• Title/Summary/Keyword: civil construction engineer

Search Result 76, Processing Time 0.021 seconds

Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

Civil Engineering Conference in the Asian Region, Visit to Several Road and Bridge Construction Site of Japan (아시아 토목대회 및 일본 도로 교량건설 현장 시찰)

  • 장래섭
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.4
    • /
    • pp.17-29
    • /
    • 2001
  • After participating in the 2nd, Asian Civil Engineering Conference which is subjected by Japan, a trip of site during construction recent was done. The country Is being developed to use effectvely by the methods of aqua-line, truss suspersion bridge. double deck bridge, etc. The Japanese engineers have a pride to do their best for the construction In the given environment. 1 want to notify that our civil engineers must have the responsibility to develop the technical engineering, to make the useful country and to resolve the environmental problem via the oversea experience like as.

  • PDF

A Case Study on the Application of EPS Construction Method Considering Abutment Displacement in Soft Ground (연약지반에서의 교대변위를 고려한 EPS공법의 적용사례 연구)

  • Kang, Hee-June;Oh, Ill-Rok;Chae, Young-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.698-705
    • /
    • 2004
  • Application of structural load on soft ground can cause lateral movement as well as ground break due to pressing and shearing of ground. Especially, abutment supported by pile foundation can make pile deformed due to lateral movement of ground in order to have harmful effect on structure. According to the result of this study, it is required to consider disturbance of weak soil layer when using lateral movement countermeasure method by EPS construction method as a result of performing study on safety review and EPS construction method with respect to this based on site where lateral movement occurs due to backside soil filling load at bridge abutment installed on weak ground, and it is required to sufficiently consider soil reduction during design of EPS construction method due to lateral movement deformation of soft clay layer by losing ground horizontal resistance force due to plasticity of ground around pile as well as combination part damage with pile head and expansion foundation.

  • PDF

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

KOREAN CONSTRUCTION JOB MARKET FORECAST FOR CIVIL/ARCHITECTURAL ENGINEERS

  • Hwan Pyo Park;Myung Jin Chae;Minwoo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.952-955
    • /
    • 2005
  • In the early 90's, we had serious shortage of construction engineers in Korea. The shortage was acute especially in construction quality control and supervision area, which were gaining social attention due to the road bridge and the department store collapse that took the hundreds of lives in the early 90's in Seoul, Korea. In order to meet the high demand of construction engineers, the engineering license regulations were changed in 1995. Engineers who did not pass the written exam but have equivalent working experience are given engineering license to practice engineering legally. Since year 2000, while the severe engineer-shortage has been resolved, the opposite situation has occurred: there is serious over-supply of construction engineers. Policy makers and engineering practitioners are agreed to bring back the old-fashioned written exam engineer licensing system like before 1995, i.e., no more written exam exemption. However, the engineers who obtained license without taking written exam may not want to go back to old policy which would take their license. It is required to provide appropriate grace period before the new policy takes effect to minimize the impact of the changes. This paper forecasts the supply-demand of construction engineers providing the basis for the most appropriate policy changes.

  • PDF

Improvement strategy of market entry for construction engineer of young people (청년 건설기술인력의 일자리 창출방안에 관한 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo;Kim, Young-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.74-75
    • /
    • 2015
  • Recently domestic youth unemployment rate has increased continuously. The cause is due to construction recession. As a result, the youth unemployment rate was approximately 8.0% in 2013. In particular, graduates of civil engineers and architecture engineers are difficult to find a new job. Major construction companies also prefer new employees rather than career employees. Therefore, the employment rate of construction-related university graduates is continuing decline. Accordingly, construction and technical engineers will be aging. Therefore, this study was looking for ways to promote the overseas expansion of young construction engineers. And this research has suggested the ways which young engineers can find a new job through improving the system.

  • PDF

Improved Model for Index of Construction Engineer's Competency Evaluation System in Domestic Construction Management (국내 건설사업관리 기술인력 역량평가 개선모델(I2CEC))

  • Kang, Seongmi;Cha, Minsu;Lee, Woojae;Ji, Woojong;Cho, Hunhee;Yoo, Wisung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.47-58
    • /
    • 2020
  • The ICEC (Index of Construction Engineer's Competency) quantifies the competence of construction engineers using such parameters as experience, education, and qualifications and assigns four technical grades (expert, advanced, intermediate, and beginners) to construction engineers according to their scores for the efficient management and loading of technical personnel. However, as of 2020, the seventh year since its implementation, ICEC has shown many problems in its application, unlike its intended purpose. So institutional supplementation is required to provide improvement measures that can cope with the changing labor market environment and complement the current ICEC. Therefore, this study examined the current status of the career management system after the introduction of the ICEC, suggested a career index proportional to the competence of construction engineers from the beginner to the expert level, and developed an effective capability evaluation model I2CEC. The improved model presented in this study provides a means to comprehensively judge the performance, experience, and the professional work abilities of construction management engineers. Furthermore, the results of this study are expected to contribute to the development of efficient manpower and career management systems for enhancing the competitiveness of the domestic construction industry.