• Title/Summary/Keyword: change-order

Search Result 10,929, Processing Time 0.041 seconds

Surface Change Detection in the March 5Youth Mine Using Sentinel-1 Interferometric SAR Coherence Imagery (Sentinel-1 InSAR 긴밀도 영상을 이용한 3월5일청년광산의 지표 변화 탐지)

  • Moon, Jihyun;Kim, Geunyoung;Lee, Hoonyol
    • Korean Journal of Remote Sensing
    • /
    • v.37 no.3
    • /
    • pp.531-542
    • /
    • 2021
  • Open-pit mines require constant monitoring as they can cause surface changes and environmental disturbances. In open-pit mines, there is little vegetation at the mining site and can be monitored using InSAR (Interferometric Synthetic Aperture Radar) coherence imageries. In this study, activities occurring in mine were analyzed by applying the recently developed InSAR coherence-based NDAI (Normalized Difference Activity Index). The March 5 Youth Mine is a North Korean mine whose development has been expanded since 2008. NDAI analysis was performed with InSAR coherence imageries obtained using Sentinel-1 SAR images taken at 12-day intervals in the March 5 Youth Mine. First, the area where the elevation decreased by about 75.24 m and increased by about 9.85 m over the 14 years from 2000 was defined as the mining site and the tailings piles. Then, the NDAI images were used for time series analysis at various time intervals. Over the entire period (2017-2019), average mining activity was relatively active at the center of the mining area. In order to find out more detailed changes in the surface activity of the mine, the time interval was reduced and the activity was observed over a 1-year period. In 2017, we analyzed changes in mining operations before and after artificial earthquakes based on seismic data and NDAI images. After the large-scale blasting that occurred on 30 April 2017, activity was detected west of the mining area. It is estimated that the size of the mining area was enlarged by two blasts on 30 September 2017. The time-averaged NDAI images used to perform detailed time-series analysis were generated over a period of 1 year and 4 months, and then composited into RGB images. Annual analysis of activity confirmed an active region in the northeast of the mining area in 2018 and found the characteristic activity of the expansion of tailings piles in 2019. Time series analysis using NDAI was able to detect random surface changes in open-pit mines that are difficult to identify with optical images. Especially in areas where in situ data is not available, remote sensing can effectively perform mining activity analysis.

Types and Site Characteristics of Rocks with Sinsun Relevant Place Name Morpheme ('신선(神仙)'을 지명소(地名素)로 하는 바위명의 유형과 입지특성)

  • Rho, Jae-Hyun;Park, Joo-Sung;Sim, Woo-Kyung
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.29 no.3
    • /
    • pp.61-77
    • /
    • 2011
  • This study focused on relevant rock names related to Sinsun(神仙) which had been settled as Taoist traces were combined with places. While interpreting major features of Sundoism relevant rocks, it also discussed types and places of rocks reflected in their names by considering distinct characteristics of landscape characters that ancestors viewed through the rocks or on the rocks. Conclusion of this study is summarized as follows. 1. Among the rock names related to Sinsun, the most frequently discovered one was Sinsunbawi(52) and followed by Sinsunbong(神仙峰: 38), Sinsundae(神仙臺: 31). Other than these, there were Gangsundae(降仙臺: 12), Sunyoodae (仙遊臺: 10) and Sasundae(四仙臺: 5). 2. In the name of Sinsundae, 'Dae(臺)' ascertains that it was located in greatly superb place in the aspects of viewpoint and appreciation where landscape superiority and overlook scenery were fair and outstanding. 3. Sinsunbong was named for a peak of mountain. At the same time, it implied a notion of worship with images of 'merging with sky' or 'looking up.' Most of time, Sinsunbong indicated the tallest rock in the mountain chain. 4. A significant number of Sinsunbong had names where legends of Sinsun's Go game or descent were originated from. It shows that 'Sinsun(仙) and Go game' used to be very important motives for folk etymology of Sinsun related rocks. Along with the Sinsundae, a number of Sinsunbawi were also turned out to exist in land and ocean with excellent marine view. 5. According to analysis of their altitudes and heights of the peaks where the rocks belong to, Sinsunbong, Sinsundae and Sinsunbawi were in order. It might indicate that the rocks were located on top of mountain or that Sinsunbong represented the mountain itself. Compared to this, Sinsundae was located in where distant panoramic views were overlooked. It was not necessarily to be in peak but in where with a great view like Taoist world. On the other hand, Sinsunbawi was located in where has fine scenery and great valley not so far from villages, which proved its name had been influenced by place feature not altitude. 6. Feature of rock with Sinsun related name is to comprise visual stability of worship object with close linkage to attitude of worshiper. Considering its deep connection with communicative method of worship object and worshiper, seemingly it was main factor to lead folk etymology of rocks with Sinsun related names. 7. Rock is an object with the greatest implication of Sinsun imagination and Sinsun rocks show most clearly the fact that Taoism, which used to be considered as inaccessible, had been actualized in a visual and realistic manner with the change of time.

Legal Issues and Tasks for the Establishment of National Contract for Peace and Unification ('평화통일국민협약' 추진의 법제도적 과제)

  • Choi, Cheol-Young
    • Journal of Legislation Research
    • /
    • no.55
    • /
    • pp.57-94
    • /
    • 2018
  • Crisis of trust in Korean society, especially south-south conflicts among Korean political circle, civil society and peoples on the issue of the Korean peninsula policy driven by south Korean government, have weakened the sustainable and consistent energy of the policy for peace and unification of Korea peninsula. At the moment of drastic change of south-north relation in Korean peninsula, National agreement as a foundation of sustainable peace and unification policy has very important meaning. Because of this, national contract of unification as a kind of social concertation, has been demanded. National contract for peace and unification is an unprecedented process for making unofficial legal norm because it authorize quasi-legislative binding force on the agreement which is concluded by the Korean political circle, civil society and peoples for the peace and unification of Korean peninsula. National contract for peace and unification includes 'agreed aim and principles' for peace, prosperity and unification as well as process and result. And National contract for peace and unification, also is characterized long duration of aim achievement and openness of participating subjects. In terms of law, it will be legitimate source for comprehensive modification of international and internal law. In addition, The nature of National contract for peace and unification, as a people's law, should be considered as soft law which has the power to realize its contents through the enactment of legislation and policy. In order to guarantee the establishment and effectiveness of National contract for peace and unification, the setting of organization is need to determine the range of representatives, who participate in the process of contract making, procedure of contract and to carry out the contract after the conclusion of National contract for peace and unification. For the reason, the Council of National Contract for Peace and Unification as a independent administrative government committee and 'Act on National Contract for Peace and Unification' is needed.

A Study on Comparing the Original and Current Jongmyo Jeryeak (종묘제례악 원형과 현행의 비교 고찰)

  • Moon, Sukhie
    • (The) Research of the performance art and culture
    • /
    • no.32
    • /
    • pp.31-70
    • /
    • 2016
  • Jongmyo Jeryeak [Royal ancestral shrine music] is a precious cultural heritage, which has been played till now since two great kings Sejong and Sejo who made it. But going through Japanese occupation, Jongmyo Jeryeak has been changed into a music totally different from the music the two kings intended. And the changed Jongmyo Jeryeak is being played these days. The original Jongmyo Jeryeak, which was made by the two kings, remains in old music scores. Therefore there is a need to investigate the differences between the original and current Jongmyo Jeryeak by interpreting the old music scores and recovering the original. This paper recovers the origianl Jongmyo Jeryeak from the music score Daeakhubo and compares it with the current Jongmyo Jeryeak. The results are as follows. The origianl Jongmyo Jeryeak is a set of common songs made with Hyangak and Gochiak to sing the verses which extol royal ancestors' virtues. All of the musical elements are matched with the verses so that the meaning of the verses is transmitted naturally. Jangdan musical time musical structure are matched with the structure of verses, and the musical motif of the songs is matched with the meaning of the verses. The music, which is easy and expresses the meaning of the verses well, demonstrates King Sejong's talent as a musician. The current Jongmyo Jeryeak is a set of special songs in which Sigimsae is emphasized rather than the meaning of the verses. The melodies are broken into pieces inconsistently, the meaningless word 'ae' is added thoughtlessly, and Jangdan musical time musical structure are unrelated to the verses. Therefore the meaning of the verses is not transmitted at all. These changes, which were made during the period of Japanese occupation, seem to desecrate the verses of the original songs. The melodies, which are broken into pieces inconsistently, revive into the current mysterious ritual music through Sigimsae. But in order to be a proper ritual music, some corrections have to be made to convey the meaning of the verses.

A Study on Junghui Kim's Concepts in Seodok(書牘) (서독(書牘)에 나타난 완당(阮堂) 김정희(金正喜)의 사상(思想) 연구(硏究))

  • Kwon, Hyok-Soon
    • (The)Study of the Eastern Classic
    • /
    • no.33
    • /
    • pp.279-304
    • /
    • 2008
  • This paper draws out the contents related to "Yuk(易)" Silhak(實學), and discusses the tendency in order to review the ideas shown in Wandang's Seodok(書牘). Also, it studies Taoism expressed in Seodok in terms of figuring out Wandang's Taoism. The features of his thoughts are following. The first one is the use of "Yuk(易)" for Soogichiin(修己治人). What he considered most important was Eumsiknamnyu(飮食男女) linked directly to the people's life. He maintained that a country must be ruled by doing Soogi(修己) with "Yuk(易)" and by making use of "Yuk(易)". The next one is both a view of Gyungsechiyong(經世致用) of Dongseoboolboon(東西不分) and a natural view of Iyonghooseng(利用厚生), standing on Silsagusi(實事求是). He actively accepted new learning and concepts those days, and he asserted that Western techniques should be even imitated for the sake of the nation. Thirdly, his view of Moowi(無爲) and Boolun(不言). He didn't use to do any Jakwi(作爲) of Jeosool(著述). This kind of view seems to save his life and be connected to Yangshin(養身) even though others tried to keep a jealous eye on and entrap him. Last, his concept of Jayeonsooneung(自然順應) and Jayeonhoigui(自然回歸). It is shown through his wish of farm work and his politics, saying that a king ought not to bind the people with faithfulness and propriety, and that he ought to rule the nation with humanity. In sum, Wandang's ideas shown in Seodok can be divided into two streams. One is Boshin(保身) through Moowijayeon(無爲自然), Boolun(不言), and Jayeonhoigui(自然回歸). The other is a pursuit of his studies for the purpose of Dukchi(德治) followed by Soogichiin, Kyongsechiyong, Iyonghooseng, and Injung. Here, since Boshin can be said to be advanced Soogi, and Soogichiin and others are connected directly to people's comfortable life, they can be integrated to Soogiianbaeksung(修己以安百姓). In other words, his thoughts were based on the fusion of Confucianism and Taoism, and he aimed at Soogiianbaeksung by accepting and using to take a look at the change of period and learning.

Electrochemical Performance of CB/SiOx/C Anode Materials by SiOx Contents for Lithium Ion Battery (SiOx 함량에 따른 CB/SiOx/C 음극재의 전기화학적 특성)

  • Kim, Kyung Soo;Kang, Seok Chang;Lee, Jong Dae;Im, Ji Sun
    • Applied Chemistry for Engineering
    • /
    • v.32 no.1
    • /
    • pp.117-123
    • /
    • 2021
  • In this study, the composite was prepared by mixing SiOx, soft carbon, and carbon black and the electrochemical properties of lithium ion battery were investigated. The content of SiOx added to improve the capacity of the soft carbon anode material was varied to 0, 6, 8, 10, 20 wt%, and carbon black was added as a structural stabilizer for reducing the volume expansion of SiOx. The physical properties of prepared CB/SiOx/C composite were investigated through XRD, SEM, EDS and powder resistance analysis. In addition, the electrochemical properties of prepared composite were observed through the charge/discharge capacity, rate and impedance analysis of the lithium ion battery. The prepared CB/SiOx/C composite had an inner cavity capable of mitigating the volume expansion of SiOx by adding carbon black. The formed internal cavity showed a low initial efficiency when the SiOx content was less than 8 wt%, and low cycle stability when the content of SiOx was less than 20 wt%. The CB/SiOx/C composite containing 10 wt% of SiOx showed an initial discharge capacity of 537 mAh/g, a capacity retention rate of 88%, and a rate of 79 at 2C/0.1C. SiOx was added to improve the capacity of the soft carbon anode material, and carbon black was added as a structural stabilizer to buffer the volume change of SiOx. In order to use the CB/SiOx/C composite as a high-efficiency anode material, the mechanism of the optimal SiOx and the use of carbon black as a structural stabilizer was discussed.

Development of Estimation Equation for Minimum and Maximum DBH Using National Forest Inventory (국가산림자원조사 자료를 이용한 최저·최고 흉고직경 추정식 개발)

  • Kang, Jin-Taek;Yim, Jong-Su;Lee, Sun-Jeoung;Moon, Ga-Hyun;Ko, Chi-Ung
    • Journal of agriculture & life science
    • /
    • v.53 no.6
    • /
    • pp.23-33
    • /
    • 2019
  • In accordance with a change in the management information system containing the management record and planning for the entire national forest in South Korea by an amendment of the relevant law (The national forest management planning and methods, Korea Forest Service), in this study, average, the maximum, and the minimum values for DBH were presented while only average values were required before the amendment. In this regard, there is a need for an estimation algorithm by which all the existing values for DBH established before the revision can be converted to the highest and the lowest ones. The purpose of this study is to develop an estimation equation to automatically show the minimum and the maximum values for DBH for 12 main tree species from the data in the national forest management information system. In order to develop the estimation equation for the minimum and the maximum values for DBH, there was exploited the 6,858 fixed sample plots of the fifth and the sixth national forest inventory between in 2006 and 2015. Two estimation models were applied for DBH-tree age and DHB-tree height using such growth variables as DBH, tree age, and height, to draw the estimation equation for the maximum and the minimum values for DBH. The findings showed that the most suitable model to estimate the minimum and the maximum values for DBH was Dmin=a+bD+cH, Dmax=a+bD+cH with the variables of DBH and height. Based on these optimal models, the estimation equation was devised for the minimum and the maximum values for DBH for the 12 main tree species.

Work Environment Measurement Results for Research Workers and Directions for System Improvement (연구활동종사자 작업환경측정 결과 및 제도개선 방향)

  • Hwang, Je-Gyu;Byun, Hun-Soo
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.30 no.4
    • /
    • pp.342-352
    • /
    • 2020
  • Objectives: The characteristics of research workers are different from those working in the manufacturing industry. Furthermore, the reagents used change according to the research due to the characteristics of the laboratory, and the amounts used vary. In addition, since the working time changes almost every day, it is difficult to adjust the time according to exposure standards. There are also difficulties in setting standards as in the manufacturing industry since laboratory environments and the types of experiments performed are all different. For these reasons, the measurement of the working environment of research workers is not realistically carried out within the legal framework, there is a concern that the accuracy of measurement results may be degraded, and there are difficulties in securing data. The exposure evaluation based on an eight-hour time-weighted average used for measuring the working environment to be studied in this study may not be appropriate, but it was judged and consequently applied as the most suitable method among the recognized test methods. Methods: The investigation of the use of chemical substances in the research laboratory, which is the subject of this study, was conducted in the order of carrying out work environment measurement, sample analysis, and result analysis. In the case of the use of chemical substances, after organizing the substances to be measured in the working environment, the research workers were asked to write down the status, frequency, and period of use. Work environment measurement and sample analysis were conducted by a recognized test method, and the results were compared with the exposure standards (TWA: time weighted average value) for chemical substances and physical factors. Results: For the substances subject to work environment measurement, the department of chemical engineering was the most exposed, followed by the department of chemistry. This can lead to exposure to a variety of chemicals in departmental laboratories that primarily deal with chemicals, including acetone, hydrogen peroxide, nitric acid, sodium hydroxide, and normal hexane. Hydrogen chloride was measured higher than the average level of domestic work environment measurements. This can suggest that researchers in research activities should also be managed within the work environment measurement system. As a result of a comparison between the professional science and technology service industry and the education service industry, which are the most similar business types to university research laboratories among the domestic work environment measurements provided by the Korea Safety and Health Agency, acetone, dichloromethane, hydrogen peroxide, sodium hydroxide, nitric acid, normal hexane, and hydrogen chloride are items that appear higher than the average level. This can also be expressed as a basis for supporting management within the work environment measurement system. Conclusions: In the case of research activity workers' work environment measurement and management, specific details can be presented as follows. When changing projects and research, work environment measurement is carried out, and work environment measurement targets and methods are determined by the measurement and analysis method determined by the Ministry of Employment and Labor. The measurement results and exposure standards apply exposure standards for chemical substances and physical factors by the Ministry of Employment and Labor. Implementation costs include safety management expenses and submission of improvement plans when exposure standards are exceeded. The results of this study were presented only for the measurement of the working environment among the minimum health management measures for research workers, but it is necessary to prepare a system to improve the level of safety and health.

A Case Study on Psychological Burnout and Self-care of Childcare Teachers for Emotional Labor -Song psychotherapy- (감정노동 보육교직원의 심리적 소진과 자기 돌봄의 관한 사례연구 -노래심리치료-)

  • Lee, Ji-Hoon;Shin, Soo-Won
    • Industry Promotion Research
    • /
    • v.6 no.3
    • /
    • pp.9-17
    • /
    • 2021
  • Childcare teacher experience emotional labor that suppresses, exaggerates, controls and regulates their emotions in order to produce the positive image required in the nursery field. The working environment for infants and toddlers has a problem of lowering the quality of life as a cause of psychological exhaustion of the emotional labor childcare teacher. Because singing helps to improve the quality of human life, research is needed to enable emotional labor childcare teacher to recover from psychological exhaustion and plan a positive life in the process of self-care. First, how is the psychological exhaustion of the emotional labor childcare teacher through song psychotherapy? Second, how is the process of self-care of the emotional labor childcare teacher through song psychotherapy? The study was conducted from March 2017 to May 2020, and through qualitative case studies, data such as in-depth interviews, direct observations, and participation observations were collected at the ○○○ daycare center for 50 minutes every 12 sessions. Based on the above findings, the following conclusions were drawn: First, through singing psychotherapy, emotional labor and childcare staff were able to discover, understand, recognize, face, communicate, and insight into their will to live, psychologically exhausted themselves. Emotional support from others can reduce the experience of emotional depletion and demonstrate a recovery of experience and an improvement in achievement due to frustration at work. Second, the self-care of the emotional labor child care teacher through song psychotherapy proved the temporal, spatial, relational, and emotional caring process, while maintaining the balance between caring for others and caring for oneself, body, mind, and spirituality are organic change. In this study, the psychological exhaustion and self-care process provides an opportunity to discover the essence of life, explore and express one's inner self, take care of others and oneself in a balanced manner, and provide insights for a whole person and healthy self. It is significant in providing opportunities to improve the quality of life through growth.

Effect of SO2 on the Simultaneous Removal of Mercury and NOx over CuCl2-loaded V2O5-WO3/TiO2 SCR Catalysts (CuCl2가 담지된 V2O5-WO3/TiO2 SCR 촉매에 의한 수은 및 NOx 동시 제거에서 SO2의 영향)

  • Ham, Sung-Won
    • Clean Technology
    • /
    • v.28 no.1
    • /
    • pp.38-45
    • /
    • 2022
  • CuCl2-loaded V2O5-WO3/TiO2 catalyst showed excellent activity in the catalytic oxidation of elemental mercury to oxidized mercury even under SCR condition in the presence of NH3, which is well known to significantly inhibit the oxidation activity of elemental mercury by HCl. Moreover, it was confirmed that, when SO2 was present in the reaction gas together with HCl, excellent elemental mercury oxidation activity was maintained even though CuCl2 supported on the catalyst surface was converted to CuSO4. This is thought to be because not only HCl but also the SO4 component generated on the catalyst surface promotes the oxidation of elemental mercury. However, in the presence of SO2, the total mercury balance before and after the catalytic reaction was not matched, especially as the concentration of SO2 increased. In order to understand the cause of this, further studies are needed to investigate the effect of SO2 in the SnCl2 aqueous solution employed for mercury species analysis and the effect of sulfate ions generated on elemental mercury oxidation. It was confirmed that SO2 also promotes NOx removal activity, which is thought to be because the increase in acid sites by SO4 generated on the catalyst surface by SO2 facilitates NH3 adsorption. The composition change and structure of the components present on the catalyst surface under various reaction conditions were measured by XRD and XRF. These measurement results were presented as a rational explanation for the results that SO2 enhances the oxidation activity of elemental mercury and the NOx removal activity in this catalyst system.