• Title/Summary/Keyword: architectural drawing management

Search Result 55, Processing Time 0.023 seconds

A Study on Post Occupancy Evaluation about the Community Facilities of a Rental Apartment - Focus on the 4 Apartment Built in Pangyo after 2009 - (임대 아파트 내 커뮤니티시설의 거주 후 평가에 대한 연구 - 2009년 이후 신축된 판교 4개 아파트를 중심으로 -)

  • Kim, Min-Gyu
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.2
    • /
    • pp.59-66
    • /
    • 2018
  • The purpose of this study is to investigate the method on improving the frequency of use and satisfaction rate of the community facilities and to evaluate relation between improving the frequency of use and satisfaction rate of the community facilities and improving the sense of community in apartments. The research subjects of this study is the four public lease apartments which is built around same period with same design guide. The survey method is a questionnaire survey, a experimental study, focus group interview, an analysing drawing. The result of study is as follows. The first, the frequency of use and satisfaction rate have been effected by the operation management system as well as the physical circumstance. The second, The frequency of use and satisfaction rate of the community facilities have had positive correlation with sense of community. The third, multimedia room and conference room with low usability need to change a multipurpose space such as cafe, classroom for learning on artistic topic with high demand from occupant. Finally, a mindset shift is required for architects to inspire community facilities as an important mediated space improving the sense of community by suggesting spaces for leisure and hobby activities.

A study on CAD-work Standardization of design practical field - centering drawing management system - (디자인 실무를 위한 캐드작업 표준화 연구 1 - 도면관리체계를 중심으로 -)

  • 홍관선;김석태
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2002.04a
    • /
    • pp.111-115
    • /
    • 2002
  • CAD System, which has been actively applied since late 80's, has become one of the most important tools in architectural design and has taken the central position in practical design processes. However, it is widely known that AutoCAD, the market-leading general-use CAD System, resulted in hindering the standardization of CAD System. This has been causing problems in communication among designers and inefficiency in their uses. The standardization in CAD System becomes an urgent issue. The study attempts to build up fundamental principles in standardization of CAD System, and to suggest a combinational model of international and domestic standards.

  • PDF

A Study of the Establishment of Small and Medium Sized Architectural Design Firm BIM Environment based on Virtual Desktop Infrastructure (가상 데스크톱 인프라(VDI) 기술을 활용한 중소규모 설계사의 BIM 사용자 별 데스크탑 자원 할당 전략에 관한 연구)

  • Lee, Kyuhyup;Shin, Joonghwan;Kwon, Soonwook;Park, Jaewoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.78-88
    • /
    • 2016
  • Recently BIM technology has been expanded for using in construction project. However its spread has been delayed than the initial expectations, due to the high-cost of BIM infrastructure development, the lack of regulations, the lack of process and so forth. In design phase, especially, collaboration based on BIM system has being a key factor for successful next generation building project. Through the analysis of current research trend about IT technologies, virtualization and BIM service, data exchange such as drawing, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. In various industrial fields, cloud computing technology is utilized as a promising solution which can reduce time and cost of hardware infrastructure. Among the cloud computing technology, VDI is receiving a great deal of attention from it market as an essential part cloud computing. VDI enables to host multiple individual virtual machines by using hypervisor. It has an advantage to easy main device management. Therefore, this study implements a step-by-step user's DaaS by analyzing the desktop resource data of the workers from Pre-design phase to Schematic design, Design develop and Construction design phase. It also develops BIM environment based on test of BIM modeler and designers in architectural design firm. The goal of the study is to enable the cloud computing BIM server. It provides cost saving, high-performance quality of working environment and cooperation's convenience and high security when doing BIM work in small and medium sized architectural design firm.

A Study on the Landscape Planning Evaluation on Apartment Artificial Ground (아파트 단지 인공지반의 계획적 평가에 관한 연구)

  • 김유일;오정학;김인혜;윤홍범
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.3
    • /
    • pp.297-311
    • /
    • 1998
  • Landscaping on artificial ground is currently served as a means to imposing a greenery benefit on high-density and high-rise apartment sites. It functions as a sub-hierarchy in apartment planning such as ornamental element from the past. Major parking space tends to be allocated on the basement area in response to the required parking regulation. Therefore, competitive relatioinship between the parking and greenery space I limited outdoor of apartments leads to the development planning strategy and technology of artificial ground. This study aims at evaluating landscape planning on artificial ground of apartment complex through several approaches such as site survey, plan drawing analysis, and interview with related field experts. 15 survey apartment sites including Bundang Model, Shindaebang-dong, Pyoungchon Hyundai Apartments have been selected for conducting the research. Main results of this study are summarized below : First, scattering allocation of artificial ground between apartment building units is a dominant plan layout type among the survey sites. Even though unifying allocation type has an advantage to maximize underground parking space, it has a difficulty in maintaining proper soil ground base for nurturing plants. Therefore, underground parking space should be planned by unifying allocation type placed separately from apartment units. This plan type can provide a balanced planting between soil and artificial ground on surface level. Second, It is strongly recommended to integrate the whole planting base which involves architectural structure, drainage, and water proofing above the planting design. When considering that process as a professional subject dealing with natural material such as trees and shrubs, those tasks should be directed by landscape architectural divison and landscape architect. And planting area for artificial ground has to be specified in initial phase of architectural design. This step provides an opportunity to make a proper decision on structural load, drainage, and water proof design as an integrated part of the management.

  • PDF

A Study on BIM Implementation Process Model through Importing Vertex Coordinate Data for Customized Curtain Wall Panel - Focusing on importing Vertex Coordinate data to Revit from Rhino - (맞춤형 커튼월 패널의 꼭짓점 좌표데이터 전이를 통한 BIM 형태 구축 프로세스 모델 연구 - 라이노에서 레빗으로의 좌표데이터 전이를 중심으로 -)

  • Ko, Sung Hak
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.11
    • /
    • pp.69-78
    • /
    • 2019
  • The purpose of this study is to propose a modeling methodology through the exchange of coordinate data of a three-dimensional custom curtain wall panel between Rhino and Revit, and to examine the validity of the model implemented in the drawing. Although the modeling means and method are different, a fundamental principle is that all three-dimensional modeling begins by defining the position of the points, the most primitive element of geometry, in the XYZ coordinate space. For the BIM modeling methodology proposal based on this geometry basic concept, the functions and characteristics associated with the points of Rhino and Revit programs are identified, and then BIM implementation process model is organized and systemized through the setting of the interoperability process algorithm. The BIM implementation process model proposed in this study is (1) Modeling and panelizing surface into individual panels using Rhino and Grasshopper; (2) Extraction of vertex coordinate data from individual panels and create CSV file; (3) Curtain wall modeling through Adaptive Component Family in Revit and (4) Automatic creation of Revit curtain wall panels through API. The proposed process model is expected to help reduce design errors and improve component and construction quality by automatically converting general elements into architectural meaningful information, automating a set of processes that build them into BIM data, and enabling consistent and integrated design management.

BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures (철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립)

  • Joo, Seon U;Kim, Chee-Kyeong;Kim, Si-Uk;Noh, Jun-Oh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The object of this research is an establishment of BIM-based quantity takeoff(QTO) and cost estimation guidelines for reinforcement concrete structures focused on improvement of field applicability in transition period from 2D drawing-based environment to 3D BIM-based environment. Preliminary studies on existing guidelines and standards for BIM modeling, QTO and cost estimation of reinforcement concrete structures are performed, and then a standardization of BIM-based cost estimation process is proposed through comparative analysis between 2D drawing-based cost estimation process and 3D BIM-based. In addition, modeling, QTO, and cost estimation processes of cost-BIM model for RC structures are conducted. The contributions of this research and the guidelines suggested by this research are 1) lowering barriers to entity to the new BIM-based environment for small size companies, 2) reducing construction cost by a close estimate, 3) establishing the foundation for integrated management of informations through construction project life cycle, 4) and ultimately, developing the BIM ecosystems.

A Fundamental Study on the Classification Criteria and Properties by Detail Type of Archival Information on Architectural Heritage of Korea (건조물 문화재 기록정보의 유형 구분 기준과 세부유형별 속성에 관한 기초 연구)

  • Lim, Cholong;Joo, Sanghun
    • Korean Journal of Heritage: History & Science
    • /
    • v.53 no.2
    • /
    • pp.88-109
    • /
    • 2020
  • This study aimed to distinguish categories of archival information and identify properties by their detail types, so that the various forms of architectural heritage information generated can be managed based on their attributes and characteristics. First, the specific uses of terms in the legal system were reviewed and their associated concepts specifically defined. "Architectural heritage" was defined as architecture belonging to the category of tangible cultural heritage as designated by law, and "architectural heritage archival information" was defined as all kinds of material expressed by electronic processing of the actual status for preservation and management. Next, the production status of architectural heritage archival information was reviewed in relation to the legal system. This confirmed that relevant legal systems were organized hierarchically and that various types of archival information were generated in a single project. Furthermore, it was confirmed that even archival information produced in the same form contained differing contents depending on the specific purpose and method, and that there was no classification by which to cover all archival information. Finally, it was also confirmed that detailed drawing types could be categorized according to the purpose of production and the target of the records. Based on the findings of this review, the type and properties of archival information were presented as the primary classification criteria, and the architectural heritage archival information was divided into 6 general types and 27 detailed types. Specifically, the linguistic form, dimension, temporal property, and graphic form of archival information were applied as criteria for the classification of general types, and the target, production purpose, production method of archival information, and content characteristics of archival information properties of archival information by type were comprehensively reviewed.

A Study on Construction Site of Virtual Desktop Infrastructure (VDI) System Model for Cloud Computing BIM Service

  • Lee, K.H.;Kwon, S.W.;Shin, J.H.;Choi, G.S.;Moon, D.Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.665-666
    • /
    • 2015
  • Recently BIM technology has been expanded for using in construction project. However its spread has been delayed than the initial expectations, due to the high-cost of BIM infrastructure development, the lack of regulations, the lack of process and so forth. In construction site phase, especially the analysis of current research trend about IT technologies, virtualization and BIM service, data exchange such as drawing, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. The purpose of this study is enable the cloud computing BIM server to provide several main function such as edit a model, 3D model viewer and checker, mark-up, snapshot in high-performance quality by proper design of VDI system. Concurrent client connection performance is a main technical index of VDI. Through test-bed server client, developed VDI system's multi-connect control will be evaluated. The performance-test result of BIM server VDI will effect to development direction of cloud computing BIM service for commercialization.

  • PDF

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.

Development of Collaboration and Communication Platform based on Contents for an Efficient Task Management in Construction Project (건설 프로젝트 업무관리 효율화를 위한 콘텐츠기반 협업 플랫폼 개발)

  • Kim, Seong-Ah;Jung, Choong-Won;Kim, Nam-Ho;Choi, Cheol-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.98-107
    • /
    • 2016
  • An information system in a construction project has been typically used for drawing, document management, and administration process. And it has limitations to support real-time communication and collaboration among project stakeholders. The objective of this research is to improve communication, information share, and task management by developing a collaboration platform among project stakeholders supporting various communication methods and contents. The platform developed in this research, named as CCP, aims to support communication and collaboration related activities beyond the scope of legacy systems at construction sites. CCP was validated through pilot test and user survey, and it was found to be very helpful for sharing and distributing information, tracking and recording, and improving a user's work capability.