• Title/Summary/Keyword: city gas network

Search Result 22, Processing Time 0.019 seconds

A Study on the Characteristics of Waste Heat from the Industrial Complexes for Residential and Commercial Sectors (가정.상업부문 이용을 위한 산업체 폐열특성 연구)

  • 최영찬;박태준;홍재창;조선영
    • Journal of Energy Engineering
    • /
    • v.8 no.2
    • /
    • pp.242-247
    • /
    • 1999
  • The characteristics of waste heat effluents from 11 industrial complexes of 7 areas were analyzed to investigate the possibility of waste heat recovery of huge amount of waste heat producing from various industrial complexes. This study presents a part of the research work for the industrial waste heat for development of energy integrated network system in broad city area, which will utilize industrial waste heat for residential and commercial areas, where they are located at some distances from the complexes. The amount of waste heat from the investigated complexes was detected as 148,913 TOE/year. However, It was analyzed 83% of the waste heat was analyzed the temperature range from 0$^{\circ}C$ to 200$^{\circ}C$. Also, it was evaluated that 82% of waste heat was exhausted by flue gases. Especially, the characteristics of waste heat for the areas where most heat concentrated, such as Tae-gu industrial complex, Ul-san petrochemitry complex, Yio-chun petrochemistry complex, and Chun-ju industrial complex were investigated more precisely. Total amount of waste heat discharged from these four areas were analyzed 114,402 TOE/year, which was occupied as 77% of the total waste heat for the studied areas, and 87% of the waste heat from the industries was exhausted by flue gaseous phase and temperature range was from 0$^{\circ}C$ to 200$^{\circ}C$ 18.1 million TOE/year waste heat was released from the fossil fuel power plants, however 95% of waste heat was analyzed as cooling water from surface condensers at power plants. The temperature range was measured from 27$^{\circ}C$ to 34$^{\circ}C$, which are unable to utilize due to its low temperature. Otherwise, 5% (894,800 TOE/year) waste heat released from power plants were observed as flue gas, which temperature ranged from 90$^{\circ}C$ to 170$^{\circ}C$.

  • PDF

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.