• Title/Summary/Keyword: chamber model blast test

Search Result 3, Processing Time 0.021 seconds

A new concept for blast hardened bulkheads with attached aluminum foam

  • Kim, Sung-Ho;Woo, Heekyu;Choi, Gul-Gi;Yoon, Kyungho
    • Structural Engineering and Mechanics
    • /
    • v.65 no.3
    • /
    • pp.243-250
    • /
    • 2018
  • The use of blast hardened bulkheads (BHBs) is an effective vulnerability hardening technique for improving the survivability of naval warships when internal explosions occur due to being shot by an anti-surface missile. In this paper, a new concept of BHBs reinforced by aluminum (Al) foam is proposed. The new concept can significantly reduce the blast pressures transferred to bulkheads and, unlike conventional BHBs, can be easily installed to operating naval warships. Chamber model blast tests were performed to demonstrate the effectiveness of the Al-foam BHBs and the results are further supported by numerical simulations. Finally, a practical preliminary is proposed for the Al-foam BHBs.

Analysis of SLF Interruption Performance of Self-Blast Circuit Breaker by Means of CFD Calculation

  • Kim, Hong-Kyu;Chong, Jin-Kyo;Lee, Se-Hee
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.1
    • /
    • pp.254-258
    • /
    • 2014
  • This paper presents the performance analysis results of a short line fault interruption of a gas circuit breaker, particularly a self-blast type breaker. Hot gas flow analysis was carried out using a CFD calculation combined with the arc model and nozzle ablation model. To evaluate the interruption performance, the index function was defined using the pressure in the heating chamber and the density above the arc region. The simulation and test results showed that the gas flow field and suitable choice of an interruption performance index can be used to predict the interruption characteristics and provide guidelines for designing self-blast breakers with a higher interruption capability.

A study on the face pressure control and slurry leakage possibility using shield TBM model test (축소 모형실험을 통한 토피조건별 이수압식 쉴드 TBM의 챔버압 및 이수분출 가능성 평가)

  • Koh, Sungyil;Shin, Hyunkang;La, You-Sung;Jung, Hyuksang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.3
    • /
    • pp.277-291
    • /
    • 2020
  • Shield TBM is a tunnelling method that has a wider range of applications in the poor ground condition compared to conventional tunnels (Drill and Blast). Currently, a 13.3 m large-diameter slurry shield TBM is preparing for construction to pass under the Han River. Shield TBM is divided into slurry and EPB shield TBM, and management items during construction are different depending on each characteristic. In this paper, the equipment type, origin, application case and trouble case were analyzed for slurry shield TBM, which is mainly constructed in soft ground. In addition, 2D and 3D model tests were conducted on the condition of soil depth for the possibility of slurry leakage into front of the equipment, with appropriate chamber pressure. Based on this paper, it proposed to provide basic and reference data for proper excavation surface pressure and chamber pressure during construction of slurry shield TBM under soft ground conditions, and proposed measures to minimize stability and environmental decline due to slurry ejection.