-ratio of MAPE for three different service forecasting approaches is 67.25 and the p-value is 0.000. This means that the difference between the MAPE of the three different service forecasting approaches is significant at the level of 0.000. Since there is a significant difference among the different service forecasting approaches, we conducted Tukey's HSD post hoc test to determine exactly which means of MAPE are significantly different from which other ones. In terms of MAPE, Tukey's HSD post hoc test grouped the three different service forecasting approaches into three different subsets in the following order: our proposed approach > traditional CBR-based service forecasting approach > the existing forecasting approach used by Company A. Consequently, our empirical experiments show that our proposed approach outperformed the traditional CBR based forecasting model and the existing service forecasting model used by Company A. The rest of this paper is organized as follows. Section 2 provides some research background information such as summary of CBR and SOM. Section 3 presents a hybrid service forecasting framework based on Case-based Reasoning and Self-Organizing Maps, while the empirical evaluation results are summarized in Section 4. Conclusion and future research directions are finally discussed in Section 5.