• 제목/요약/키워드: building supervision

검색결과 122건 처리시간 0.058초

지하주차장 슬래브 균열저감을 위한 수축저감 콘크리트 현장적용 사례 (Application of shrinkage-reduced concrete to mitigate cracks of slab in parking garages)

  • 서종해;이정호;이규식;전병갑;김준삼;이회근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.197-200
    • /
    • 2012
  • Concrete has cracks from shrinkage that necessarily result from in hardening process. Shrinkage-reduced concrete developed for crack reduction was utilized at a sample construction project. As a result, it is confirmed that crack initation ratio was remarkably reduced when compared to the case of normal concrete utilization. Additional sample project is supposed to use delay joints as well as srinkage-reduced concrete. Subsequently, the result will be reported. The greatest factor which affects in drying shrinkage is unit quantity of water. However, there are a lot off difficulties in field supervision because proper measuring means is not presented in present standard. Therfore, problems depending on ready-mixed concrete concrete companies should be improved by preparing the related standard assoon as possible.

  • PDF

국가 통합항공안전관리시스템 모형 구축에 관한 연구 (A Study on Model of the State's Aviation Safety Management System)

  • 박민규
    • 대한안전경영과학회지
    • /
    • 제13권2호
    • /
    • pp.1-8
    • /
    • 2011
  • The Chicago Convention in 1944 made important contributions to aviation safety improvement, building an aviation safety monitoring system for its signatory countries. As ICAO is now on the verge of changing its supervision system from self-reporting to preventive Continuous Monitoring Approach(CMA) in 2013, we also expect our own safety system to make a progress accordingly. The government is pushing ahead with plans to build an integrated safety management system at government level that satisfies international standards and reflects domestic features. To this end, this report proposes the most effective system-building model, by analyzing the current status of the system that is in use and meets the requirements of international aviation agencies.

타워크레인 텔레스코핑 작업의 안전리스크 대응방안 연구 (A Study on the Safety Risk of Telescoping Work of Tower Cranes)

  • 이동훈;최재휘;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.9-13
    • /
    • 2009
  • As recent construction projects are bigger and higher, the importance of lifting is increasing. In construction sites tower cranes are an essential lifting equipment covering were than 50% of all construction activities. But due to neglect of safety supervision, tower crane-related accidents are frequently taking place. Since most of construction activities is done in heights, the accidents are more likely to be catastrophic. According to an analysis of the causes of tower crane-related accidents, 49% of all accidents claimed for certain periods($1999{\sim}2003$) occurred in the process of telescoping work. Therefore, this research is conducted with the object of analyzing telescoping work of tower cranes and presenting solutions against safety risk. It is expected that the results of this study can be used as useful basic data or material when preparing for effective safety management for tower cranes.

  • PDF

건설공사 공종별 사고유형 및 사고객체 교차분석을 통한 중점안전관리항목 도출 (Derivation of Key Safety Management Factors by Construction Process through Cross-Tabulation Analysis between Accident Types and Objects)

  • 유나영;김하림;이찬우;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.127-128
    • /
    • 2022
  • The construction industry has a higher disaster rate than other industries, so safety education and management are highly important. In order to reduce the construction accident rate, it is necessary to study the key safety management factors reflecting the characteristics of the construction industry, where there are differences in processes and manpower input for each process, and a small number of managers. Therefore, in this study, key safety management factors for each Process of construction were derived through cross-analysis between safety accident types and accident occurrence objects through disaster case data. The extracted key safety management factors are expected to provide useful information for safety education and supervision of construction sites.

  • PDF

건축공사 감리업무의 체계성 강화를 위한 법제도 개선안 연구 (A Study on the Improvement of the Legal System for Digital Transformation of the Construction Inspection Works)

  • 김수나;김영진;이웅종;노영숙
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.375-376
    • /
    • 2023
  • In this study, the legal and institutional status of construction supervising and construction inspector was identified. As a result of examining the definitions of construction supervision terms, focusing on domestic construction-related laws, it was found that there were no consistency between each laws regarding 'terminology' and 'definitions'. In addition, the scope of construction inspector's work continues to expand through the delegation provisions to lower statutes, however, responsibility, authority, and inspection cost are not taken into account properly. In addition in order to introduce digital technology to the smart construction site, which is currently active under way, it is judged that the law and institutional contents need to be improved further.

  • PDF

다중이용업소 실내마감재료 사용기준에 관한 연구 (A Study on Using the Interior Finishing Material using Regulation at Multiple-using Businesses)

  • 김용성;조성오
    • 한국실내디자인학회논문집
    • /
    • 제22권5호
    • /
    • pp.216-224
    • /
    • 2013
  • There are the relevant provisions that apply to building regulations about the Building codes, Fire Protection laws, and more Multi-using interior finish materials businesses etc. The differences between these regulations are as follows: The Building codes is defined the main use of the building according to facilities to used to set the scale by the use of the floor space, On the other hand, Fire Protection laws are the basic purpose and the act of using the architectural space(or sales) by separating object by fire. And Multiple-using Businesses Facilities consist of two regulations engaged in the kind of law and the size of the floor area. One building can not be based on operating facilities and together in Multiple use businesses Law. As such, the Buildings are applied to the Building codes, Fire Protection laws, such as Multi-using Businesses Facilities interior construction industry due to the structural differences in the position of the designer feeling a lot of difficulties and confusion. The Multi-use businesses Facilities engage in the kind of law, the size of the floor area and seating capacity. These can not be based on operating facilities, and consists of two regulations together in one building. This study is purposed to help improving the finish of the interior architecture that is related to the Building code regulations, Fire Protection laws, Multi-using Facilities interior finishing material relevant with the provisions from the law through analyze the case of developed countries, and the current Multiple use Businesses Facilities research range from the law of multiple-using facilities, interior finishing, interior architecture for supervision reasonably and compensation for the interior design. So, Result is as follows: First, interior decorations can be separated the fixed material and the moveable things. second, It should be included multi-using Business though small size business space at the basement floor. third, It should be established statute law that design and construction responsibility. forth, re-testing fire resist performance after some period. and finally, it need to mitigate regulation where be installed sprinkler.

소방공사감리원의 업무수행능력이 아파트 소방시설공사의 완공검사에 미치는 영향 (The Effect of the Performance of Firefighting Construction Supervision Personnel on the Completion Inspection of Firefighting Facility Construction in Apartments)

  • 김상식;공하성
    • 문화기술의 융합
    • /
    • 제5권3호
    • /
    • pp.43-54
    • /
    • 2019
  • 이 연구는 아파트 화재의 대형화를 막기 위해 소방공사감리원의 업무수행능력에 따른 완공검사결과와 소방공사감리원의 성능시험 공기확보의 필요성에 따른 완공검사결과 및 완공검사증명서 발급 후 소방시설 등의 하자 유무상태에 따른 요인을 분석하여 완공검사 결과를 측정하여 소방공사감리원의 업무수행능력을 향상시키 위한 것이다. 연구의 결과를 요약하면 첫째, 소방공사감리원의 업무수행능력에 따라 아파트 완공검사결과에 영향을 미치는 것으로 직업별로 소방공무원보다 소방시설설계업 및 소방공사감리업 종사자가 소방공사감리원의 업무수행능력에 따라 아파트 완공검사 결과 정도는 유의하게 높게 나타났다. 그러므로 아파트에는 아파트 공사감리 경력이 있는 사람을 감리원으로 배치하여 소방공사감리원의 업무수행능력을 향상시킬 필요가 있다. 둘째, 소방공사감리원의 성능시험 공기확보 필요성에 대한 완공검사 결과는 직업별로 소방공무원보다 소방시설설계업 및 소방공사감리업 종사자의 성능시험에 대한 공기확보 필요성이 유의하게 높은 것으로 분석 되었다. 이를 개선하기 위해 건축 준공일까지 완공검사를 할 수 있도록 하며 발주처에서는 완공검사증명서를 건축준공일에 임박하여 발급받도록 강요하지 않도록 장치를 마련할 필요가 있다. 마지막으로, 완공검사증명서 발급 후 완공검사의 하자가 완공검사 결과에 영향을 미치는 것으로 발주자(건축주. 감독관) 종사자보다 소방시설설계업 및 소방공사감리업체 종사자가 유의하게 낮게 분석되었다. 이는 소방시설공사를 마치지 않은 상황에서 발주처. 건설사가 완공검사증명서의 발급을 요구함에 따라 완공검사증명서 발급 후 소방시설 등에 하자가 발생하여 완공검사 결과에 영향을 미친 것으로 분석된다.

의료시설 사업계획서의 건축사업비 산정에 관한 연구 (A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan)

  • 최광석
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제27권2호
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

AcciMap과 STAMP를 활용한 해체공사 붕괴사고 분석 (Analysis of Collapse Accidents in Demolition Work using AcciMap and STAMP)

  • 정현지;원정훈
    • 한국안전학회지
    • /
    • 제38권3호
    • /
    • pp.51-60
    • /
    • 2023
  • Investigation of the cause of the relatively recent building collapse accident in Gwangju revealed a lack of awareness about the safety of the dismantling construction system among stakeholders, in the form of issues such as illegal subcontracting, unauthorized design changes, and insufficient safety supervision. This study was conducted to analyze the safety interactions between the building dismantling construction system and the involved stakeholders and to propose ways to prevent accidents in related institutions and workplaces. AcciMap and STAMP-CAST analysis methods were used to evaluate safety interactions among the various stakeholders participating in building demolition work. Analysis results revealed that the collapse accident during the dismantling work was caused not only by structural causes occurring in the construction stage, but also by various causes throughout the system, such as the dismantling plan preparation stage and the construction permit stage. The results also revealed the need for proper implementation of safety control measures by various stakeholders to prevent collapse accidents during dismantling construction.

고령 건설기술자를 활용한 소규모공사의 공사관리방법 개선방안 (A Study on the Improving Management Method for the Small Projects applying Senior Construction Engineer)

  • 송진우;정용식;이상범
    • 한국건축시공학회지
    • /
    • 제5권2호
    • /
    • pp.115-121
    • /
    • 2005
  • The building below standard scales to be built only by constructive report to authorities. Construction law 8 illustrates that supervision should be deployed in all the construction sites at the building which is found to have more than 3 floors and also to have more than loom of total squares in especially outside area of city plan zone. Such a small construction is have a important and the most basic meaning. Many problems were found to occur in all the constructive places which were out of the limit of this law. The construction sites were found to be controlled by public official's visiting without supervisors and designers of architecture. Technique of construction in architecture was found to be not different from that of 1980. The security of employees in construction on sites has a serious problem. Because of choosing ail the materials of the building without a reasonable point. All the building were found to have a law material about inside and outside aspects. The purpose of this study are to examine existing law about a small project and than to analyze the situation of constructive control through questionnaires and interviews with all the supervisors. Based on the data base of engineers who had a great experience in construction sites, The purpose of this study is also to suggest and advise the method of controlling all the items in architecture through on and off line.