• Title/Summary/Keyword: building construction field

Search Result 1,235, Processing Time 0.029 seconds

Test and Field Application Analysis for Root Barrier using Aluminum Film Adhered to PVC and Waterproofing using E.P Sheet with Asphalt Membrane for Green Roof System (PVC 및 알루미늄을 진공 접착한 방근시트와 E.P시트 및 도막방수층을 부분 절연한 방수/방근 복합공법의 옥상녹화 적용성 평가에 관한 실험적 연구)

  • Oh, Sang-Keun;Kwon, Si-Won;Park, Jin-Sang;Park, Sang-Chan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.71-74
    • /
    • 2006
  • The introduction of materials and methods of construction which are appropriated to property of green roofs could be a decisive factor in a long-range durability and economical maintenance cost, moreover, it support to variety construction system and organization. In this paper I focused to assure the basic system for waterproofing materials and root barrier apply to green roof as searching the application of field condition. And I suggest proper waterproofing and root barrier as considering the mutual connection and plant growth. and it can be a standard model to adopt to domestic green roof system.

  • PDF

A Self-control Safety Management Activity Model in Construction Sites through Analysis of Success Factors (건설현장 안전관리 성공요인 분석을 통한 자율안전관리활동 개선에 관한 연구)

  • Lee, Joo-Sung;Hong, Jung-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.109-117
    • /
    • 2008
  • Recently, there has been constituted the government regulations and the normative methods to control the safety management activities in construction fields, but almost of these regulations are ineffective, because of some characteristics safety management have. The needs of the times make government regulations and the normative methods change to autonomic management methods. In this context, it is significant certainly to improve the standard of safety management that is used as a tool to protect the workers from the accidents or industrial disasters in the construction field. In this research, it will be showed that the outside regulations and safety management systems of the head office have their limits to reflect the safety managements of field participants. Then, it will be presented the improved model of self-control safety management activities which is essential for success safety management.

Hydration Heat and Strength Properties of Mass Concrete Transfer Girder (고강도 매스 콘크리트-보의 수화열 및 강도특성)

  • Kang, Yeon-Woo;Kim, Gyu-Yong;Kim, Soon-Mook;Kim, Soo-Bong;Han, Jang-Hun;Jung, Jae-Yung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.28-29
    • /
    • 2013
  • When concrete was hardened, it should had considered a crack to make internal stress by hydration heat. For control of crack, admixture was use to change cement because hydration heat was effect to cement. High strength mass concrete had much hydration heat with high volume of cement. It was necessary to reduce hydration heat in construction method. In this study, it evaluates hydration heat, compressive strength of transfer concrete girder regard to field construction type such as separation, whole etc. Also, we test compressive strength of concrete with core and mold specimen.

  • PDF

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

Towards Instant Availability and Full Life Cycle Resilience in Vertical Cities: Automated Deployment and Transformation of High-Rise Buildings to Mitigate Social Challenges

  • Thomas Bock;Rongbo Hu
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.75-86
    • /
    • 2022
  • High-rise buildings often can accommodate the population of small horizontal cities. The investment in high-rise buildings is considerable and therefore a rapid return on investment is necessary. The immediate availability of high-rise buildings can be achieved by automated prefabrication of highly finished modules and their instant on-site assembly by robotic and automated construction sites. A high-rise building as a vertical city can be considered as a sophisticated organism that can constantly change throughout its lifecycle in response to economic growth, demographic change, and environmental pressures. To date, many new urban high-rise developments claim to be "vertical cities", yet few represent this important characteristic. This article analyzed the technological readiness and innovations in the field of construction automation and robotics including single-task construction robots, automated on-site construction factories, and ambient assisted living. These technological advances enable the realization of future vertical cities that are able to continuously grow and transform in terms of form and function. Finally, the article proposes a visionary archetype of vertical city in the name of "dynamic vertical urbanism" that is easy to expand vertically and horizontally in order to achieve instant availability and full life cycle resilience thanks to advanced building technologies.

Improvement method of process management on new han-ok style public building project (신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 -)

  • Seo, Jung-Seung;Kim, Young-Hoon;Kwak, Dong-Yeob
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

Field Application Assessment of Alkali-Activated Slag-Red Mud Soil Mixed Pavement (알칼리활성화 슬래그-레드머드 흙포장재의 현장 적용평가)

  • Kang, Hye Ju;Hwang, Byuong Il;Kim, Jae Hwan;Kang, Suk Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.107-108
    • /
    • 2017
  • In this search, by evaluating the field applicability of soil mixed pavement of Red mud is mixed into the soil mixed pavement field applicability, and tries to present the basic data about the site application of recycling of red mud and low carbon construction material to. As a result, the conventional soil concrete organization standards (SPS-KSCICO-001: 2003) meets the criteria for parking lot, making use of red mud, natural color as well as the natural loess is expressed.

  • PDF

A Study on Improvement of the Quality Management for Fire Doors (방화문의 현장품질관리 개선방안에 관한 연구)

  • Choi, Dong-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.93-94
    • /
    • 2019
  • When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. In order to improve the on-site quality management of the fire door, we comprehensively classify the quality management items of the fire door according to the management subject and the step by stage and set the field quality management procedure, the field quality management inspection item, regulations and standardized checklists were presented.

  • PDF

The Study On The Actual Condition Of Rebar Work In Korean Building Construction (국내 건설 현장의 철근공사 실태조사에 관한 연구)

  • 이응균;박우열;강경인
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.133-138
    • /
    • 2002
  • Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.

  • PDF

Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS. (WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구)

  • Ahn, Jae-Hong;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF