• 제목/요약/키워드: bridge construction

검색결과 1,913건 처리시간 0.026초

Seismic performance assessment of reinforced concrete bridge piers supported by laminated rubber bearings

  • Kim, T.H.;Kim, Y.J.;Shin, H.M.
    • Structural Engineering and Mechanics
    • /
    • 제29권3호
    • /
    • pp.259-278
    • /
    • 2008
  • This paper presents a nonlinear finite element procedure accounting for the effects of geometric as well as material nonlinearities for reinforced concrete bridge piers supported by laminated rubber bearings. Reinforced concrete bridge piers supported by laminated rubber bearings and carrying a cyclic load were analyzed by using a special purpose, nonlinear finite element program, RCAHEST. For reinforced concrete, the proposed robust nonlinear material model captures the salient response characteristics of the bridge piers under cyclic loading conditions and addresses with the influence of geometric nonlinearity on post-peak response of the bridge piers by transformations between local and global systems. Seismic isolator element to predict the behaviors of laminated rubber bearings is also developed. The seismic performance of reinforced concrete bridge piers supported by laminated rubber bearings is assessed analytically. The results show good correlation between the experimental findings and numerical predictions, and demonstrate the reliability and robustness of the proposed analytical model. Additionally, the studies and discussions presented in this investigation provide an insight into the key behavioral aspects of reinforced concrete bridge piers supported by laminated rubber bearings.

거가대교 케이슨기초 그라우트 충전 사례연구 (A Case Study on Caisson Foundation Grouting in Geo-Ga Bridge)

  • 배경태;차경섭;김영진;박충환;정경환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1046-1050
    • /
    • 2010
  • During construction of a sea-crossing bridge grouting was used to fill densely the space between the bottom of caisson and the ground. This grout mixture was mixed with an anti-washout admixture after locating accurately the pre-cast caisson on three concrete landing pads. This method differs significantly from the costly conventional method, for bridge foundations offshore, where concrete is placed in situ after excavating inside of a temporary concrete coffering wall. To verify the grouting method in advance, the full-scale field tests were performed twice on land. After identifying the fluidity of the grout material to be filled, finding some possible problems with the main construction and revising the original design, the main construction has been continuing successfully with 20 caissons completed to date. The purpose of this paper is to introduce for the first time in Korea the grouting method including the automatic and the manual monitoring system based on the main construction of the caisson foundation.

  • PDF

변단면 압출 추진코와 ILM교량 상부구조와의 상호작용 (Nose-Deck Interaction in ILM Bridge Proceeding with Tapered Sectional Launching Nose)

  • 안태욱;김광양;이환우
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2004년도 봄 학술발표회 논문집
    • /
    • pp.455-462
    • /
    • 2004
  • The ILM(incremental launching method) bridge, which is one of PS(prestressed) concrete bridge construction methods is widely adopted in Korea owing to its effectiveness for the quality control in construction. The purpose of this study is to analyze the structural behavior of ILM bridge proceeding with tapered sectional launching nose. This study presents basic technical materials to achieve the optimum design for superstructure and launching nose of ILM bridge. First this study introduces an equation to analyze the interaction between launching nose and superstructure. In this process, relative length, weight, and flexural stiffness between launching nose and superstructure are considered as investigating parameters. Second, the effects of superstructure resulting from these parameters is estimated analyzed by using the induced equations.

  • PDF

물량저감 철근상세를 갖는 중공 철근콘크리트 교각 시스템: I. 개발 및 검증 (Hollow Reinforced Concrete Bridge Column Systems with Reinforcement Details for Material Quantity Reduction: I. Development and Verification)

  • 김태훈;이재훈;신현목
    • 한국지진공학회논문집
    • /
    • 제18권1호
    • /
    • pp.1-8
    • /
    • 2014
  • The purpose of this study was to investigate the performance of hollow reinforced concrete bridge column systems with reinforcement details for material quantity reduction. The proposed reinforcement details have economic feasibility and rationality and make construction periods shorter. A model of hollow reinforced concrete bridge columns was tested under a constant axial load and a quasi-static cyclically reversed horizontal load. As a result, proposed reinforcement details for material quantity reduction were equal to existing reinforcement details in terms of required performance. The companion paper presents the experimental and analytical study for the performance assessment of hollow reinforced concrete bridge column systems with reinforcement details for material quantity reduction.

3차원 모델 기반의 미적 교각 설계 및 시공 기술 개발 (Development of Creative Design and Construction Methods of Bridge Piers using 3D Model)

  • 이상용;당고손;심창수
    • 한국BIM학회 논문집
    • /
    • 제5권2호
    • /
    • pp.12-18
    • /
    • 2015
  • Bridge piers typically have circular or rectangular shapes without decorative design. Prefabrication for accelerated construction has been widely adopted in bridge structures. Cost for steel formwork is a main restriction of creative irregular shapes. 3D modelling techniques allow creative design of columns and 3D printing provides possibility to minimize the fabrication cost. In this paper, 3D design process of bridge piers was suggested by converting 2D picture into 3D decorative shape. Formwork design using 3D printed panels was also proposed and mock-up tests were conducted. Precast columns need accurate geometry control from fabrication to assembly. Laser scanning and geometry control devices were adopted. Through the digitalized process of design, fabrication and assembly, creative design of structures can be realized in reasonable cost range.

교량의 피로강도를 고려한 맞대기용접부 불안전용입 한계결함 결정에 관한 연구 (An Experimental Study on Allowable Size of Incomplete Penetration in Butt Joint Bridge Weld Considering Fatigue Strength)

  • 백영남;장영권
    • Journal of Welding and Joining
    • /
    • 제18권3호
    • /
    • pp.68-75
    • /
    • 2000
  • The incomplete penetration(IP) discontinuity in butt joint weld, which is detected during safety analysis of the steel bridge by nondestructive evaluation(NDE) method, is classified as unacceptable defect according to the NDE codes and standards. In fact, there are a little allowance in butt joint weld in the view point of design criterion, and also detected IP discontinuity should be classified and evaluated for the fatigue strength and residual life estimation. In this study, we performed fatigue test to evaluate the fatigue strength of high strength steel(SWS490A) containing IP discontinuities in various size, the results compared and classified according to the bridge construction standard specification which published by korea administration of construction and traffic. Experimental results could be used to evaluate and estimate the IP discontinuities considering different stress range in butt joint bridge weld during periodic safety inspection.

  • PDF

Seismic performance of a rocking bridge pier substructure with frictional hinge dampers

  • Cheng, Chin-Tung;Chen, Fu-Lin
    • Smart Structures and Systems
    • /
    • 제14권4호
    • /
    • pp.501-516
    • /
    • 2014
  • The rocking pier system (RPS) allows the columns to rock on beam or foundation surfaces during the attacks of a strong earthquake. Literatures have proved that seismic energy dissipated by the RPS through the column impact is limited. To enhance the energy dissipation capacity of a RPS bridge substructure, frictional hinge dampers (FHDs) were installed and evaluated by shaking table tests. The supplemental FHDs consist of two brass plates sandwiched by three steel plates. The strategy of self-centering design is to isolate the seismic energy by RPS at the columns and then dissipate the energy by FHDs at the bridge deck. Component tests of FHD were first conducted to verify the friction coefficient and dynamic characteristic of the FHDs. In total, 32 shaking table tests were conducted to investigate parameters such as wave forms of the earthquake (El Centro 1940 and Kobe 1995) and normal forces applied on the friction dampers. An analytical model was also proposed to compare with the tested damping of the bridge sub-structure with or without FHDs.

LMC 교면포장공법의 국내 도입 방안 (Strategy of LMC Application at Bridge Overlay in Korea)

  • 김기헌;윤경구;박상일;홍창우;이주형
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2000년도 가을 학술발표회 논문집(II)
    • /
    • pp.1063-1068
    • /
    • 2000
  • Latex modified concrete (LMC) has grown to be accepted as a standard material of construction overlaying bridge decks in America due to its superior physical and chemical properties. The properties of latex, combined with the low water-cement ratio, produce a concrete that has improved flexural, tensile, and bond strength, lower modulus of elasticity, increased freeze-thaw resistance, and reduced permeability compared to conventional concrete of similar mix design. LMC overlays have been service in excellence for 30 years on thousands of bridge in U.S.A. This may, also, prolong the life cycle of bridge deck once it is adopted in Korea. The self-contained, mobile, continuous mixer is most appropriate particularly for concrete quality assurance. Assuring quality on a bridge deck overlay project should begin in the design phase and continue after the construction is completed. Quality should be the concern of everyone involved-owner, designer, and contractor.

승용차 전용 조립식 고가도로의 내진설계 연구 (Seismic Design of Prefabricated Light Weight Bridges)

  • 강형택;박영하;김성훈;이일근
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2003년도 추계 학술발표회논문집
    • /
    • pp.288-294
    • /
    • 2003
  • Increasing the volume of traffic on the roads causes social and economical problems such as increasing air-pollution and distribution cost. Prefabricated light weight bridge becomes a possible solution for these problems in the urban area where it is difficult to construct new one or expend the existing road. There are some merits in this kind of bridge. First, the design live and dead loads are minimized by allowing only passenger cars. Second employing prefabrication construction scheme reduces the construction time. Third, there is no need to buy land if the elevation road is placed on the top of existing one. In seismic design of bridges, base isolation has been an effective solution when the bridge has stiff piers and a heavy superstructure. The prefabricated light weight bridge has different dynamic characteristics from the ordinary bridges. In this paper, the applicability of base isolators such as lead rubber bearing and elastomeric bearing, to prefabricated light weight bridge is examined.

  • PDF