• Title/Summary/Keyword: blasting site

Search Result 182, Processing Time 0.028 seconds

Prediction of Rock Mass Strength Ahead of Tunnel Face Using Hydraulic Drilling Data (천공데이터를 이용한 터널 굴진면 전방 암반강도 예측)

  • Kim, Kwang-Yeom;Kim, Sung-Kwon;Kim, Chang-Yong;Kim, Kwang-Sik
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.479-489
    • /
    • 2009
  • Appropriate investigation of ground condition near excavation face in tunnelling is an inevitable process for safe and economical construction. In this study mechanical parameters from drilling process for blasting were investigated for the purpose of predicting the ground condition, especially rock mass strength, ahead of tunnel face. Rock mass strength is one of the most important factors for classification of rock mass and making a decision of support type in underground construction. Several rock specimens which are considered homogeneous and having different strength values respectively were tested by hydraulic drill machines generally used. As a result, penetration rate is fairly related with rock mass strength among drilling parameters. It is also found that penetration rate increases along with the higher impact pressure even under same rock strength condition. It is finally suggested that new prediction method for rock mass strength using percussive pressure and penetration rate during drilling work can be utilized well in construction site.

Application of risk analysis and assessment considering tunnel stability and environmental effects in tunnel design (터널 안정성 및 환경성을 고려한 위험도 평가기법의 적용)

  • Kim, Young-Geun;Kim, Do-Hyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2008
  • Recently, because of the various factors by uncertainty of underground, the risks in tunnelling have been occurred increasingly. Therefore, it is very important to estimate and control the risks considering geotechnical conditions for tunnel stability and environmental problems by tunnel construction. In this study, the risk analysis for tunnel stability was carried out by classifying the risk factors such as ground support capacity, ground settlement, the inflow of groundwater into the tunnel and the damage by the earthquake. Also, the risk assessment for the environmental problems was performed by calculating the vibration and noise by blasting and the drawdown of the groundwater level caused by tunnel construction. Each risk factor was evaluated quantitatively based on the probabilistic and statistic technique, then it was analyzed the distribution characteristic along overall tunnel site. Finally, it was evaluated that how much each risk factor influences on the construction cost with a period for tunnel construction, so it is possible to perform reasonable tunnel design which was capable of minimizing the risks in the tunnel construction.

  • PDF

A Study on the Plan for Advanced Noise-Policy in the 21st Century (21세기 소음정책 선진화 방안 고찰)

  • Yang, Geun-Ho;Park, Young-Min;Lee, Nae-Hyun;Chang, Yoon-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.1
    • /
    • pp.21-30
    • /
    • 2009
  • The study show that things about the noise control are indicated at The Noise & Vibration Control Act and the other Act. Also, the details program and total government ministries' program for the noise control are indicated what are the advance noise control plan. The study consist of the four part which are "Draw up the environmental noise infrastructure plan; the install shall be done the noisemap & the automatic noise measurement devices", "Resetting of environmental noise standard at the application area and Introduce of indoor noise; the guide for region classification of the noise standard & indoor noise", "Setting of aircraft noise standard and Program of measurement point operation; the noise-assessment-standard shall change from WECPN to new index($L_{den}$, $L_{dn}$, $L_{Aeq\;24h}$) & the operation and control of aircraft noise measurement changes from local environmental office to central control center" and "The method of noise regulation at construction site and the plan on making of standard for vibration regulation; It shall be made that the guideline of construction noise should include a target-construction, noise standard etc & the ministries shall unify control about construction vibration of the blasting vibration". The advance noise-policy will improve efficiency to deal with civil appeal & damage on residents about noise.

Public Nuisance and Aggregate Assessments of the Dangri Crushed Stone Quarry Busan, Korea. (부산직할시 산양사리 당리석산의 채석공해 및 쇄석골재 평가연구)

  • 김항묵
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.3
    • /
    • pp.41-53
    • /
    • 1983
  • The Dangri Crushed Stone Quarry is located in Dangridong, Busan City, and around the estuary of the Nagdong River. The quarry is considered to be a very promised one in the urban area from the standpoints of the assessment of the aggregate rank, the environmental impacts and the transportation distance. The crushed stones for aggregate of the quarry marks the higher rank in the gravity, the absorption ratio, the abrasion ratio, and the stability in comparison with the JISA 5005. The basement vibrations of the residential section in the vicinity of the quarry, which are arised by the millisecond blasting at the quarry site using the gelatin dynamites less than 39kg in weight, are measured to assess the vibration nuisance. The values of acceleration and the magnitudes are less than eight gals and O on the Richter scale respectively, the vibration nuisance thus can be ignored in such scales of the experiments. The traffic vibrations of the residential section are slightly susceptible. In the experiments, the traffic vibrations appears to be sensibler to the basement than the explosion vibration. The explosion noises in the experiments are not checked not only on the RION Sound Level Meter but also to our ears. The values of traffic noises also are in the safety values of the noise nuisance. The crush dust suspends in the air toward the upper valley in the opposite side of the residential area because of the influences of the sea breeze and the valley wind in the daytime, and the monsoon and the topographic disposition. the dust nuisance thus would not be remained in problem. The quarry is operated in the daytime only. The traffic dust in the residential area will be reduced by the faultless pavement and the careful driving. The elaborate survey on the ridges and peaks surrounded the quarry is recommended to prevent in advance the accidents of the rock slide. Moreover, it is required to make an advisory committee to develop the industry and to save the techniques. The most important matter is the accomodation between the attitude of the enterprising man for the social responsibility to the public nuisance and the cooperative spirit of the inhabitants for the industry.

  • PDF

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

Case Study on the Tunnel Collapse at the Shallow Depth (NATM터널 저토피 구간에서의 막장붕락 사례연구)

  • Baek Ki-Hyun;Roh Jong-Ryun;Kim Yong-Il;Cho Sang-Kook;Hwang Nag-Youn
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.102-110
    • /
    • 2005
  • ○ ○ tunnel that is located at Iksan - Jangsu freeway ○ ○, has collapsed during construction at the valley with shallow depth. Although, the site investigations, such as TSP, drilling exploration and so of indicated the presence of discontinuities in this section. The RMR was upgraded and the construction were carried out because that not only actual rock qualities were relatively good during construction but also the tunnel foe was stabilized. However, the tunnel was collapsed at the same time blasting of full face, and surface and underground water was infiltrated due to the settlement of the upper part of the tunnel face. To restore the collapsed section, 3-d tunnel stability analysis was performed and suitable reinforcement methods were chosen. The cavity of the upper tunnel face was stabilized by means of UAM and ALC injection. And the settlement was restored using L.W grouting method.

PRIMARY STABILITY OF IMPLANTS IN ILIUM OF CADAVER BY THE METHODS OF RECIPIENT SITE PREPARATION (사체의 장골에서 수용부 형성방법에 따른 임플란트 일차 안정성)

  • Sim, Jung-Woo;Cho, Jin-Yong;Kook, Min-Suk;Park, Hong-Ju;Oh, Hee-Kyun
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.34 no.2
    • /
    • pp.180-186
    • /
    • 2008
  • Purpose: This study was performed to evaluate the effect of the implant recipient site preparation methods on primary stability of implants with the instruments of $Osstell^{TM}$ and $Periotest^{(R)}$ in the iliac bone of cadaver. Methods and materials: The 8 iliac bones in 4 cadavers and implants treated with resorbable blasting media (RBM) were used. $Periotest^{(R)}$ (Simens AG, Germany) and $Osstell^{TM}$ (Model 6 Resonance Frequency Analyser: Integration Diagnostics Ltd., Sweden) were used to measure primary stability of implants. Implants were inserted into the iliac crest of the cadaver. In control group, the recipient site was prepared according to the manufacturer's recommendation: 1.8 mm guide drill, 2.0 mm initial drill, 2.7 mm pilot drill, 2.7 mm twist drill, 3.0 mm twist drill, 3.3 mm pilot drill, 3.3 mm twist drill, and 3.3 mm countersink drill as well as tapping drill were used in order. In the group 1, implant recipient sites were prepared by sequentially drilling from 1.8 mm guide drill to 3.0 mm twist drill and then inserted implants without countersinking and tapping. In the group 2, implant recipient sites were prepared to 3.0 mm twist drill and countersink drill and then inserted implants without tapping. In the group 3, the sites were prepared to 3.0 mm twist drill and countersink drill as well as tapping drill. In the group 4, the sites were prepared to 3.3 mm twist drill. In the group 5, the sites were prepared to 3.3 mm twist drill and countersink drill. A total of 60 implants were placed (n=10). The stability was measured using $Osstell^{TM}$ and $Periotest^{(R)}$ mesiodistally and buccolingually. To compare the mean stability of each group statistically, One-way ANOVA was used and correlation of instrument were analyzed using SPSS 12.0. The results obtained were as follows; 1. The stability of group 1 measured using $Osstell^{TM}$ and $Periotest^{(R)}$ buccolingually showed the highest, and there are significant difference statistically between control group and experimental group 1,2,4 in each instruments respectively (p<0.05). 2. The stability of group 1 measured using $Osstell^{TM}$ and $Periotest^{(R)}$ mesiodistally showed the highest. There are significant difference statistically between control group and all experimental groups in $Osstell^{TM}$, and between control group and experimental group 1,2,3,4 (p<0.05). 3. There are high correlation between the measurements of $Osstell^{TM}$ and $Periotest^{(R)}$ (p<0.05). Conclusion: These results indicate that the primary stability of implant can be obtained by the recipient sites preparation with smaller diameter drill than that of implant or minimal drilling.

Microseismic Monitoring Using Seismic Mini-Array (소규모 배열식 지진관측소를 이용한 미소지진 관측)

  • Sheen, Dong-Hoon;Cho, Chang Soo;Lee, Hee Il
    • Geophysics and Geophysical Exploration
    • /
    • v.16 no.1
    • /
    • pp.53-58
    • /
    • 2013
  • It was introduced a seismic mini-array that could monitor microseismicity efficiently and analyzed seismic data obtained from the mini-array that was operated from December 19, 2012 to January 9, 2013. The mini-array consisted of a six channel data logger, a central 3 components seismometer, and a tripartite array of vertical sensors centered around the 3 components seismometer as an equilateral triangle with about 100 m aperture. All seismometers that had the same instrument response were connected a 6 channel data logger, which was set to record seismograms at a sampling rate of 200 sps. During the three weeks of campaign, a total of 16 microearthquakes were detected. Using time differences of P wave arrivals from the vertical components, S-P time from 3 components seismometers, and back azimuth from the seismic array analysis, it was possible to locate the hypocenter of the microearthquake even with one seismic miniarray. The epicenters of two nearest microearthquakes were a quarry site located 1.3 km from the mini-array. The records of quarry blasting confirmed the our analysis.

Comparative Study Of Osseointergration On Different Immediate Implants In Extraction Sockets Of Beagle Dogs (성견에 발치 후 즉시 임플란트 식립시 RBM 처리된 임플란트의 골융합에 관한 연구)

  • Sun, Ki-Jong;Park, Jae-Young;Jung, Eun-Gyeong;Shin, Mee-Ran;Kim, Yun-Sang;Pi, Sung-Hee;Shin, Hyung-shik;You, Hyung-Keun
    • Journal of Periodontal and Implant Science
    • /
    • v.37 no.2
    • /
    • pp.209-221
    • /
    • 2007
  • Recently, immediately after losing teeth. implant placement has been greatly attempted. Implant can help restoration of tooth functions within short time. This study was an attempt to examine the extent of osseointergation when the implants will be placed immediately after teeth extraction using domestic implant systems. Implants were inserted in beagle dogs and evaluated the clinical, radiological, histological and histomorphometric assay at 6 weeks and 12 weeks. For experimental materals, $STAGE-1^{(R)}$($4.1{\times}8mm$, Lifecore, USA), $SS-III^{(R)}$($4.0{\times}8mm$, OSSTEM, Korea) and $IFI^{(R)}$($4.0{\times}8mm$, Dio, Korea) implants treated with RBM were placed. All the placed site showed normal results without fail and inflammation clinically and radiologically. As a result of measurement by periotest, it showed $-2\;{\sim}\;-5$ and stable status comprehensively. There was no statistically significant difference among implants(p<0.05). Bone tissue adjacent to implant showed increased marrow tissue at 6 weeks. Nevertheless, osteogenic structure was not observed remarkably. In a 12 weeks opinion, bone tissue composed of osseointegration along implant interface showed significantly decreased marrow tissue containing central vessels unlike a 6 weeks opinion and matured compact bone whose osteogenic structure is well formed. BIC were 42.4%, 32.0% and 34.9%, respectively in 6 weeks and there was no statistically significant difference among group(p<0.05). In 12 weeks, BIC were 58.8%, 61.9% and 57.5%. respectively and there was no statistically significant difference among groups(p<0.05). It is considered that all 3 implant systems are suitable for immediate implant placement.

Comparative analysis of cutting performance for basalt and granite according to abrasive waterjet parameters (연마재 워터젯 변수에 따른 현무암 및 화강암 절삭성능 비교분석)

  • Park, Jun-Sik;Cha, Hyun-Jong;Jo, Seon-Ah;Jung, Ju-Hwan;Oh, Tae-Min
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.5
    • /
    • pp.395-409
    • /
    • 2022
  • To overcome the limitation of conventional rock excavation methods, the excavation with abrasive waterjet has been actively developed. The abrasive waterjet excavation method has the effect of reducing blasting vibration and enhancing the excavation efficiency by forming a continuous free surface on the rock. However, the waterjet cutting performance varies with rock fracturing characteristics. Thus, it is necessary to analyze the cutting performance for various rocks in order to effectively utilize the waterjet excavation. In this study, cutting experiments with the high pressure waterjet system were performed for basalt and granite specimens. Water pressure, standoff distance, and traverse speed were determined as effective parameters for the abrasive waterjet cutting. The cutting depth and width of basalt specimens were analyzed to compare with granite results. The averaged cutting depth of basalt was shown in 41% deeper than granite; in addition, the averaged cutting width of basalt was formed by 18.5% narrower than granite. The results of this study are expected to be useful basic data for applying rock excavation site with low strength and high porosity such as basalt.