• Title/Summary/Keyword: assembly production line

Search Result 137, Processing Time 0.023 seconds

The Design of the U-Shaped Assembly Line to Replace Conveyor Systems (컨베이어 라인 변경시 U - 라인 설계의 효율적 방안 - K전자 사례를 중심으로 -)

  • Park, Seung-Hun
    • IE interfaces
    • /
    • v.16 no.2
    • /
    • pp.240-247
    • /
    • 2003
  • Generally, the assembly system relied on conveyor lines is efficient for mass production. But it is not efficient when the product types are often varying and their lot sizes are small. Especially, it is much inefficient for the assembly lines for the electronic products whose types are varying very often. This paper suggests the design of U-shaped assembly lines to replace the existing conveyor systems. The assembly line for the mini-cassette production is dealt with as a case study. The proposed procedure was successfully applied for the design of U-shaped lines. The developed method resulted in the improvement of the productivity such as the decrease of the man power and the cycle time, and the increase of the line utility.

Development of Hierarchical Production Planning and Control System for Mixed-Model Assembly Manufacture-an Application in Refrigerator Factory (혼류 조립 공장을 위한 계층적 생산 계획 및 통제 시스템 개발 - 냉장고 공장 사례)

  • Shin, Hyun-Joon
    • IE interfaces
    • /
    • v.19 no.1
    • /
    • pp.34-42
    • /
    • 2006
  • This paper presents a scheme for a hierarchical production scheduling and control system for a refrigerator factory with mixed model assembly lines. The setting of the factory is as follows. There are three mixed-model assembly lines called main line A, B and C and two batch lines that supply parts to the main lines. For each of the main lines, three work-centers are dedicated to them. The sub-lines and work-centers produce parts in batch type. An incoming production order from the master planner is characterized by its product type, amount, and due date. Under this situation, the proposed scheme has several features to schedule and control the above mentioned factory; 1) select the starting time and the place (assembly line) for an order processing, 2) devise a way to control orders to be processed as scheduled, and 3) reschedule orders when something unexpected happen. Finally, this paper provides a case study where the proposed scheme is applied to.

A Design for the Automated Process of LCD Module Assembly Line (LCD 모듈 조립라인의 공정 자동화 설계)

  • Song, Chun-Sam;Kim, Joo-Hyun;Kim, Jong-Hyeong
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.16 no.5
    • /
    • pp.162-165
    • /
    • 2007
  • TFT-LCD process has two advantages as compared with the semiconductor-process. It is that cycle time is short and number of the final products are small. But it needs complicated inspection / assembly line to be treated manually and much higher labor costs in the TFT-LCD process. Also, It is necessary to build PICS(Production Information and Control System) which is automated and intelligent. In this paper, an automated process of LCD module assembly line that can increase productivity and reduce the cost of production to strengthen the competitiveness corresponding with global market is planned in comparison with its manual/semi-auto. It is noted that The automated line for COG$\sim$FOG process replacing with the existing facilities had the following effects; the productivity is increased to about 1.5 times and labor cost reduced 85%. In addition, whole assembly line can be short and simple.

A Study on the Two-sided and Mixed Model Assembly Line Balancing Using Genetic Algorithm (유전알고리듬을 이용한 양면.혼합모델 조립라인 밸런싱)

  • 이내형;조남호
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.2
    • /
    • pp.83-101
    • /
    • 2002
  • In this thesis presents line balancing problems of two-sided and mixed model assembly line widely used in practical fields using genetic algorithm for reducing throughput time, cost of tools and fixtures and improving flexibility of assembly lines. Two-sided and mixed model assembly line is a special type of production line where variety of product similar in product characteristics are assembled in both sides. This thesis proposes the genetic algorithm adequate to each step in tow-sided and mixed model assembly line with suitable presentation, individual, evaluation function, selection and genetic parameter. To confirm proposed genetic algorithm, we apply to increase the number of tasks in case study. And for evaluation the performance of proposed genetic algorithm, we compare to existing algorithm of one-sided and mixed model assembly line. The results show that the algorithm is outstanding in the problems with a larger number of stations or larger number of tasks.

Primer Coating Inspection System Development for Automotive Windshield Assembly Automation Facilities (자동차 글라스 조립 자동화설비를 위한 프라이머 도포검사 비전시스템 개발)

  • Ju-Young Kim;Soon-Ho Yang;Min-Kyu Kim
    • Journal of Sensor Science and Technology
    • /
    • v.32 no.2
    • /
    • pp.124-130
    • /
    • 2023
  • Implementing flexible production systems in domestic and foreign automotive design parts assembly has increased demand for automation and power reduction. Consequently, transition to a hybrid production method is observed where multiple vehicles are assembled in a single assembly line. Multiple robots, 3D vision sensors, mounting positions, and correction software have complex configurations in the automotive glass mounting system. Hence, automation is required owing to significant difficulty in the assembly process of automobile parts. This study presents a primer lighting and inspection algorithm that is robust to the assembly environment of real automotive design parts using high power 'ㄷ'-shaped LED inclined lighting. Furthermore, a 2D camera was developed in the primer coating inspection system-the core technology of the glass mounting system. A primer application demo line applicable to the actual automobile production line was established using the proposed high power lighting and algorithm. Furthermore, application inspection performance was verified using this demo system. Experimental results verified that the performance of the proposed system exceeded the level required to satisfy the automobile requirements.

Global Standard realizing process of Automobile Assembly Line

  • Seo, Byung-Chil
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.26-27
    • /
    • 2015
  • In the trend of globalization and location transfer of existing production bases is still characterized by an extremely unstable status between different countries and different regions. The results are negative impacts on cost, quality and speed of project implementation, especially automobile industry which is one of the most complex manufacturing sectors. In order to overcome problems from Global Standardization of Production Line and its Localization, it is highly required comprehensive coordination among design of production equipment, production technology, space and interfaces. It is necessary to set up standard of production equipment and building for parallel progress, in order to complete production line in shortest time for launching product. In addition, this standard should keep flexibility with consideration of local situation which means "Glocalization."

  • PDF

Design of Cluster Type Assembly System for Lens Module of Phone Camera (폰 카메라 렌즈모듈의 Cluster Type 조립시스템 설계)

  • Song J.Y.;Lee C.W.;Jung Y.W.;Kim Y.G.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.974-977
    • /
    • 2005
  • Automatic lens assembly system is used for automatically assembling the lens module of phone camera. In this paper, we are trying to develop the cluster type automatic lens assembly with standard tray for applying for assembly field directly. This paper proposes the principle of cluster type lens assembly system and the related assembly production line concept for optimal automatic lens production line.

  • PDF

A Study of Balancing at Two-sided and Mixed Model Work Line Using Genetic Algorithm (효율적인 유전알고리듬을 이용하여 양면.혼합모델 작업라인 균형에 대한 연구)

  • 이내형;조남호
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.05a
    • /
    • pp.91-97
    • /
    • 2002
  • In this thesis presents line balancing problems of two-sided and mixed model assembly line widely used in practical fields using genetic algorithm for reducing throughput time, cost of tools and fixtures and improving flexibility of assembly lines. Two-sided and mixed model assembly line is a special type of production line where variety of product similar in product characteristics are assembled in both sides. This thesis proposes the genetic algorithm adequate to each step in tow-sided and mixed model assembly line with suitable presentation, individual, evaluation function, selection and genetic parameter. To confirm proposed genetic algorithm, we apply to increase the number of tasks in case study. And for evaluation the performance of proposed genetic algorithm, we compare to existing algorithm of one-sided and mixed model assembly line. The results show that the algorithm is outstanding in the problems with a larger number of stations or larger number of tasks.

  • PDF

A Study on the Determination of Optimum Cycle Time for Assembly Line Balancing (Line Balancing을 위한 최적 Cycle Time의 결정방법)

  • 이근부
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.3 no.3
    • /
    • pp.35-39
    • /
    • 1980
  • Although the product line produces a large volume of goods in a relatively short time, once the product line is established there are numerous problems that arise in connection with this product line. One of these problems is the problem of balancing operations or stations in terms of equal times and in terms of the times required to meet the desered rate of production. The objective of line balancing is minimizing the idle time on the line for all combinations of work stations subject to certain restrictions. In general, there are two types of line-balancing situations : (1) assembly line balancing and (2) fabrication line balancing. Two approaches to the assembly line balancing problem have been used. The first assumes a filed cycle time and find the optimum number of work stations. The second approach to the assembly line balancing problem assumes the number of work stations to be fixed and systematically coverages on a solution which minimizes the total delay time by minimizing the cycle time. Here the cycle time is determined by the longest station time. In this paper, by using the second approach method, a general mathematical model, problem solutions, and computer program for the assembly line balancing problem is presented. Data used is obtained from the company which has been confronted with many problems arising in connection with their assembly line.

  • PDF

A Proposal for Prototype-Free Production Preparation Processes Utilizing 3DCG Animations

  • Shinoda, Shinji;Shimozawa, Kazuhiro;Niwa, Akira;Kawase, Takeshi;Matsumoto, Toshiyuki;Mizumachi, Tadahiro
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.2
    • /
    • pp.109-120
    • /
    • 2009
  • As the use of 3DCAD data became widespread in designing products in manufacturing, attempts have been made to shorten lead time and reduce cost of production preparation utilizing 3DCAD data for launching assembly lines. In order to create assembly plans not only efficient but easy for operators to operate ('easy-to-operate'), this study presents approaches, methods, and systems for creating 3DCGAs (3 Dimensional Computer Graphic Animations) which automatically utilize a prototype-free production preparation methodology. Characteristics of this study include that it proposes the methodology for creating assembly operation 3DCGAs automatically, for all the possible assembly operations corresponding each of the possible assembly sequences first. Using the created 3DCGAs, the study next considers assembly methods by evaluating how easy or 'operator friendly' they are in implementing, and devises tools or jigs to be used, and plans efficient assembly line organization. The concept of the methodology was formed by focusing on the value-adding assembly steps at which parts turn into products directly. The study also validates the effectiveness of the presented methodology by employing the methods used in actual production preparation process in businesses, and proves that an efficient assembly line can be organized in a shorter period of time utilizing the developed system and by preparing easy-to-operate and efficient plans in 3DCGAs at the design stage.