• 제목/요약/키워드: chamber model blast test

검색결과 3건 처리시간 0.016초

A new concept for blast hardened bulkheads with attached aluminum foam

  • Kim, Sung-Ho;Woo, Heekyu;Choi, Gul-Gi;Yoon, Kyungho
    • Structural Engineering and Mechanics
    • /
    • 제65권3호
    • /
    • pp.243-250
    • /
    • 2018
  • The use of blast hardened bulkheads (BHBs) is an effective vulnerability hardening technique for improving the survivability of naval warships when internal explosions occur due to being shot by an anti-surface missile. In this paper, a new concept of BHBs reinforced by aluminum (Al) foam is proposed. The new concept can significantly reduce the blast pressures transferred to bulkheads and, unlike conventional BHBs, can be easily installed to operating naval warships. Chamber model blast tests were performed to demonstrate the effectiveness of the Al-foam BHBs and the results are further supported by numerical simulations. Finally, a practical preliminary is proposed for the Al-foam BHBs.

Analysis of SLF Interruption Performance of Self-Blast Circuit Breaker by Means of CFD Calculation

  • Kim, Hong-Kyu;Chong, Jin-Kyo;Lee, Se-Hee
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권1호
    • /
    • pp.254-258
    • /
    • 2014
  • This paper presents the performance analysis results of a short line fault interruption of a gas circuit breaker, particularly a self-blast type breaker. Hot gas flow analysis was carried out using a CFD calculation combined with the arc model and nozzle ablation model. To evaluate the interruption performance, the index function was defined using the pressure in the heating chamber and the density above the arc region. The simulation and test results showed that the gas flow field and suitable choice of an interruption performance index can be used to predict the interruption characteristics and provide guidelines for designing self-blast breakers with a higher interruption capability.

축소 모형실험을 통한 토피조건별 이수압식 쉴드 TBM의 챔버압 및 이수분출 가능성 평가 (A study on the face pressure control and slurry leakage possibility using shield TBM model test)

  • 고성일;신현강;나유성;정혁상
    • 한국터널지하공간학회 논문집
    • /
    • 제22권3호
    • /
    • pp.277-291
    • /
    • 2020
  • 쉴드 TBM은 기존 재래식 터널(Drill and Blast)에 비하여 터널을 굴착하는 지반 및 선형조건에서 적용범위가 넓은 공법으로 대단면, 대심도, 초연약지반에서의 터널링 공법으로 중요성이 부각되고 있으며, 현재 13.3 m의 대구경 slurry 쉴드 TBM이 한강 하부 통과를 위한 시공을 준비하고 있다. 쉴드 TBM은 이수압식과 토압식 쉴드 TBM으로 구분되고, 각각의 특성에 따라 시공 중 관리 항목이 달라진다. 본 논문에서는 연약지반에 주로 시공되는 이수압식 쉴드 TBM을 대상으로 장비형식, 발생기원, 적용 사례 및 트러블 사례를 분석하였다. 또한, 적정 챔버압, 장비 전방으로의 이수 분출(또는 누수)가능성을 토피고 조건에 따라 2D 및 3D 모형실험 실시하였다. 이를 토대로 연약지반 조건에서 이수압식 쉴드 TBM 시공 시 적정 굴진면 토압과 챔버압 예측을 위한 기초 및 참고자료 제공 그리고 토피고 조건에 따른 이수분출 위험 높이를 제안하여 이수분출로 인한 안정성 및 환경요인 저하원인을 최소화하기 위한 방안을 제안하였다.