• Title/Summary/Keyword: architectural construction work

Search Result 626, Processing Time 0.02 seconds

Recognition of Stakeholders Regarding Building-Related Landscape Systems (대지의 조경 제도에 대한 관련 주체의 인식 비교 분석)

  • Kim, Yong-Gook;Lee, Sang-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.79-91
    • /
    • 2018
  • This study proposes the difference of awareness and improvement plan of building-related landscape systems through a cognition survey of building owners, public officials, and experts. The main results are as follows. First, all three groups are highly aware of the need to secure urban green spaces. Even if private property rights are restricted, the level of awareness that green space should be secured for public benefit is high. The level of interest in the building-related landscape system was also surveyed to a greater degree. Second, the survey respondents, including the building owner group, answered that there is a need to strengthen the building-related landscape area standards. It can be seen that there is a need to revise the relaxation of the building-related landscape area standards through an amendment of the Building Ordinance in many local governments. Third, most municipalities are not equipped with an organizational system that can promote the work of building-related landscape. It is necessary to newly hire civil servants for landscape design, maintenance, and management specialization, or to expand co-working relationships with related departments. Fourth, building owners are interested in building-related landscape, but they do not know specific management methods and leave the landscape space. The municipality needs to offer guidance on landscape architectural design and construction methods that the building owners can easily follow and to support the voluntary landscape space management on the part of the local residents by supporting the trees. Fifth, in order to improve the building-related landscape system, it is necessary to verify the effect of the building-related landscape and spread a consensus. At the government level, in order to enable building owners to recognize the value of the landscape space in connection with an urban regeneration project, it is necessary to present an example of an excellent building-related landscape installation via a pilot project.

Development for prediction system of TBM tunnel face ahead using probe drilling equipment and drilled hole imaging equipment (선진시추장비와 시추공벽 영상화 장비를 이용한 TBM 전방 지반평가시스템 개발)

  • Kim, Ki-Seog;Kim, Jong-Hoon;Jeong, Lae-Chul;Lee, In-Mo;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.393-401
    • /
    • 2015
  • In the construction of a TBM tunnel, it is very important to acquire accurate information of the excavated rock mass for an efficient and safe work. In this study, we developed the prediction system of TBM tunnel face ahead using probe drilling equipment and drilled hole imaging equipment to predict rock mass conditions of the tunnel face ahead. The prediction system consists of the probe drilling equipment, drilled hole imaging equipment and analysis software. The probe drilling equipment has been developed to be applicable to both non-coring and coring. Also the probe drilling equipment can obtain the drilling parameters such as feed pressure, torque pressure, rotation speed, drilling speed and so on. The drilling index is converted to the drilling index RMR through the correlation between a drilling index and core RMR. The developed system verification was carried out through a slope and tunnel field application. From the field application result, the non-coring is four times faster than a coring and the drilling index RMR and core RMR are similar in the distribution range. This system is expected to predict the rock mass conditions of the TBM tunnel face ahead very quickly and efficiently.

Case Study on Engineering Camp Program involving Engineering Design Activity and Intra-/Inter-Team Works for High School Students: Plant factory as main theme (공학설계활동과 팀 내, 팀 간 협력 기반 고등학생 공학 캠프 프로그램 운영 사례: 식물공장을 주제로)

  • Cho, Kyung-Suk
    • Journal of Engineering Education Research
    • /
    • v.18 no.3
    • /
    • pp.46-58
    • /
    • 2015
  • Informal engineering education program for high school students was developed to cultivate engineering literacy using the human resources and facilities of university. Plant factory, a smart farming technology, was selected as a main theme, and the novel engineering camp program involving engineering design activities and intra-linter-team works was planned. The camp program was applied to 38 high school students in an active learning classroom. Five teams were constructed according to elemental technologies such as biotechnology, information-communication technology, energy engineering, mechanical engineering and architectural engineering, and the students were participated in intra- and inter-team activities to achieve the final goal of 'the construction of a plant factory in school'. The team works were conducted according to the eight steps of engineering design process (identifying the problem and need, identifying criteria and constraints, brainstorming possible solutions, selecting the best possible solution, constructing a prototype, testing and evaluating the solution, communicating the solution, and refining design). Participants' satisfaction survey showed that the satisfaction on the contents of engineering design was 4.48 on 5-point Likert scale. The participants' satisfaction on creative activity and systematic methodology was 4.43 on 5-point Likert scale. 97% of participants responded positively to team works, and 92% of participants were satisfied with career mentoring activity supplied by undergraduate/graduate students. These results indicates that the engineering camp program involving engineering design activity and intra-/inter-team works can contribute to cultivate engineering literacy such as creativity, problem solving ability, collaboration, communication skills for high school students, and to increase their interests in engineering fields.

Modular Building for Urban Disaster Housing: Case Study of Urban Post-Disaster Housing Prototype in New York

  • Ford, George;Ahn, Yong Han;Choi, Don Mook
    • Fire Science and Engineering
    • /
    • v.28 no.6
    • /
    • pp.82-89
    • /
    • 2014
  • Disasters that destroy homes and infrastructure and cause significant financial damage are becoming more common as population centers grow. In addition, several natural disasters have resulted in a major loss of life and created countless refugees due to damage to housing. After major catastrophic disasters, it is very important that the government agencies respond to post-disaster housing issues and provide resources such as temporary housing before the full rehabilitation and reconstruction of destroyed and damaged housing. To provide affordable temporary housing for residents who may lose their homes as the result of a catastrophic disaster including storms, government agencies must develop a post-disaster housing prototype. In general, government agencies should explore several different forms of factory-built single-story, single family housing, such as modular homes, panelized homes, and precut homes. In urban cities including New York and Seoul, it is very important to provide housing which supports the demand for higher-density living spaces than single-family homes or trailers typically available due to the high population density and the desire to resettle as many residents as possible in their former neighborhoods. This study identified the urban post-disaster housing prototypes that may provide higher density housing with high quality living spaces, high air quality, and energy efficiency as well as rapid deployment. A case study of "Urban Post-Disaster Housing Prototype Program in New York" was conducted through a detailed interview process with a designer, engineer, contractor, the Office of Emergency Management (OEM) in New York, the U.S. Army Corps of Engineers (USACE), and temporary occupants. An appropriate disaster housing program that can provide living spaces for victims of disasters that keeps residents in their community and allows them to live and work in their neighborhoods was developed.

Development of 3-Dimensional Rebar Detail Design and Placing Drawing System (3차원 배근설계 및 배근시공도 작성 자동화 시스템 개발)

  • Choi, Hyun-Chul;Lee, Yunjae;Lee, Si Eun;Kim, Chee Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.4
    • /
    • pp.289-296
    • /
    • 2014
  • The rebar detailing is an important work influencing the final performance and quality of RC structures. But it is one of the most irrational and illogical activity in construction site. Many groups of workers, including main contractors, structural engineers, shop drawers, rebar fabricators, and etc., participate in this activity. A loosely-organized process for this activity is apt to produce a big amount of rebar loss or even degraded structures. A 3-dimensional rebar auto-placing system, called as Rebar Hub, has been designed and implemented in this research. Rebar Hub provides a totally integrated service from 3D structural modeling of buildings to rebar auto-placing considering anchorage, splice, and the length of ordered rebar. In addition, Rebar Hub can recognize the 2D drawing CAD files and then build 3D structural models which are used for the start point of 3D rebar auto-placing. After rebar auto-placing, each members of the 3D structural model have rebar information belonging to them. It means that the rebar information can be used for the afterward works such as quantity-survey, manufacturing and fabrication of rebars. Rebar Hub is showing outstanding performance while applying to practical projects. It has almost five times productivity and reduces the rebar loss up to 3~8% of the initially-surveyed amount of rebar.

A study on the structure of the Three storied Stone pagoda in Gameunsa Temple site (감은사지 삼층석탑 구조)

  • Nam, si-jin
    • Korean Journal of Heritage: History & Science
    • /
    • v.38
    • /
    • pp.329-358
    • /
    • 2005
  • The Three storied Stone pagoda in Gameunsa Temple site, one of the early staged stone pagodas, has been known as a standard for Silla stone pagodas. A stone pagoda is not only a stone art work and but also a stone structure. Most studies and investigation of the stone pagoda has done mainly based on style and chronological research according to an art historical view. However, there is not an attempt to research the stone pagoda as a stone architecture. Most Korean experts at the stone pagoda has art history in their background. Engineers who can understand the structure of the stone pagoda are very limited. More architectural and engineering approach is need to research not only art historial understanding but also safety as a structure. We can find many technical know-how from our ancestors who made stone pagodas. 1. To reduce any deformation such as relaxation and sinking of BuJae which is caused by a heavy load, the BuJae (consist of a foundation stone and lower stereobates) should be enlarged. 2. A special construction method for connection between Myonsuk and Tangjoo was invented. This unique method is not used any longer after the Three storied Stone pagoda in Gameunsa Temple site. 3. The upper BuJae and the lower BuJae are missed each other by making a difference of Okgaesuk and Okgaebatchim in size. It is done for a distribution of perpendicular load and a prevention for relaxation of BuJae. 4. The center of gravity in the BuJae is located to the center of the stone pagoda by trimming the upper surface of the Okgaebatchim into a convex shape. The man who made stone pagodas had excellent knowledge on the engineering and techniques to understand the structure of the stone pagodas. We can confirm it as follows: the enlarged BuJae, dislocated connection between upper Bujae and lower BuJae, and moving the center of gravity close to the center of the stone pagoda.