• Title/Summary/Keyword: building owner

Search Result 181, Processing Time 0.024 seconds

Analysis of Determinants on Residential Resettlement in Accordance with Urban Regeneration (도시재생에 따른 주거재정착 결정요인 분석)

  • Choi, Yeol;Yim, Ha Kyoung;Jang, Won Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.409-418
    • /
    • 2009
  • The aim of this study is to analyze the evaluations and determinants on residential resettlements in accordance with urban regeneration by 7,396 samples from 19 housing redevelopment districts in Busan. The major finding on determinants on residential resettlements in accordance with urban regeneration are as follows; A binary logit model for determinants on residential resettlements in accordance with urban regeneration are composed of owner's characteristics, land and building characteristics, housing complex characteristics, and location characteristics. The significant variables in relation to owner's characteristics are owner's age, owner's place of residence, the possession period against property and investment intention. As a result of logit model for residential resettlements, it shows that the variables in relation to land and building characteristics are the land classification, the use of building, the size of land or building, the permission of building and the appraisal price on land and building. This result means that actual customer's investment connects to resettlement after redevelopment project. The other side, the housing complex variables consist of the brand of construction company, the ratio of large size housing and floor are ratio shows that improvable conditions for housing value are important factor to induce residence's resettlement. The location variables show that Dongbusan has higher probability, the reverse Jungbusan has lower probability in residential resettlement likewise residential preference.

Study on the Quality Improvement through Analysis of the Cause of the Structure Design Drawing in the Internal Reinforced Concrete Structures

  • Kim, Byung-Yun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.76-86
    • /
    • 2014
  • The cause of crack on reinforced concrete structures is varied, while the studies, which have intended to analyze this in the material side, have been the mainstream so far. Therefore, in this study, we intended to suggest the proposals for enhancement of the system to reduce crack and to improve the quality of the reinforced concrete structures, by reviewing the cause of crack mainly in the structural aspect and analyzing the practices and the system. The result has been shown as following. (1) As one of the measures for improving the constructional system related to the structure, it is to enhance the relevant system so that design on construction, structure, and equipment, can be separately ordered or jointly ventured, and the owner or the agent of the owner can discuss and mediate the business in each specialized field. (2) Importance on construction supervision and new establishment of regulations related to structure supervision.

A Study on the Direction of the Warranty Contract in Constructions (건설공사 성능계약제도 도입방향에 관한 연구)

  • Kim, Hyun;Park, Sung-Yong;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.153-157
    • /
    • 2008
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. However, the interior of a country encounter another problem result from defects liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

BIM Application Process for Facility Condition Assessment Documentation Work

  • Yoo, Seung Eun;Yu, Jung Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.268-270
    • /
    • 2015
  • Overseas countries' government and facility management industries make efforts to ensure precise and fluent data from building information modeling (BIM). In facility management, a large amount of data and information are necessary to continue the process activities. Facility condition assessment, which is performed to make budget plan for the maintenance and operation requires the related facilities' documentation and information. However, it depends on the owner and the user of the facility to provide accurate and complete information to consultant. The problems as follows: (1) owner and user should provide documents and information, and (2) the consultant cannot verify the provided information. To solve these problems, we suggest a methodology to produce the information for FCA through BIM. First, all of the essential documentation and assessment elements are listed. Next, the documents and elements are separated out, whether they are able to be extracted from BIM or not. Then, the list indicates only the data that is linked with BIM. The suggestion is expected to provide the required information through the connection to BIM with accuracy and completeness and to present another BIM application use for facility management.

  • PDF

Survey on Building Owner's Awareness of Building Energy Load (건물주의 건축물 에너지 부하량 인식 조사)

  • Yeo, Chang-Jae;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.292-293
    • /
    • 2014
  • Many project (such ESCO or BRP) are being implemented for existing building energy saving. Most of medium or large building that use many energy being implemented this project. In the case of large or medium building must implement obligatorily Energy auditing. Therefore, They can be recognize their building energy consumption situation. But, In the case of small building don't need obligatorily energy auditing. Therefore, They can't be recognize their building energy consumption situation. As a result, Small buildings are difficult to participate in energy efficiency retrofit. In this research, Building owners of buildings energy load recognition and energy efficiency retrofit possible participation was analysis though survey. Survey results, Most building owners don't know building energy load. But they have a good mind to retrofit building energy efficiency. As a result, If they have energy load information, they will be participate energy efficiency retrofit.

  • PDF

A STUDY ON THE DEVELOPMENT OF A COST MODEL BASED ON THE OWNER'S DECISION MAKING AT THE EARLY STAGES OF A CONSTRUCTION PROJECT

  • Choong-Wan Koo;Sang H. Park;Joon-oh Seo;TaeHoon Hong;ChangTaek Hyun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.676-684
    • /
    • 2009
  • Decision making at the early stages of a construction project has a significant impact on the project, and various scenarios created based on the owner's requirements should be considered for the decision making. At the early stages of a construction project, the information regarding the project is usually limited and uncertain. As such, it is difficult to plan and manage the project (especially cost planning). Thus, in this study, a cost model that could be varied according to the owner's requirements was developed. The cost model that was developed in this study is based on the case-based reasoning (CBR) methodology. The model suggests cost estimation with the most similar historical case as a basis for the estimation. In this study, the optimization process was also conducted, using genetic algorithms that reflect the changes in the number of project characteristics and in the database in the model according to the owner's decision making. Two optimization parameters were established: (1) the minimum criteria for scoring attribute similarity (MCAS); and (2) the range of attribute weights (RAW). The cost model proposed in this study can help building owners and managers estimate the project budget at the business planning stage.

  • PDF

건물자동화장비(BAS)

  • 강인구;이봉훈
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.1
    • /
    • pp.48-54
    • /
    • 1983
  • Building management cost increases enormously as modern buildings become complicated. Lost of building eveners or managers feel the need to cut down the cost not sacrifying Comfort building environment and building safety, The ways to achieve such goal are maintaing with a few person, proper HVAC scheduling to save energy BAS's i.e the building automation system or building maintenance system, are designed to meet the goal. In korea, imported BAS's have been installed past several years. Difficulties arised in several aspects. One is extra high cost in installing BAS's because of marginal coat. Another is long settling time because it is originated from abroad. GSC/85/30 is the first trial as a korean BAS to minimize such difficulties. Even though it is a primitive system, it is a mileston of korean BAS the technics gained from developing GSCI/85/30 can be utilized to develop higher version and is now. As modern buildings become more complicated and hugy, managers owner of buildings seek for the system to manage building properly. BAS(Building Automation System or Building management system) is designed to meet the need.

  • PDF

Measures associated with the change of the lifetime of collateral responsibility of set building (집합건물의 담보책임 존속기간 변경에 따른 대응방안)

  • Jeon, Min Chang;Kim, Se Bum;Kim, Dae Young;Lee, Sang Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.238-239
    • /
    • 2015
  • set of building has to be amended by applying the provisions for matters relating to collateral responsibility to protect actively the owner of the induction of sets that were built to builder to rights and convenient improvement of set building, other laws are the same is applied to a set of building, for work of confusion is expected, in the present study, to understand the defect liability of recently revised set building method, and reasonable set of buildings through a comparative analysis of related laws by presenting the direction of defect liability is to be considered a countermeasure after presenting the effect of laws through survey.

  • PDF

Analysis of the Breakdown repair time of the Building Components in Public Rental-Housing Types (공공임대주택 유형별 부재의 사후보전 수선시기 설정연구)

  • Lee, KangHee;Ahn, YoungHan;Chae, ChangU
    • KIEAE Journal
    • /
    • v.13 no.6
    • /
    • pp.129-136
    • /
    • 2013
  • The rental housing has played a key role to supply a decent living space for the low-income households. The owner of the rental housing should maintain and manage the building physical condition. On the other hand, rents should use the housing without any damage and pay a certain fare for the rent. A rent is classified into two types : private and public. The public rent is mainly to supply a living space for non-available home owner with a low-rent fare. Many of public rent are built and supplied by the public institution or local government. The supplier would take a responsibility to maintain the building and components, reflected by the maintenance plan and repair scope. In this paper, it aimed at providing the repair time in building components of the public rental housing such as lighting, electrical cable, paintings and etc.. The repair time is analyzed with three calculation methods which are solved by the probability and empirical approach. Results are as follows : First, the repair time of the electrical facilities are maintained with 11yr, 10yr and 7 in permanent, public and redevelopment rent respectively. The roof proof has a repair time with 14yr, 11yr and 8 in permanent, public and redevelopment rent housing respectively. Second, Most of the components has a prior length of the repair time in permanent, public and redevelopment rent sequently. There is a difference in repair time according to the rental types. Therefore, it would continue to research the difference in aspect of the living style, building physics, living consciousness and etc.