There are many agendas and discussion subjects for BIM-based Criteria Design phase. At that time, some problems are occurred by software compatibility, simple repetitive tasks, rework caused by missing information etc. In this study, we focus on solving that problems by applying API(Application Programming Interface) method. For effective study, we construct Criteria Design process by using DSM (Dependency Structure Matrix) and study applicability of API. It will be effective for time-consuming task and simply labor-intensive tasks by applying API. we expect improving BIM-based Design Process and Data quality, work productivity without missing information and shapes for using API.
Choi, Seung-Ho;Hwang, Jin-Ha;Han, Sun-Jin;Kang, Hyun;Lee, Jae-Yeon;Kim, Kang Su
Structural Engineering and Mechanics
/
제74권3호
/
pp.435-443
/
2020
The objective of this study was to determine the effective compressive strength of a column-slab connection with different compressive strengths between the column and slab concrete. A total of eight column specimens were fabricated, among which four specimens were restrained by slabs while the others did not have any slab, and the test results were compared with current design codes. According to ACI 318, the compressive strength of a column can be used as the effective compressive strength of the column-slab connection in design when the strength ratio of column concrete to slab concrete is less than 1.4. Even in this case, however, this study showed that the effective compressive strength decreased. The specimen with its slab-column connection zone reinforced by steel fibers showed an increased effective compressive strength compared to that of the specimen without the reinforcement, and the interior column specimens restrained with slabs reached the compressive strength of the column.
Yong-Ho Kwon;Jae-Jun Kim;Suk-Hee Han;Jin-Sik Kim;Yoon-Sun Lee
국제학술발표논문집
/
The 2th International Conference on Construction Engineering and Project Management
/
pp.459-468
/
2007
The u-City construction project has become a hot topic in the construction market because it seems economic value-added field for construction firms. However, construction firms don't willingly participate in the u-City construction market because environments of the future business for the u-City are very uncertain. Scenario planning is a very powerful method in managing this uncertain planning situation and is based on scenarios that help each enterprise appropriately adapt itself to its own business environments. Therefore it is based on the main principles of systems thinking and multiple futures. For the purpose of dealing with such uncertainties, this paper attempts to develop the possible market scenarios of the u-City construction market in S.Korea through a scenario planning approach. From this perspective, we considered various aspects of the u-City construction such as market demands, technology development, policy level and management environment. After considering the relevant issues, we identified the main trends and key uncertainties. Finally, we developed three coherent u-City construction market scenarios. Construction firms can use these scenarios as a basic reference for market analysis and business strategy. Therefore, this paper is able to enhance the participation of construction firms in the u-City construction market.
Ho Myun Jang;Kyong Hoon Kim;Sang Hyeon Kim;Kyung Hwan Kim;Jae Jun Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.983-989
/
2009
This study aims to systematically identify direct and indirect factors that influence labor productivity and to build a model that mathematically quantifies them so as to efficiently manage and increase labor productivity in the construction work. This study was performed based on the productivity model for workers in reinforced concrete construction projects, because it aims to establish a general construction labor productivity model that reflects many factors that influence labor productivity. Using statistical analysis, we found that the components that significantly influence productivity were the worker component, the work characteristic component, the work technique component, the work management component, the equipment & materials component, and the work guide component, while the work delay components did not significantly influence productivity. In addition, a priority analysis was performed based on the components that showed statistically significant effects. The results of the analysis indicated that the influence of work management component and the work technique component is more than that of the worker component and the work characteristic component. The construction labor productivity model that was formulated in this study could be used for the determining the standard productivity during the initial planning stage, so the best strategy for increasing labor productivity could be formulated.
Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.1150-1153
/
2005
The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.
Kim, Minjung;Park, Moonseo;Lee, hyun-soo;Lee, Dowan;Lee, seul bi
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.602-603
/
2015
Despite all efforts to reduce construction disaster, construction site accident rate has steadily increased in Korea since 2008. As a different approach from traditional research, there is a growing issue about design for safety concept to prevent construction disaster. The notion is that construction worker's safety need to be considered at design phase, not only at construction phase. Globally, the notion has been noted that to improve the safety of the worker and used in practice. However, in Korea, most of safety management guidelines are limited to construction phase. From recent statistics, only 1.4 percent of designer feel responsible for safety accident at construction site. In this circumstance, this research find out safety guidelines through literatures reviews and practical experience of safety management in other country which apply design for safety concept. Selected guidelines are verified by survey which is evaluated with risk, function, cost, time and aesthetic view categories. Through the survey, define guidelines which could be effectively applied in Korea. By using proposed safety guidelines for design phase, preventing construction accident and improving designer's recognition of safety issue at design phase are expected.
The 8th International Conference on Construction Engineering and Project Management
/
pp.417-422
/
2020
Vast quantities of environmental pollutants from construction projects are causing significant damage to nearby local communities and thus generate environmental complaints. The construction company, responsible for compensating and resolving environmental complaints, suffers economic damages due to additional expenditures and schedule delays in construction projects. Meanwhile, the construction industry can stagnate from a broader perspective. Therefore, this study aimed to propose a framework for developing an automated management system which consists of two models for environmental complaints in construction projects: (i) the prediction model: a model for predicting environmental complaints based on factors related to environmental complaints; and (ii) the prevention model: a model for providing construction companies with the optimal prevention measure to effectively prevent environmental complaints according to the results of the prediction model. In addition, the algorithm for integrating the developed models into the management system in construction projects was proposed. Eventually, the application of the management system to construction projects can ensure the profitability of construction companies and mitigate damage from environmental pollutants to the nearby local community.
The 6th International Conference on Construction Engineering and Project Management
/
pp.654-655
/
2015
In construction industry, while requiring advanced knowledge of technicians through a long experience, there is a problem with the tacit knowledge is not carried on the inner organization. Recent technological developments allow sharing and application of the tacit knowledge while technology tools use the CoP(Community of Practice) that mainly interacts between people. Clearly, the most consideration in stimulating CoP is the circulation of knowledge, namely the willingness to share and use knowledge with others. It is then important to explain why individuals factors to share and use knowledge with others when they have a choice. In this paper, we would like to report to find out about factors whether people are actually sharing and using the knowledge obtained in CoP. The results help to analyze which factors are influenced to be a successful CoP in construction industry. The implications for theory and future research direction are discussed.
J.L. Park;S.S. Kim;D.J. Kwark;J.G. Park;J.H. Kim;J.J. Kim
국제학술발표논문집
/
The 5th International Conference on Construction Engineering and Project Management
/
pp.315-320
/
2013
The aim of this study is to compare efficiency and Total Factor Productivity(TFP) between Korean and Japanese construction firms in Korea and Japan over the period of 2005-2011. The results of this study are as follows. Efficiency scores of Korean construction firms are 0.797, and Japanese construction firms are 0.921. Second, annual total factor productivity growth of Korean construction firms is 0.5% and technical progress do much for TFP decrease. However Japanese construction firms marked annual increasing of 2.5% of TFP. Third, technical progress contributed in TFP increase of construction firms in Korea. Korean construction firms, however, relatively lagged behind Japanese construction firms in technical progress. Therefore, Korean construction firms need strategies to achieve technical advances including adopting new technology or process innovation to maintain competitiveness, survive, and develop in the future competition with Japan.
Kim, Min Sook;Lee, Young Hak;Kim, Heecheul;Scanlon, Andrew;Lee, Junbok
Structural Engineering and Mechanics
/
제38권4호
/
pp.459-477
/
2011
Due to the low elastic modulus of FRP, concrete members reinforced with FRP rebars show greater deflections than members reinforced with steel rebars. Deflection is one of the important factors to consider the serviceability of horizontal members. In this study flexural test of AFRP reinforced concrete beams was performed considering reinforcement ratio and compressive strength as parameters. The test results indicated that flexural capacity and stiffness increase in proportion to the reinforcement ratio. The test results were compared with existing proposed equations for the effective moment of inertia including ACI 440. The most of the proposed equations were found to over-estimate the effective moment of inertia while the equation proposed by Bischoff and Scanlon (2007) most accurately predicted the values obtained through actual testing.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.