• Title/Summary/Keyword: building modeling

Search Result 1,992, Processing Time 0.03 seconds

Geometric and structural assessment and reverse engineering of a steel-framed building using 3D laser scanning

  • Arum Jang;Sanggi Jeong;Hunhee Cho;Donghwi Jung;Young K. Ju;Ji-sang Kim;Donghyuk Jung
    • Computers and Concrete
    • /
    • v.33 no.5
    • /
    • pp.595-603
    • /
    • 2024
  • In the construction industry, there has been a surge in the implementation of high-tech equipment in recent years. Various technologies are being considered as potential solutions for future construction projects. Building information modeling (BIM), which utilizes advanced equipment, is a promising solution among these technologies. The need for safety inspection has also increased with the aging structures. Nevertheless, traditional safety inspection technology falls short of meeting this demand as it heavily relies on the subjective opinions of workers. This inadequacy highlights the need for advancements in existing maintenance technology. Research on building safety inspection using 3D laser scanners has notably increased. Laser scanners that use light detection and ranging (LiDAR) can quickly and accurately acquire producing information, which can be realized through reverse engineering by modeling point cloud data. This study introduces an innovative evaluation system for building safety using a 3D laser scanner. The system was used to assess the safety of an existing three-story building by implementing a reverse engineering technique. The 3D digital data are obtained from the scanner to detect defects and deflections in and outside the building and to create an as-built BIM. Subsequently, the as-built structural model of the building was generated using the reverse engineering approach and used for structural analysis. The acquired information, including deformations and dimensions, is compared with the expected values to evaluate the effectiveness of the proposed technique.

Methodology for Generating Information Requirements for BIM-based Building Permit Process (BIM 기반 인허가 요구정보 생성 방안)

  • Kim, Karam;Yu, Jungho;Kim, Inhan
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-10
    • /
    • 2015
  • Using BIM (Building Information Modeling)-based design information to analyze various engineering processes has been widely adopted in construction projects. However, since typical building permit processes often require traditional 2D-based design information for submission and to obtain building approval, there are some challenges in delivering such data thru BIM-based design information. This paper proposed a methodology to generate and meet information requirements for permit applications and approvals based on BIM-based design information. To that end, we analyzed the required information necessary to make submissions for building approvals using the Seumter system. We then suggested a process to collect the required information from BIM-based data, and classified this into two types: BIM-internal and BIM-external information requirements. In addition, we proposed three algorithms to extract and to match between extracted BIM data and BIM-internal information requirements using IFC(Industry Foundation Classes). The proposed methodology enables to ensure the efficiency and the accuracy when providing data for building permit review and approval.

Civil Infrastructure Information Modeling Method Based on Extended IFC Entities using BIM Authoring Software (BIM 소프트웨어를 활용한 토목 시설물 IFC 확장요소기반의 정보모델링 방안)

  • Lee, Sang-Ho;Park, Sang I.;Kwon, Tae-Ho;Seo, Kyung-Wan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.1
    • /
    • pp.77-86
    • /
    • 2017
  • Industry Foundation Classes(IFC) is the core product schema for ensuring the interoperability of information in Building Information Modeling(BIM) environment. However, since current IFC is mainly focused on building structure. there are limitations in the generation of functional information of components when applied to civil infrastructures. Previous studies have proposed IFC-based new entities for the civil infrastructures, it takes long time to support them in BIM authoring software packages. In this study, we proposed practical rules to apply IFC-based information modeling using BIM authoring software and additional new entities for the civil infrastructure through attributes and information mapping. The availabilities of proposed method were examined using the rail and sleeper information models based on an extended IFC data schema for the railway infrastructures.

A Study on the Building Information Modeling Collaboration Strategy for Railway Infrastructure - Case Study and Survey - (철도 인프라 BIM 협업 전략에 관한 연구 - 싱가포르 사례 및 국내 전문가 설문조사를 기반으로 -)

  • Kim, Seong-Ah;Kim, Jin-Man;Shin, Min-Ho
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.116-127
    • /
    • 2022
  • Building Information Modeling, which was applied mainly in the construction sector, is expanding to the road sector, and the government recently recommends preparing individual application guidelines considering the characteristics of detailed fields such as railways, ports, and complexes through BIM implementation guidelines. Compared to general construction projects, a lot of the works such as signals, electricity, and power, and the railway BIM 2030 roadmap has been presented to apply BIM to railway construction projects that require business consultation and work environment review with various local governments, and pilot projects are in operation. Unlike a general building, in which the construction begins after the detailed design is completed, in the railway project, the detailed design of other works proceeds along with the roadbed construction. Because construction and design work together, railways need to coordinate detailed engineering interfaces such as trajectories, signals, and power, and the application of BIM in design interface coordination has the advantage of maximizing the effectiveness of pre-review. Overseas railway construction projects actively used BIM to adjust design interfaces and had a collaboration process to modify BIM models and create construction details from the revised models through regular meetings with suppliers. Therefore, this study aims to derive the factors necessary for establishing a BIM collaboration environment based on a survey of practitioners as a preliminary step for establishing the BIM collaboration process of the railway construction project.

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

BIM-DRIVEN ENERGY ANALYSIS FOR ZERO NET ENERGY TEST HOME (ZNETH)

  • Yong K. Cho;Thaddaeus A. Bode;Sultan Alaskar
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.276-284
    • /
    • 2009
  • As an on-going research project, Zero Net Energy Test Home (ZNETH) project investigates effective approaches to achieve whole-house environmental and energy goals. The main research objectives are (1) to identify energy saving solutions for designs, materials, and construction methods for the ZNETH house and (2) to verify whether ZNETH house can produce more energy than the house uses by utilizing Building Information Modeling (BIM) and energy analysis tools. The initial project analysis is conducted using building information modeling (BIM) and energy analysis tools. The BIM-driven research approach incorporates architectural and construction engineering methods for improving whole-building performance while minimizing increases in overall building cost. This paper discusses about advantages/disadvantages of using BIM integrated energy analysis, related interoperability issues between BIM software and energy analysis software, and results of energy analysis for ZNETH. Although this investigation is in its early stage, several dramatic outcomes have already been observed. Utilizing BIM for energy analysis is an obvious benefit because of the ease by which the 3D model is transferred, and the speed that an energy model can be analyzed and interpreted to improve design. The research will continue to use the ZNETH project as a testing bed for the integration of sustainable design into the BIM process.

  • PDF

Developing and Valuating 3D Building Models Based on Multi Sensor Data (LiDAR, Digital Image and Digital Map) (멀티센서 데이터를 이용한 건물의 3차원 모델링 기법 개발 및 평가)

  • Wie, Gwang-Jae;Kim, Eun-Young;Yun, Hong-Sic;Kang, In-Gu
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.25 no.1
    • /
    • pp.19-30
    • /
    • 2007
  • Modeling 3D buildings is an essential process to revive the real world into a computer. There are two ways to create a 3D building model. The first method is to use the building layer of 1:1000 digital maps based on high density point data gained from airborne laser surveying. The second method is to use LiDAR point data with digital images achieved with LiDAR. In this research we tested one sheet area of 1:1000 digital map with both methods to process a 3D building model. We have developed a process, analyzed quantitatively and evaluated the efficiency, accuracy, and reality. The resulted differed depending on the buildings shape. The first method was effective on simple buildings, and the second method was effective on complicated buildings. Also, we evaluated the accuracy of the produced model. Comparing the 3D building based on LiDAR data and digital image with digital maps, the horizontal accuracy was within ${\pm}50cm$. From the above we derived a conclusion that 3D building modeling is more effective when it is based on LiDAR data and digital maps. Using produced 3D building modeling data, we will be utilized as digital contents in various fields like 3D GIS, U-City, telematics, navigation, virtual reality and games etc.

Attribute Data Management for Developing the Database of a 3D Earthwork BIM System (3D 토공 BIM 시스템 데이터베이스 구축을 위한 속성 데이터 관리)

  • Moon, Sungwoo;Seo, Jongwon
    • Journal of KIBIM
    • /
    • v.6 no.4
    • /
    • pp.27-34
    • /
    • 2016
  • A Building Information Model (BIM) is an attempt to simulate the process of building structures in a three-dimensional (3D) digital space. While the technology is usually applied to structured buildings, bridges, and underground facilities, it is rarely applied to an unstructured environment of earthwork operations. If a BIM is used for earthworks, the 3D simulation can be used for construction equipment guidance and earthwork management. This paper presents a real-time, 3D earthwork BIM that provides a 3D graphical simulation of excavators in conjunction with geographic modeling. Developing a real-time, 3D earthwork BIM requires handling a variety of factors, such as geographical information and vehicular movement. This paper mainly focuses on the management of these attributes and provides a database design for storing and retrieving data. In an example application, a prototype of the 3D earthwork BIM is presented to understand what it would provide when used during earthwork operations at a construction site.

Level of Detail (LOD) for Building Energy Conservation Measures (ECMs) (건물 에너지 절감조치의 시뮬레이션 모델링 상세수준)

  • Kim, Sean Hay
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.69-80
    • /
    • 2015
  • Purpose: Since most simulation programs take the interface that lists up all the input variables representing all the functionalities, users must know where design variables of an Energy Conservation Measure (ECM) are located and also know what values are appropriate. This is why practitioner designers feel frustrated when they attempt to use simulation. The final objective of this study is to provide a building energy modeling guideline for practitioners in various fields such as architectural design and MEP. Method: As the first step of the modeling guideline, this study provides the Level of Detail (LOD) for simulation modeling of primary ECMs considering the design information available in each design phase. It is prepared by literature review, simulation functionality investigation, and field experts' survey. Result: The proposed simulation LOD offers a milestone at each design phases concerning what design variable and attributes need to be developed with how much of details in order to meet the project goal. Also each design team can set up a simulation usecase considering organizational characteristics based on the proposed LOD.

A Study on the Application of BIM-enabled Interior Panel Design by the control of Parametric Objects and their Properties (객체 및 속성정보 제어를 이용한 BIM기반 파라메트릭 인테리어 패널 디자인 접근방법)

  • Kim, Hayan;Lee, Jin-Kook
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.6
    • /
    • pp.70-78
    • /
    • 2016
  • This paper aims to describe a case study of parametric interior design based on BIM (Building Information Modeling). As the practical use of BIM-based design grows, its influence expands into the field of interior architecture design. BIM makes possible to check various design plan, reach decision making in an effective way, and change design plan in an efficient method. Therefore, BIM is also promising field in interior architecture design. However, compared to other fields in architecture, engineering, and construction (AEC) industry, there have been less research and projects on BIM in the field of interior architecture. For increasing the feasibility of adapting BIM in interior architecture design, this paper describes a case study-projecting images for designing interior panels using parametric modeling. This process needs elaborate, delicate, and precise steps for harmonious output. For continuous use of building, users look forward to the design which variable and changeable according to user's preference and environment. Therefore, demand for parametric design in the interior design part such as panel pattern design for various decoration is growing. Treated process in this paper deals with an advanced phase which much effective in decreasing time consumption and useless part of process. Finally, this paper suggests the possibility of using BIM in the interior design process and field where BIM can be applied.