• Title/Summary/Keyword: ceiling finishing work

Search Result 4, Processing Time 0.018 seconds

Priority on Work Improvement for Automation of Ceiling Finishing Work (천장마감공사 자동화기술 적용을 위한 작업개선 우선순위 도출)

  • Lee, June-Hyuck;Lee, Dongyoun;Kang, Goune;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.187-188
    • /
    • 2015
  • The construction finishing work is emphasized according to high dependence on labor and long term that occupy approximately 40% in construction period, so that it is required for the alternatives such as automation technology. However, it is insufficient to develop the automation technology of construction finishing work compared to other works, for instance, frame work. Also it is not enough about this preliminary research which survey the improvement needs to select the development object. Therefore, this study aimed at derivation of detail works required improvement in ceiling finishing work by the questionnaire survey. These results may provide the basic information to develop the automation technology of construction finishing work.

  • PDF

A Study on the Using Trends of Interior Materials in Current Medium Size Office Building in Seoul (최근 서울시 중형 OFFICE 건물의 실내재료의 사용경향에 관한 연구)

  • 김은중
    • Korean Institute of Interior Design Journal
    • /
    • no.23
    • /
    • pp.19-25
    • /
    • 2000
  • This study aims by analysing the interior design elements trends of current medium size office buildings in Seoul. The analysing objects are ceiling, floor, wall, and illumination plan of current office buildings. Analysing tools are finishing material and color of each part. Analysing areas are lobby area, deskwork area, conference area, welfare area, public area(rest room, corridor, stair). The interior design elements of lobby shows a lots of different features then the other areas in ceiling, floor, and wall design. Such difference appears at finishing material especially, and the coloring is more splendorous then the other areas. Desk work area and conference area have similar characteristics in finishing materiors and colors, and they usually follow the needs of function. Walfare area shows more splendorous feature then deskwork and conference area, and designed by various materials and colors. Public area also shows very active design concept then past times.

  • PDF

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

Evaluating Importance of Defects through Defect Dispute Case Study in Apartment Buildings (하자분쟁사례를 통한 공동주택 하자 중요도 평가에 관한 연구)

  • Lee, Sang-Hoon;Kim, Jae-Jun;Lee, Sang-Hyo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.56-64
    • /
    • 2019
  • Various defects that occur in the maintenance stage are connected to all kinds of wasted resources and economic losses as additional investments are made. Residents are harmed temporally, materially, and psychologically, and businesses suffer not only monetary losses but also reduced credit ratings. The aim of this study was to increase the efficiency of quality management and minimize defect disputes by estimating the importance of the defect type considering the defect frequency and severity in apartment buildings. For this, 7,548 defect items for 48 apartment buildings were examined. The analysis confirmed that defects are concentrated on RC, finishing and MEP work. In addition, defects with high importance are identified as broken, incorrect installation, missing tasks, and water problems. In addition, the exterior wall/roof, the Internal wall, ceiling, and floor, which are constructed in the field, are more important than the furniture and MEP equipment installed in the field.