• Title/Summary/Keyword: cast-in-place

Search Result 292, Processing Time 0.021 seconds

The Behavior of the Cast-in-place Pile Socketed in Rock Considering Soil-Structure Interaction (지반-구조물간 상호작용을 고려한 암반에 근입된 현장타설말뚝의 거동)

  • 최진오;권오성;김명모
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.457-468
    • /
    • 2000
  • The design values of rock socketed pile related with properties of rock mass are not clearly established. However, the drilled shafts socketed in rock are widely used as the foundation of large scaled structure. In this study, the characteristics of behavior of rock socketed pile is researched, and the properties of interface between pile and rock considering soil-structure interaction are evaluated for numerical modeling of rock socketed pile based on the previous researches. Based on the properties of interface and rock mass, the behaviors of rock socketed piles are numerically modeled and compared with field measurement. To verify the numerical analysis, a micro pile socketed in rock is modeled and the results of numerical analysis are compared with field measurement. The numerical results show a good agreement with field measured data, especially in terms of load transfer characteristics.

  • PDF

Study on Safety Evaluation of the Half-Depth Precast Deck with RC Rib Pannel for the Flexural Behavior (리브 형상을 갖는 반단면 프리캐스트 판넬의 휨 안전성 평가 연구)

  • Hwang, Hoon Hee
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.4
    • /
    • pp.76-84
    • /
    • 2019
  • The precast pannels are used as formwork in Half-depth precast deck systems. Therefore, it has many advantages, including safe and convenient construction and reduced construction period compared to cast-in-place construction method. In half-depth precast deck systems, the bonding of precast pannels to cast-in place concrete is very important. To enhance the performance of half-depth precast deck system, it is necessary to improve the composite efficiency of the interface or increase the stiffness of the precast pannel to reduce deformation or stress on the interface. In this study, a flexural test of half-depth precast deck system was performed, in which the shear connecting reinforcement was applied to increase the bonding performance at the interface, and the rib shape precast panels were applied to improve stiffness. In addition, the safety and serviceability of these systems were evaluated. Test results show that all of specimens have the required flexural strength under the ultimate strength limit design. It was also evaluated to have sufficient safety for the serviceability of deflection and crack under the serviceability limit design.

Simple Bond Stress and Slip Relationship between CFRP Plank and Cast-in-Place DFRCC (탄소섬유 FRP판과 현장타설 고인성섬유보강콘크리트 사이의 단순 부착슬립 관계)

  • Yoo, Jun-Sang;Yoo, Seung-Woon
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.7 no.1
    • /
    • pp.25-31
    • /
    • 2016
  • Bond stress between cast-in-place ductile fiber reinforced cementitious composites and CFRP plank were experimentally analyzed. As failure shape, the mixture of failure between CFRP plank and epoxy, and failure between concrete and epoxy was shown. In case of RFCON from the suggested simple bond slip relationship, the maximum average bond stress was 5.39MPa, the initial slope was 104.09MPa/mm, and the total slip length was 0.19mm. PPCON showed the maximum average bond stress of 4.31MPa, the initial slope of 126.67MPa/mm, and the total slip length of 0.26mm, while RFCON+ appeared to have 8.71MPa, 137.69MPa/mm, 0.16mm. PPCON+ had 6.19MPa maximum average bond stress, 121.56MPa/mm initial slope, and 0.34mm total slip length. To comprehend the behavior of composite structure of FRP and concrete, local bond slip relation is necessary, and thus a simple relation is suggested to be easily applied on hybrid composite system.

Cutting of Concrete Block Using Detonating Cords (도폭선을 이용한 콘크리트 블록 절단 연구)

  • Kim, Jung-Gyu;Kim, Jong-Gwan
    • Explosives and Blasting
    • /
    • v.37 no.4
    • /
    • pp.17-25
    • /
    • 2019
  • The method to remove the head of the cast-in-place pile using the detonating cord and horizontal separation plate was proposed in this paper. Plain concrete block was fabricated. Through the blasting test of the concrete block, the charge weight and the burden required for cutting the pile head were identified. The degree of damage of concrete blocks after cutting the head was checked using AUTODYN 2D. As a result of the experiment, it was found that the concrete block was cut using the 10 g/m detonating cord and horizontal separation plate, and the directional cutting of the block using the horizontal separation plate and the block damage caused by the detonating cord were reduced.

System-Theoretic View of Marine Pilotage Accident in Busan New Port

  • Wamugi Juliet Wangui;Sora Kim;Young-soo Park
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2023.05a
    • /
    • pp.142-143
    • /
    • 2023
  • A contact accident with gantry cranes involving the container ship MV Milano Bridge in Busan New Port took place on 6 April 2020. The report concluded that the pilot unreasonably piloted the ship with impaired maneuverability and without a proper pilotage plan. Analyzing the entire system by CAST model gives a holistic approach in linking all the key components and their roles as well as violations that led to the accident, stepping away from placing the blame on only one component in the system. Furthermore, analyzing the accident as an system theory gives a clear overview of the relationships between system components and how these interactions led to the accident.

  • PDF

Quantitative Evaluation for Fatigue Limit and its Application to Spheroidal Graphite Cast Iron (피로한도의 정량평가법과 구상흑연주철에 대한 적용)

  • Kim, Jin-Hak;Kim, Min-Gun
    • Journal of Industrial Technology
    • /
    • v.18
    • /
    • pp.203-208
    • /
    • 1998
  • Fatigue tests were performed to examine the 4 parameter method for specimens prepared by various heat treatment which resulted in different mechanical properties. Obtained main results are as follows. (1) Samples treated by austempering did not show the expected improvement of fatigue limit although hardness and strength increased. This is attributed to the fact that defect sensitivities of materials increase as increasing of hardness and tensile strength, it is also shown that the graphites acting as stress concentration place become larger by austempering heat treatment than by normal annealing. (2) It is very reasonable to predict the fatigue limit of ductile irons with 4 parameter method based on ${\sigma}_{TS}$, $H_v$, ${\Delta}K_{th}$ and ${\sqrt{area}}_{max}$. (3) The half-austempering treatment appeared to be more useful than the full-austempering method to improve the fatigue limit in the spheroidal graphite cast iron with multi defective material.

  • PDF

Shear Resistance of Unreinforced Cast-In-Place Anchors in Uncracked and Cracked Concrete by Seismic Qualification Tests (지진모의실험에 의한 비균열 및 균열콘크리트에 매입된 비보강 선설치앵커의 전단 저항강도 평가)

  • Park, Yong Myung;Kim, Tae Hyung;Kim, Dong Hyun;Jo, Sung Hoon;Lee, Jong Han
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.3
    • /
    • pp.347-357
    • /
    • 2015
  • In this study, an experimental study was performed to evaluate the concrete breakout strength of unreinforced cast-in-place anchors by seismic qualification test under shear loading. The CIP anchors tested herein were 30mm in diameter with an edge distance of 150mm and an embedment depth of 240mm in uncracked and cracked concrete. The cracked specimen consisted of orthogonal and parallel crack to the loading direction, respectively. The dynamic loading sequence during the seismic qualification test was determined based on CSA N287.2, ACI 355.2 and ETAG 001 codes. After the dynamic loading, the static loading was applied until failure occurs. The shear resistance by seismic qualification tests showed almost the same strength as that obtained from the static tests in uncrcaked and cracked concrete, respectively. Meanwhile, the breakout depth did not reach $8d_0$, therefore the modified strength equation of ACI 318-11 could estimate properly the concrete breakout strength, which does not consider effective bearing length.

A Numerical Study on the Estimation Method of the Results of Static Pile Load Test Using the Results of Bi-directional Pile Load Test of Barrette Piles (바렛말뚝의 양방향재하시험을 이용한 정적압축재하시험 결과 추정방법에 관한 수치해석적 연구)

  • Hong, Young-Suk;Yoo, Jae-Won;Kang, Sang-Kyun;Choi, Moon-Bong;Lee, Kyung-Im
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.1
    • /
    • pp.39-53
    • /
    • 2019
  • Bi-directional pile load test (briefly called 'BDH PLT') cannot be performed at loading levels where ultimate bearing capacity could be assessed in field, it is not possible to precisely determine both ultimate load and yield load and under loading. Since the load is transmitted separately to the skin and the end unlike the static pile load test (briefly called 'SPLT') and the direction of loading on the skin is opposite, such methods could have a result different from actual movements of shafts. In this study, three-dimensional finite element method (briefly called '3D FEM') analysis was conducted from results of the BDH PLT, made with barret piles, which were large-diameter cast-in-place concrete piles, and the calculated design constants were applied to the 3D FEM analysis of the SPLT to interpret them numerically and then, actual behaviors of cast-in-place concrete piles were estimated. First, using the results of the BDH PLT with cast-in-place concrete piles, behaviors of the piles made by loading upwards and downwards were analyzed to calculate load-displacement. Second, the design constants, calculated by the 3D FEM analysis and the back analysis, were applied on the 3D FEM analysis for the SPLT, and from these results, behaviors of the SPLT through the BDH PLT was analyzed. Last, the results of the 3D FEM analysis of the SPLT through the BDH PLT was expressed in relationships as {A ratio of bearing capacity of the SPLT and of the BDH PLT (y)} ~ {A ratio of reference displacement and pile circumference (x)}, and they were all classified by reference displacement at 10.0 mm, 15.0 mm, and 25.4 mm.

A STUDY ON THE FRACTURE STRENGTH OF TEETH RESTORED WITH A CARBON FIBER POST UNDER CYCLIC LOADING (반복하중하에서의 carbon fiber post의 파절강도에 관한 연구)

  • Yi, Yang-Jin
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.38 no.5
    • /
    • pp.640-649
    • /
    • 2000
  • In the restoration of endodontically treated teeth, carbon fiber post was recently introduced. The purpose of this in vitro study was to investigate the fracture strength of teeth restored with a pre-fabricated carbon fiber post in comparison with teeth restored with a prefabricated titanium post & custom cast gold post after cyclic loading in the different environment. A total of 30 recently extracted human central incisors of similar dimension with crowns removed were used. All teeth were placed into acrylic blocks and every steps for post and core fabrication were made accord-ing to manufacture's instruction. The post length and core dimensions were standardizd. All teeth were divided into 6 groups: 1) carbon fiber post / atmosphere, 2) titanium post / atmosphere, 3) gold post / atmosphere, 4) carbon fiber post / wet, 5) titanium post / wet, 6) gold post / wet. Carbon fiber post and titanium post were cemented in place using resin cement and cores were fabricated with Ti-Core. Custom cast gold post was made from Duralay pattern resin and cemented using resin cement, too. All specimens were thermocycled 10,000 times. After 50,000 cyclic loading, failure strength was measured using Instron testing machine. Kruskal-Wallis test followed by Mann-Whitney test was used to compare the mean fracture strength. Results were as follows : 1. All specimens showed lower fracture strength in wet environment after cyclic loading than in atmosphere condition, but did not reveal a significant difference. 2. There was no significant difference between carbon fiber post specimen and titanium post specimen in the same environment. 3. Gold cast post specimen showed significant different greater fracture strength than those of others in the same environment. 4. Carbon fiber post specimen showed no root fracture.

  • PDF

A Study on Behavior Characteristics of Precast Coping Part under Axial Load (축하중을 받는 프리캐스트 코핑부의 거동 특성 연구)

  • Won, Deok-Hee;Lee, Dong-Jun;Kim, Seung-Jun;Kang, Young-Jong
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.3
    • /
    • pp.281-287
    • /
    • 2011
  • Recently, bridge construction technology has made great progress from development of high performance materials and new bridge types. However, most technology are based on methods of cast-in-place and material cost saving. The method of cast-in-place concrete causes environmental damages and costumer complaints. Especially, under bad weather conditions, the construction can not proceed. To overcome these disadvantages, new construction methods were developed to reduce construction time. These methods are called precast method. Most prefabricated methods have been applied to superstructure constructions of bridges, but very minutely applied to substructure constructions. The most important agendas on precast method are light weight and transportability of the precasted members, because very strict transporting specifications exist for road transportation of the precasted members. For example, the weight and length of coping members may be larger than the available transporting vehicles. Although column is constructed by precast method to save construction time, if coping member is constructed by cast-in-place method, then the column construction time reduction becomes meaningless. Therefore, in this study, a new precast coping member and a connecting system of column-coping member are proposed. The proposed method is verified by analyzing their ultimate performance through analysis and experimental study.