• Title/Summary/Keyword: brace

Search Result 441, Processing Time 0.026 seconds

Seismic Performance of Precast Infill Walls with Strain-Hardening Cementitious Composites (변형경화형 시멘트 복합체를 사용한 프리캐스트 끼움벽의 내진성능)

  • Kim, Sun-Woo;Yun, Hyun-Do;Jang, Gwang-Soo;Yun, Yeo-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.3
    • /
    • pp.327-335
    • /
    • 2009
  • In the seismic region, non-ductile structures often form soft story and exhibit brittle collapse. However, structure demolition and new structure construction strategies have serious problems, as construction waste, environmental pollution and popular complain. And these methods can be uneconomical. Therefore, to satisfy seismic performance, so many seismic retrofit methods have been investigated. There are some retrofit methods as infill walls, steel brace, continuous walls, buttress, wing walls, jacketing of column or beam. Among them, the infilled frames exhibit complex behavior as follows: flexible frames experiment large deflection and rotations at the joints, and infilled shear walls fail mainly in shear at relatively small displacements. Therefore, the combined action of the composite system differs significantly from that of the frame or wall alone. Purpose of research is evaluation on the seismic performance of infill walls, and improvement concept of this paper is use of SHCCs (strain-hardening cementitious composites) to absorb damage energy effectively. The experimental investigation consisted of cyclic loading tests on 1/3-scale models of infill walls. The experimental results, as expected, show that the multiple crack pattern, strength, and energy dissipation capacity are superior for SHCC infill wall due to bridging of fibers and stress redistribution in cement matrix.

Design of Flat Plate Systems Using the Modified Equivalent Frame Method (수정된 등가골조법을 이용한 플랫플레이트 시스템의 설계)

  • Park, Young-Mi;Oh, Seung-Yong;Han, Sang-Whan
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.1
    • /
    • pp.35-41
    • /
    • 2008
  • In general, flat plate systems have been used as a gravity load resisting system (GLRS) in building. Thus, this system should be constructed with lateral force resisting system (LFRS) such as shear walls and brace frames. GLRS should retain the ability to undergo the lateral drift associated with the LFRS without loss of gravity load carrying capacity. And flat plate system can be designed LFRS as ordinary moment frame with the special details. Thus, flat plate system designed as GLRS or LFRS should be considered internal forces (e.g., unbalanced moments) and lateral deformation generated in vicinity of slab joints render the system more susceptible to punching shear. ACI 318 (2005) allows the direct design method, equivalent frame method under gravity loads and allows the finite-element models, effective beam width models, and equivalent frame models under lateral loads. These analysis methods can produce widely different result, and each has advantage and disadvantages. Thus, it is sometimes difficult for a designer to select an appropriate analysis method and interpret the results for design purposes. This study is to help designer selecting analysis method for flat plate system and to verify practicality of the modified equivalent frame method under lateral loads. This study compared internal force and drift obtained from frame methods with those obtained from finite element method under gravity and lateral loads. For this purposes, 7 story building is considered. Also, the accuracy of these models is verified by comparing analysis results using frame methods with published experimental results of NRC slab.

Reversed Lateral Load Tests on RC Frames Retrofitted with BRB and FRP (좌굴방지가새와 FRP로 보강된 RC골조의 반복 횡하중 실험)

  • Lee, Han-Seon;Lee, Kyung-Bo;Hwang, Seong-Jun;Cho, Chang-Seok
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.5
    • /
    • pp.683-692
    • /
    • 2011
  • In piloti-type low-rise RC residential buildings, severe damages have been usually concentrated at piloti stories under the earthquake. In this study, a piloti story was retrofitted by installation of buckling-restrained braces (BRB's) to increase strength and stiffness of piloti story and by application of fiber reinforced polymer (FRP) sheet on columns to avoid the brittle shear and axial failure of columns. To verify this retrofit performance, reversed cyclic lateral load tests were performed on 1:5 scale bare and retrofitted frames. The test results showed that yield strength (43.2 kN) appeared to be significantly larger than design value (30 kN) due to the increase of strength in the compression side, but the stiffness value (11.6 kN/mm) turned out to be approximately one-half of the design value (24.2 kN/mm). The reasons for this difference in stiffness were due to slippage at joint between the frame and the BRB's, displacement and rotation at footing. The energy absorption capacity of the retrofitted frame was 7.5 times larger than that of the bare frame. The change of the number of load cells under the footing from 2 to 1 reduced lateral stiffness from 11.6 kN/mm to 6 kN/mm, which was only three times larger than that of the bare frame (2.1 kN/mm).

Arthroscopic ACL Reconstruction Using Quadrupled Hamstring Tendon with Tibial Remnant-preserving Technique (슬괵건을 이용하여 경골부 잔류 조직을 보존한 관절경적 전방십자인대 재건술)

  • Kyung, Hee-Soo;Oh, Chang-Wug;Kim, Poong-Taek;Lee, Byung-Woo
    • Journal of Korean Orthopaedic Sports Medicine
    • /
    • v.6 no.2
    • /
    • pp.92-98
    • /
    • 2007
  • Purpose: We evaluated the clinical results of arthroscopic ACL reconstruction using quadrupled hamstring tendon with tibial remnant-preserving technique. Materials and Methods: Thirty-five cases were evaluated from Feb, 2003 to May, 2006. The average interval from injury to surgery was $2.6{\pm}1.6$ months. The cause of injury was mostly sports-related trauma. The average follow-up period was 17 months. Tibial remnant was preserved as much as possible and caution was taken not to damage the remnant during ACL reconstruction. Postoperative rehabilitation was the same as the usual rehabilitation method after ACL reconstruction, except for delaying motion for 2 weeks with an extension locking brace. Clinical evaluation was performed using ROM; Lachman test; pivot-shift test; anterior displacement measurement using KT-2000 arthrometer; Lysholm score and proprioception measured by single limb standing test. Results: There was no limitation of knee motion without contracture. The Lachman test and pivot-shift test were both negative. The side-to-side difference of anterior displacement measured using KT-2000 arthrometer was improved from 6.7 mm to 2.2 mm. The average Lysholm score improved from 81 to 96. The single limb standing test for proprioceptive evaluation showed no significant difference from a normal leg. Conclusion: ACL reconstruction with tibial remnant-preserving technique can preserve mechanoreceptors with prorioception and expect good functional recovery.

  • PDF

Studies on Characteristics of Ostrich Egg Shell and Optimal Ashing Conditions for Preparation of Calcium Lactate (타조알 껍질의 성분특성 및 젖산칼슘 제초를 위한 최적 회화조건 검토)

  • 고민경;노홍균
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.31 no.2
    • /
    • pp.236-240
    • /
    • 2002
  • Characteristics of ostrich egg shell and optimal ashing conditions for preparation of calcium lactate were investigated. Average weight, girth, and length of ostrich egg shell with membrane (OESM) were 255.17 g, 39.50 cm, and 15.20 cm, respectively. Ostrich egg shell without membrane (OES) contained 0.35% moisture, 40.98% Ca as a maior mineral, 2.43% protein, and 235.0 mg/100 g of amino acids. Optimal ashing times for preparation of white-colored ashing powder from OES were 12 hr at $700^{\circ}C$, 80 min at 80$0^{\circ}C$, and 15 min at 90$0^{\circ}C$, respectively. These ashing conditions resulted in ashing powder with yields of 54.5~54.6% and color values of 97.26 ~97.51 for $L^{*}$, -0.30~-0.34 for $a^{*}$, and 0.63~0.98 for $b^{*}$. Ashing powders, from three different particle size ranges of OES, did not show significant differences in yield.eld.d.

A Study on the Quantitative Risk Assessment of Bridge Construction Projects (교량 공사 프로젝트의 정량적 리스크 평가에 관한 연구)

  • Ahn, Sung-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.1
    • /
    • pp.83-91
    • /
    • 2020
  • The recent bridge construction projects is demanded more sophisticated risk management measures and loss forecasts to brace for risk losses from an increase in the trend of bridge construction. This study aims to analyze the risk factors that caused the loss of material in actual bridge construction and to develop a quantified predictive loss model, based on the past record of insurance payment by major domestic insurance companies for bridge construction projects. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, i.e., the ratio of insurance payout divided by the total project cost, while the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: typhoon and flood 3) Project information: construction period and total project cost. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses. The results of this study can provide government agencies, bridge construction design and construction and insurance companies with the quantitative damage prediction and risk assessment services, using risk indicators and loss prediction functions derived from the findings of this study and can be used as a guideline for future basic bridge risk assessment development research.

Structural Capacity Evaluation of System Scaffolding using X-Type Advanced Guardrail (교차가새형 선행 안전난간을 적용한 시스템비계의 구조 성능 평가)

  • Park, J.D.;Lee, H.S.;Shin, W.S.;Kwon, Y.J.;Park, S.E.;Yang, S.S.;Jung, K.
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.49-58
    • /
    • 2020
  • In domestic construction sites, when installing steel pipe scaffolding and system scaffolding, the guardrails are installed after the installation of the work platforms. This conventional guardrail system (CGS) is always exposed to the risk of falls because the safety railing is installed later. In order to prevent fall disasters during erecting and dismantling scaffolds, it is necessary to introduce the advanced guardrail system (AGS) which installs railings in advance of climbing onto a work platform. For the introduction of the AGS, the structural performance of the system scaffolding applying the CGS and the AGS was compared and evaluated. The structural analysis of the system scaffold (height: 31 m and width: 27.4 m) with AGS confirmed that structural safety was ensured because the maximum stress of each element of the system scaffolding satisfies the allowable stress of each element. As a result of performance comparison of CGS and AGS for each element, the combined stress ratio of vertical posts in AGS was 6.4% lower than that of CGS. In addition, in the case of ledger and transom, the combined stress ratios of AGS and CGS were almost the same. The compression test of the assembled system scaffolding (three-storied, 1 bay) showed that the AGS had better performance than the CGS by 9.7% (8.91 kN). The cross bracing exceeds the limit on slenderness ratio of codes for structural steel design. But the safety factor for the compressive load of the cross bracing was evaluated as meeting the design criteria by securing 3 or more. In actual experiments, it was confirmed that brace buckling did not occur even though the overall scaffold was buckled. Therefore, in the case of temporary structures, it was proposed to revise the standards for limiting on slenderness ratio of secondary or auxiliary elements to recommendations. This study can be used as basic data for the introduction of AGS for installing guardrails in advance at domestic construction sites.

Analysis of Treatment Period on the Intraoral Removable Appliance Utilizing Vertical Facial Growth on Class III Malocclusion (얼굴의 수직성장을 이용하여 III급 부정교합을 치료하는 구강내 가철식 장치의 치료기간분석)

  • Song, Jihyeo;Kim, Seong-Oh;Song, Je Seon;Lee, Jaeho;Choi, Hyung-jun
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.46 no.2
    • /
    • pp.173-182
    • /
    • 2019
  • Vertical facial growth triggers the rotation of mandible to move the chin point to the downward and backward direction, which showed remarkably effective result making the less prominent chin. Recently, the intraoral removable appliance utilizing class III elastic demonstrated the vertical growth trigger mechanism. The treatment change was very fast and wearing was quite easy, compared to extraoral appliances. The purpose of this study was to verify the duration of the treatment on class III malocclusion using intraoral removable appliances, which designed to accelerate vertical facial growth. 56 patients were selected with the complaint of the protruded mandible and class III malocclusion (overjet : -3 - 0 mm, overbite : 0 - 4 mm). Information like; age at start, duration of the treatment events, type of the treatment, overjet, overbite etc. was collected and calculated. The average age of the patients delivering the initial brace was $8.75{\pm}1.10year$. Most of the anterior crossbite was resolved within 6 months. The total treatment period was $21.79{\pm}10.73months$ with the additional procedures like the alignment of anterior teeth and torque control using additional removable and fixed orthodontic appliances. The correlation study showed that patient's cooperation (p = 0.000) and the use of fixed appliance (p = 0.032) were significantly influenced on treatment duration.

A Study on the Optimal Pre-loading Calculation of Strut of Retaining Wall through Numerical Interpretation (수치해석을 통한 흙막이벽체 버팀보의 최적 선행하중 산정에 관한 연구)

  • Moon, In Jong;Jang, Seung Ju;Lee, Kang Il
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.2
    • /
    • pp.45-56
    • /
    • 2021
  • As the utilization of the underground space is activated, deep excavation of ground has been conducted for the installation of underground structures, the earth retaining wall has widely used to minimize deformation of the excavated ground. In particular, as deep excavation is actively progressing in an urban area where structures are concentrated, methods to minimize the deformation of wall have been devised to prevent damage to the structure adjacent to the wall, and one of these methods is the pre-loading method. This method is a method of suppressing the deformation of wall by actively applying a load on the strut to be installed in wall, and research on this method has been conducted recently. However, although related studies have been actively conducted, the management standard for the pre-loading of bracing has not been clearly presented until now. In addition, since the working force in the strut may increase depending on the depth of excavation or the soil condition of the backfill, the magnitude of the pre-loading that can be applied to the brace may decrease. Nevertheless, the magnitude of the pre-loading (more than 50% of the working load) proposed by the previous research results has been uniformly applied to the strut. In this study, 3D finite element analysis was performed to evaluate the application range of the pre-loading of H-beam strut according to the soil conditions of backfill. As a result of the analysis, it was found that there is a very high possibility that a problem may occur in the stability of the structure of strut due to the earth pressure and the pre-loading when the soil condition is weak and deep excavation proceeds. And it was found that the application range of the pre-loading was 5%~70% of the working load in strut.

Assessment of the Structural Collapse Behavior of Between Offshore Supply Vessel and Leg in the Jack-up Drilling Rig (잭업드릴링 리그의 레그와 작업 지원선 충돌에 의한 구조붕괴 거동 평가)

  • Park, Joo-Shin;Seo, Jung-Kwan
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.4
    • /
    • pp.601-609
    • /
    • 2022
  • Jack-up drilling rigs are mobile offshore platforms widely used in the offshore oil and gas exploration industry. These are independent, three-legged, self-elevating units with a cantilevered drilling facility for drilling and production. A typical jack-up rig includes a triangular hull, a tower derrick, a cantilever, a jackcase, living quarters and legs which comprise three-chord, open-truss, X-braced structure with a spudcan. Generally, jack-up rigs can only operate in water depths ranging from 130m to 170m. Recently, there has been an increasing demand for jack-up rigs for operating at deeper water levels and harsher environmental conditions such as waves, currents and wind loads. All static and dynamic loads are supported through legs in the jack-up mode. The most important issue by society is to secure the safety of the leg structure against collision that causes large instantaneous impact energy. In this study, nonlinear FE -analysis and verification of the requirement against collision for 35MJ recommended by DNV was performed using LS-Dyna software. The colliding ship used a 7,500ton of shore supply vessel, and five scenarios of collisions were selected. From the results, all conditions do not satisfy the class requirement of 35MJ. The loading conditions associated with chord collision are reasonable collision energy of 15M and brace collisions are 6MJ. Therefore, it can be confirmed that the identical collision criteria by DNV need to be modified based on collision scenarios and colliding members.