• Title/Summary/Keyword: blasting design

Search Result 233, Processing Time 0.024 seconds

Development of Automated Pattern Generation Method for Tunnel Blasting (터널발파설계 자동화를 위한 발파패턴 설계식 개발)

  • Choi Yong-Kun
    • Explosives and Blasting
    • /
    • v.23 no.4
    • /
    • pp.19-29
    • /
    • 2005
  • Blasting design methods applied in Korea were originally made for foreign rock conditions and blasting environments. Therefore, it has not been fully fitted to the Korean rock renditions. Since 1998, several studies for the automated pattern design of tunnel blasting have been carried out. As the result, a new blasting design method which can settle the problems was developed. Through it is more complex than prior method, it call provide a variety of advantages for us. Through the method, it is possible to vary charge weight according to the changing advance. It ran also be applied to the various design for contour holes. In this study, the newly developed method is introduced.

A Study on Development of Rock Blasting Design Program (암 발파설계 프로그램 개발에 관한 연구)

  • 강추원
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2000.09a
    • /
    • pp.223-228
    • /
    • 2000
  • In this study, RFD(Rock Blasting Design) program was developed to perform easily on plans of rock blasting. This program has abilities as follows, that is. the test blasting plan, the bench blasting plan, and the blasting vibration analysis. The value of geological property and blasting constants was offered by database, input value of variety constants repeatedly is planned out, faster and easier. And a value of input constant may be used by user for necessity.

  • PDF

A Study on Development of Rock Blasting Design Program (암 발파설계 프로그램 개발에 관한 연구)

  • 강추원
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.469-474
    • /
    • 2000
  • In this study, RBD(Rock Blasting Design) program was developed to perform easily on plans of rock blasting. This program has abilities as follows, that is, the test blasting plan, the bench blasting plan, and the blasting vibration analysis. The value of geological property and blasting constants was offered by database, input value of variety constants repeatedly is planned out, faster and easier. And a value of input constant may be used by user for necessity.

  • PDF

Tunnel Blasting Design with Equations Obtained from Borehole and Crater Blasting (시추공 및 누두공 발파자료의 터널설계 적용)

  • 양형식;임성식;김원범
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.5
    • /
    • pp.327-333
    • /
    • 2003
  • Characteristics of vibration propagation of borehole blasting were analyzed with 578 borehole vibration data obtained from 23 sites which were used in tunnel and underground space design, and 221 tunnel vibration data fron 4 sites of tunnel under construction. Analysis results on the damping of vibration velocity show that site factors in borehole blasting were higher than those in tunnel blasting. And the critical charge calculated from regression equations at large scaled distance was lower in borehole blasting. Dominant frequency was in the range of 30∼60Hz for the borehole blasting and 60∼90Hz for the tunnel blasting. As a conclusion, the borehole blasting data should not be used on the tunnel blasting design without careful statistical analysis.

A Study on the Design of PLHBM (선대구경 수평보링 발파공법(PLHBM)의 설계 연구)

  • Beak, Jong-Hyun;Beak, Sang-Hyun;Han, Dong-Hun;Won, Ah-Ram;Kim, Chang-Seop
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.66-76
    • /
    • 2012
  • Blasting technology aims to maximize digging efficiency as well as minimize vibration and noise. So, it is key point of blasting technology to raise blasting effect as much as possible and reduce vibration and noise and the design of PLHBM that is the tunnel blasting method having such merit was studied in this paper. PLHBM has the excellent blasting efficiency as it drills the empty hole with high caliber of 250~1,000mm at centre cut, contributes to blasting vibration reduction effect much and can be usefully applied to tunnel blasting sites. So it is judged that it enables the development of tunnel blasting method to be advanced one more step by studying and suggesting the design method of PLHBM.

A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

Effect of Rock Damage Induced by Blasting on Tunnel Stability (발파굴착의 암반손상이 터널안정성에 미치는 영향분석)

  • Lee, In-Mo;Yoon, Hyun-Jin;Kim, Dong-Hyun;Lee, Sang-Don;Park, Bong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.681-688
    • /
    • 2003
  • Rock damage induced by blasting can not be avoided during tunnel construction and may affect tunnel stability. But the mutual interaction between tunnel blasting design and tunnel stability design is generally not considered. Therefore this study propose a methodology to take into considration the results of the blasting damage in tunnel stability design. Rock damage is evaluated by dynamic numerical analysis for the most common blasting pattern adopted in road tunnel. Damage zone is determined by using the continuum damage model which is expressed as a function of volumetric strain. And the damage effect is taken into account by the damaged rock stiffness and the damaged failure criteria in tunnel stability assessment. The extend of plastic zone and deformation increase compared to the case of not considering blast-induced rock damage.

  • PDF

Design guide for full-face blasting in highway tunnel (고속도로 터널에 대한 전단면 발파 설계방안 연구)

  • Lee, Sang-Don;Choi, Hae-Moon;Lee, Hyun-Koo;Ryu, Chang-Ha
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.930-937
    • /
    • 2004
  • In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.

  • PDF

Prediction of Blasting-induced Vibration at Sintanjin Area, Daejeonusing Borehole Test Blasting (시추공 시험발파를 이용한 대전 신탄진 지역의 발파진동 예측)

  • Lee, Chung-Won;Park, Sung-Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.55-62
    • /
    • 2018
  • Problems on vibration due to blasting for infrastructure development are getting important because of a civil appeal. Blasting-induced vibration is representative construction pollution, hence, it is possible that a number of environmental damages occur. In this study, borehole test blasting was conducted at Sintanjin area, Daejeon and square root equation with 95% confidence level was proposed for prediction of blasting-induced vibration. The vibration value predicted from this equation was more conservatively evaluated than the values predicted from U.S. Department of Interior, Bureau of Mines (USBM) and Nippon Oil & Fats Co., Ltd. (NOF) equations. Therefore, the proposed equation in this study seems to contribute for safety blast design. However, for optimal blast design, inducing equation for prediction of blasting-induced vibration through the identical test blasting with field construction such as rock slope blasting would be required.

A Study on the Predictive Modeling of Material Removal and Surface Roughness in Powder Blasting of Glass by Design of Experiments (파우더 블라스팅에 의한 유리가공시 실험계획법에 의한 재료 제거량 및 표면 거칠기 예측모델에 관한 연구)

  • Jin Quan-Qia;Seong Eun-Je;Han Jin-Yong;Yoo Woo-Sik;Park Dong-Sam
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.15 no.2
    • /
    • pp.66-72
    • /
    • 2006
  • The old technique of sandblasting which has been used for paint or scale removing, deburring and glass decorating has recently been developed into a powder blasting technique for brittle materials, capable of producing micro structures larger than $100{\mu}m$. In this paper, we studied on the predictive modeling of material removal and surface roughness in powder blasting of glass by design of experiments. The surface characteristics and surface shape of powder blasted glass surface were tested under different blasting parameter. Finally, we proposed a predictive model for powder blasting process, and compared with experimental results.