• Title/Summary/Keyword: basic flood.

Search Result 232, Processing Time 0.028 seconds

Future Runoff Characteristics of Ganwol Estuary Reservoir Watershed Based on SSP Scenarios (SSP 기후변화 시나리오에 따른 간월호 유역의 미래 유출특성 변화)

  • Kim, Sinae;Kim, Donghee;Kim, Seokhyeon;Hwang, Soonho;Kang, Moon-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.65 no.5
    • /
    • pp.25-35
    • /
    • 2023
  • The estuary reservoir is a major source of agricultural water in Korea; for effective and sustainable water resource management of the estuary reservoir, it is crucial to comprehensively consider various water resource factors, including water supply, flood, and pollutant management, and analyze future runoff changes in consideration of environmental changes such as climate change. The objective of this study is to estimate the impact of future climate change on the runoff characteristics of an estuary reservoir watershed. Climate data on future Shared Socioeconomic Pathway (SSP) scenarios were derived from two Global Climate Models (GCMs) of the Coupled Model Intercomparison Project phase 6 (CMIP6). The Hydrological Simulation Program-Fortran (HSPF) was used to simulate past and future long-term runoff of the Ganwol estuary reservoir watershed. The findings showed that as the impact of climate change intensified, the average annual runoff in the future period was higher in the order of SSP5, SSP3, SSP1, and SSP2, and the ratio of runoff in July decreased while the ratio of runoff in October increased. Moreover, in terms of river flow regime, the SSP2 scenario was found to be the most advantageous and the SSP3 scenario was the most disadvantageous. The findings of this study can be used as basic data for developing sustainable water resource management plans and can be applied to estuary reservoir models to predict future environmental changes in estuary reservoirs.

Monitoring of the Mobility of Fish on Turbidity Changes (탁도 변화에 따른 어류의 이동 특성 모니터링)

  • Joon Gu Kang;Nam Ju Lee;Dong Ho Nam
    • Ecology and Resilient Infrastructure
    • /
    • v.10 no.4
    • /
    • pp.201-207
    • /
    • 2023
  • Suspended solid in river is resource serious contamination. Suspended solid have a pernicious influence to fish and aquatic ecosystem. Flood and sediment and land use in river are largely[mainly] responsible of suspended solid. Especially, resuspension phenomenon of sediment will be dangerous effect to aquatic ecosystem. Study of fish and aquatic ecosystem on suspended solidus slight in fresh water. This study was basic research to manage fish and aquatic ecosystem on turbidity. It was conducted to analyze and monitor fish response on turbidity. Result in this study was confirmed the insensitive and die of fish on reduction of oxygen supply.

A Study on the Estimation of the Design Flood for Small Catchment in Sobaek (소백산 소하천 유역의 홍수량 산정에 대한 고찰)

  • Hyung Joon Chang;Seong Goo Kim;Ki Soon Park;Young Ho Yoon
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.2
    • /
    • pp.99-104
    • /
    • 2023
  • In recent years, the occurrence of abnormal weather has increased rapidly, increasing the frequency of torrential rain. As a result, stable water resource management is difficult, and human and material damage is increasing. Various measures are being established to reduce damage caused by torrential rains, but small-scale mountain catchments are relatively difficult to manage due to lack of basic plan. In this study, the risk of flooding was evaluated using the rainfall-flow model in the Yeonhwa-dong catchment national park among national parks in Korea. The Yeonhwa-dong catchment of Mt. Sobaeksan was simulated to cause flooding when rainfall of more than 50 years occurred, and it was confirmed that there was a high risk of water resource structures, safety facilities, and trails.

Studies on the Derivation of the Instantaneous Unit Hydrograph for Small Watersheds of Main River Systems in Korea (한국주요빙계의 소유역에 대한 순간단위권 유도에 관한 연구 (I))

  • 이순혁
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.19 no.1
    • /
    • pp.4296-4311
    • /
    • 1977
  • This study was conducted to derive an Instantaneous Unit Hydrograph for the accurate and reliable unitgraph which can be used to the estimation and control of flood for the development of agricultural water resources and rational design of hydraulic structures. Eight small watersheds were selected as studying basins from Han, Geum, Nakdong, Yeongsan and Inchon River systems which may be considered as a main river systems in Korea. The area of small watersheds are within the range of 85 to 470$\textrm{km}^2$. It is to derive an accurate Instantaneous Unit Hydrograph under the condition of having a short duration of heavy rain and uniform rainfall intensity with the basic and reliable data of rainfall records, pluviographs, records of river stages and of the main river systems mentioned above. Investigation was carried out for the relations between measurable unitgraph and watershed characteristics such as watershed area, A, river length L, and centroid distance of the watershed area, Lca. Especially, this study laid emphasis on the derivation and application of Instantaneous Unit Hydrograph (IUH) by applying Nash's conceptual model and by using an electronic computer. I U H by Nash's conceptual model and I U H by flood routing which can be applied to the ungaged small watersheds were derived and compared with each other to the observed unitgraph. 1 U H for each small watersheds can be solved by using an electronic computer. The results summarized for these studies are as follows; 1. Distribution of uniform rainfall intensity appears in the analysis for the temporal rainfall pattern of selected heavy rainfall event. 2. Mean value of recession constants, Kl, is 0.931 in all watersheds observed. 3. Time to peak discharge, Tp, occurs at the position of 0.02 Tb, base length of hlrdrograph with an indication of lower value than that in larger watersheds. 4. Peak discharge, Qp, in relation to the watershed area, A, and effective rainfall, R, is found to be {{{{ { Q}_{ p} = { 0.895} over { { A}^{0.145 } } }}}} AR having high significance of correlation coefficient, 0.927, between peak discharge, Qp, and effective rainfall, R. Design chart for the peak discharge (refer to Fig. 15) with watershed area and effective rainfall was established by the author. 5. The mean slopes of main streams within the range of 1.46 meters per kilometer to 13.6 meter per kilometer. These indicate higher slopes in the small watersheds than those in larger watersheds. Lengths of main streams are within the range of 9.4 kilometer to 41.75 kilometer, which can be regarded as a short distance. It is remarkable thing that the time of flood concentration was more rapid in the small watersheds than that in the other larger watersheds. 6. Length of main stream, L, in relation to the watershed area, A, is found to be L=2.044A0.48 having a high significance of correlation coefficient, 0.968. 7. Watershed lag, Lg, in hrs in relation to the watershed area, A, and length of main stream, L, was derived as Lg=3.228 A0.904 L-1.293 with a high significance. On the other hand, It was found that watershed lag, Lg, could also be expressed as {{{{Lg=0.247 { ( { LLca} over { SQRT { S} } )}^{ 0.604} }}}} in connection with the product of main stream length and the centroid length of the basin of the watershed area, LLca which could be expressed as a measure of the shape and the size of the watershed with the slopes except watershed area, A. But the latter showed a lower correlation than that of the former in the significance test. Therefore, it can be concluded that watershed lag, Lg, is more closely related with the such watersheds characteristics as watershed area and length of main stream in the small watersheds. Empirical formula for the peak discharge per unit area, qp, ㎥/sec/$\textrm{km}^2$, was derived as qp=10-0.389-0.0424Lg with a high significance, r=0.91. This indicates that the peak discharge per unit area of the unitgraph is in inverse proportion to the watershed lag time. 8. The base length of the unitgraph, Tb, in connection with the watershed lag, Lg, was extra.essed as {{{{ { T}_{ b} =1.14+0.564( { Lg} over {24 } )}}}} which has defined with a high significance. 9. For the derivation of IUH by applying linear conceptual model, the storage constant, K, with the length of main stream, L, and slopes, S, was adopted as {{{{K=0.1197( {L } over { SQRT {S } } )}}}} with a highly significant correlation coefficient, 0.90. Gamma function argument, N, derived with such watershed characteristics as watershed area, A, river length, L, centroid distance of the basin of the watershed area, Lca, and slopes, S, was found to be N=49.2 A1.481L-2.202 Lca-1.297 S-0.112 with a high significance having the F value, 4.83, through analysis of variance. 10. According to the linear conceptual model, Formular established in relation to the time distribution, Peak discharge and time to peak discharge for instantaneous Unit Hydrograph when unit effective rainfall of unitgraph and dimension of watershed area are applied as 10mm, and $\textrm{km}^2$ respectively are as follows; Time distribution of IUH {{{{u(0, t)= { 2.78A} over {K GAMMA (N) } { e}^{-t/k } { (t.K)}^{N-1 } }}}} (㎥/sec) Peak discharge of IUH {{{{ {u(0, t) }_{max } = { 2.78A} over {K GAMMA (N) } { e}^{-(N-1) } { (N-1)}^{N-1 } }}}} (㎥/sec) Time to peak discharge of IUH tp=(N-1)K (hrs) 11. Through mathematical analysis in the recession curve of Hydrograph, It was confirmed that empirical formula of Gamma function argument, N, had connection with recession constant, Kl, peak discharge, QP, and time to peak discharge, tp, as {{{{{ K'} over { { t}_{ p} } = { 1} over {N-1 } - { ln { t} over { { t}_{p } } } over {ln { Q} over { { Q}_{p } } } }}}} where {{{{K'= { 1} over { { lnK}_{1 } } }}}} 12. Linking the two, empirical formulars for storage constant, K, and Gamma function argument, N, into closer relations with each other, derivation of unit hydrograph for the ungaged small watersheds can be established by having formulars for the time distribution and peak discharge of IUH as follows. Time distribution of IUH u(0, t)=23.2 A L-1S1/2 F(N, K, t) (㎥/sec) where {{{{F(N, K, t)= { { e}^{-t/k } { (t/K)}^{N-1 } } over { GAMMA (N) } }}}} Peak discharge of IUH) u(0, t)max=23.2 A L-1S1/2 F(N) (㎥/sec) where {{{{F(N)= { { e}^{-(N-1) } { (N-1)}^{N-1 } } over { GAMMA (N) } }}}} 13. The base length of the Time-Area Diagram for the IUH was given by {{{{C=0.778 { ( { LLca} over { SQRT { S} } )}^{0.423 } }}}} with correlation coefficient, 0.85, which has an indication of the relations to the length of main stream, L, centroid distance of the basin of the watershed area, Lca, and slopes, S. 14. Relative errors in the peak discharge of the IUH by using linear conceptual model and IUH by routing showed to be 2.5 and 16.9 percent respectively to the peak of observed unitgraph. Therefore, it confirmed that the accuracy of IUH using linear conceptual model was approaching more closely to the observed unitgraph than that of the flood routing in the small watersheds.

  • PDF

Analysis of Groundwater Use in Kap-cheon Basin (갑천 유역의 지하수 이용 특성 분석)

  • Hong, Sung-Hun;Kim, Jeong-Kon
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.5
    • /
    • pp.463-471
    • /
    • 2008
  • The purpose of this study is to analyze the features of groundwater use to utilize as basic information for water-cycle analysis system development and effective groundwater management in the Kap-cheon basin. The cumulative relationship between groundwater use and the number of wells was analyzed to estimate the representative total groundwater use and the number of wells for the Kap-cheon basin. Then, the spatial distribution of groundwater use in the basin were figured out using the detailed information on groundwater use in each well. Finally, the reasonability of groundwater resources management in Kap-cheon basin was evaluated by comparing groundwater recharge and groundwater use in sub-basins and major stream basins. The results of the analysis showed about 25% of the total wells could represent 90% of groundwater use ($37,923,516\;m^3$/year) in the Kap-cheon basin. A detailed analysis on the groundwater uses in the vicinity of down-town areas of Daejeon metropolitan city showed high groundwater uses ($1.4{\sim}11.1$ times) compared to the groundwater recharge previously estimated using the rainfall-runoff model. The ratio of groundwater use and groundwater recharge for the major river basins in Kap-cheon basin ranged from 1.9 to 2.3 indicating that more sustainable groundwater management should be exercised. The results of this study can be used as basic information in evaluating the change of groundwater flow, stream flow and water-cycle for various groundwater uses in the Kap-cheon basin.

Changes of the Breeding State of Little Tern (Sterna albifrons) in the Nakdong Estuary, Busan, Republic of Korea (낙동강하구에서 쇠제비갈매기의 번식 상황의 변화)

  • Lee, In-Sup;Hong, Soon-Bok
    • Journal of Life Science
    • /
    • v.19 no.11
    • /
    • pp.1611-1616
    • /
    • 2009
  • This study was conducted to determine the characteristics in breeding of the little tern Sterna albifrons in Shinja-do and Doyo-Deung in Nakdong estuary. The data was obtained in the middle and late 1990's and in the mid 2000's, which were analysed for the breeding information of the little tern. In Shinja-Do, a total of 638 nests were observed in 1995, and the average numbers of eggs laid per nest were 2.48. In 2004 and 2005, 94 and 456 nests were observed, and the average number of eggs laid per nest was 2.16 and 2.53, respectively. There was a significant difference between the average numbers of eggs laid per nest for the 3 respective years. In Doyo-Deung, a total of 269 nests were observed in 1998, and the average number of eggs laid per nest was 2.16. In 2004 and 2005, 1,023 and 1,123 nests were observed, and the average numbers of eggs laid per nest were 2.33 and 2.52, respectively. There was a significant difference (p<0.001) between the average number of eggs laid per nest as well. Hatching success rate by nesting site in Shinja-Do was calculated in 1995. Type A nest (nest located on dry sand land) showed a 56.8% success rate, and type B nest (nest located on the land with dwarf grass), type C nest (nest located on moist land) and type D nest (nest located on the land with shells) showed 55.3%, 36.6% and 59.3% success rates, respectively. The average hatching success rate in Shinja-Do was 54.5%. The most crucial factor for hatching failure was flood, especially, for the type C nests. The hatching success rate by the nesting site in Doyo-Deung showed an average of 73.2%. It was high in type D nest (83.8%) and type A nest (75.9%), and low in type C nest (59.7%). Again, the most crucial factor for hatching failure was flood, especially, for the type C nests. Nakdong estuary has been through many changes over time, particularly in recent. Therefore, continuous efforts to keep it a breeding place for the little tern are urgently required, including overall management of land, protection of reef and sand, etc.

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

Applicability Analysis of Head Loss Coefficients at Surcharge Manholes for Inundation Analysis in Urban Area (도시침수해석을 위한 과부하 맨홀의 손실계수 적용성 분석)

  • Kim, Chae Rin;Kim, Jung Soo;Yoon, Sei Eui
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.3
    • /
    • pp.395-406
    • /
    • 2018
  • The XP-SWMM model, widely used for inundation analysis of urban watersheds, underestimated the inundation area (range) because the manhole was regarded as a node and the influence of the local loss occurring in the surcharged manhole can not be considered. Therefore, it is necessary to analyze the applicability of the head loss coefficients considering the local loss in the surcharged manholes in inundation analysis using XP-SWMM. The Dorim 1 drainage section of the Dorim-river watershed, where frequent domestic flood damage occurred, was selected as the study watershed. The head loss coefficients of the surcharged manholes estimated from the previous experimental studies were applied to the inundation analysis, and the changes of the inundation area with and without the application of the head loss coefficients with manhole types were compared and analyzed. As a result of inundation simulation with the application of head loss coefficients, the matching rates were increased by 17% in comparison with the without application of them. In addition, the simulated inundation area applied only the head loss coefficients of straight path manholes and applied up to the head loss coefficients of combining manholes ($90^{\circ}$ bend, 3-way, and 4-way) were similar. Therefore, in order to accurately simulate the storm drain system in urban areas, it could be to carry out two-dimensional inundation analysis considering the head loss coefficients at the surcharged manholes. It was expected that the study results will be utilized as basic data for establishing the identification of the inundation risk area.

Development of Web Based Flood Inundation System - Basic research - (Web기반의 개발 - 기초연구 -)

  • Jun, Ji-Young;Seo, Young-Min;Yeo, Woon-Ki;Jee, Hong-Kee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1121-1125
    • /
    • 2006
  • 급속한 산업화와 도시화로 인하여 이상기후의 발생빈도가 높아지고 기후가 불안정해져서 예전보다 많은 집중호우가 발생되고 있다. 그리고 최근 홍수의 규모와 발생빈도가 증가하면서 홍수로 인한 인명과 재산상의 손실이 반복되고 있다. 이에 따른 홍수피해의 위험을 줄이기 위한 홍수방지시스템의 구축이 절실히 요구되고 있으며 홍수범람구역의 정확한 추정을 위해서는 홍수범람도 작성이 필요하다. 또한 정보통신산업이 급속도로 발전하면서 인터넷 사용의 증가로 많은 사용자들이 웹(Web)을 통해 다양한 데이터를 공유할 수 있고 정보를 검색할 수 있게 되면서 수자원 분야에도 정보의 공유와 자료의 통합을 위하여 Open GIS(The Open Geodata Interoperability Specification) 개념이 도입되고 있다. 따라서 본 연구에서는 Web기반으로 홍수범람모의 시스템을 구축하기 위한 기초연구로서 홍수 발생시 침수피해지역을 대상으로 실시간 3차원 홍수범람모의해석이 가능하도록 함으로써 연안지역 피해주민들의 피해를 줄일 수 있도록 하였다. 먼저, 본 연구에서는 이전의 시스템 상에서 정적인 지도로서 표현만 가능하던 것을 시공간적으로 유동성 있는 자료의 분석을 시각화하는 GIS 공간정보기술과 접목시켜 Web상에 동적인 지도형태로 표현함으로써 피해주민들이 쉽게 접할 수 있도록 하여 다양한 정보의 제공이 가능하게 될 것이다. 둘째, Web을 이용함으로써 실시간 홍수재해 정보를 수집하고 분석할 수 있어 인명과 재산의 피해를 줄일 수 있을 것으로 판단된다. 본 논문은 홍수범람시스템을 구축하기 위한 기초연구로서 현재는 GIS DB를 구축하는 단계에 있으며, 향후 다양한 유역을 대상으로 홍수범람모의시스템을 구축하여 분석결과를 피해지역주민 및 관련기관 실무자들에게 제공함으로써 시간과 공간에 구애받지 않는 재해관리와 신속한 재해 상황 대처가 가능해 질 것으로 사료된다.는 또 다른 형태의 주제도라고 볼 수 있으며, 이를 구축하기 위해서는 자료변환 및 가공이 필요하다. 즉, 각 상습침수지구에 필요한 지형도는 국립지리원에서 제작된 1:5,000 수치지형도가 있으나 이는 자료가 방대하고 상습침수지구에 필요하지 않은 자료들을 많이 포함하고 있으므로 상습침수지구의 데이터를 인터넷을 통해 서비스하기 위해서는 많은 불필요한 레이어의 삭제, 서비스 속도를 고려한 데이터의 일반화작업, 지도의 축소.확대 등 자료제공 방식에 따른 작업 그리고 가시성을 고려한 심볼 및 색채 디자인 등의 작업이 수반되어야 하며, 이들을 고려한 인터넷용 GIS기본도를 신규 제작한다. 상습침수지구와 관련된 각종 GIS데이타와 각 기관이 보유하고 있는 공공정보 가운데 공간정보와 연계되어야 하는 자료를 인터넷 GIS를 이용하여 효율적으로 관리하기 위해서는 단계별 구축전략이 필요하다. 따라서 본 논문에서는 인터넷 GIS를 이용하여 상습침수구역관련 정보를 검색, 처리 및 분석할 수 있는 상습침수 구역 종합정보화 시스템을 구축토록 하였다.N, 항목에서 보 상류가 높게 나타났으나, 철거되지 않은 검전보나 안양대교보에 비해 그 차이가 크지 않은 것으로 나타났다.의 기상변화가 자발성 기흉 발생에 영향을 미친다고 추론할 수 있었다. 향후 본 연구에서 추론된 기상변화와 기흉 발생과의 인과관계를 확인하고 좀 더 구체화하기 위한 연구가 필요할 것이다.게 이루어질 수 있을 것으로 기대된다.는 초과수익률이 상승하지만, 이후로는 감소하므로, 반전거래전략을 활용하는 경우 주식투자기간은 24개월이하의 중단기가 적합함을 발견하였다. 이상의 행태적 측면과 투자성과측면의 실증결과를 통하여 한국주식시장에 있어서 시장수익률을 평균적으로 초과할 수 있는 거래전략은 존재하므로 이러한 전략을 개발 및 활용할 수 있으며, 특히, 한국주식시장에 적합한 거래전략은 반전거래전략이고, 이 전략의 유용성은 투자자가

  • PDF

A study on the applicability of power usage method for the analysis of river water intake (하천수 취수량 분석을 위한 전력량법의 적용성 연구)

  • Baek, Jongseok;Kim, Chiyoung;Cha, JunHo;Song, Jaehyun
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.12
    • /
    • pp.975-984
    • /
    • 2019
  • As an essential prerequisite for systematic and integrated management of river water, it is necessary to secure the basic data such as discharge supplied to the river and released from the river. Under the current permit system for river water use, 59.1% of licensed facilities were found to have no discharge meters in 2017, especially for agricultural water, which makes it difficult to secure reliable data as a large portion of the reports are voluntarily reported by users. In this study, the indirect discharge measurement method of calculating the discharge through the power usage of the pumping station was applied to secure reliable discharge data. In particular, focusing on the fact that the discharge calculated by the power usage method differed with the actual discharge according to the level of the river, the study was conducted on improving the power usage method reflecting the river water level and improving the accuracy of discharge data. Analysis of the discharge calculated using the power usage method considering river water level using the correlation analysis method such as regression analysis, percent difference, root mean square error etc. confirmed that the results are not high compared to the conventional power usage method, but are slightly more approximated to the actual discharge. Therefore, although reliable discharge data can be obtained from the existing power usage method, it is expected that more accurate data on intaking water of river water can be obtained if the improved power usage method is used at points where the variation in the water level of the river is large.