• 제목/요약/키워드: approximate construction cost

검색결과 59건 처리시간 0.029초

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

AN APPROXIMATE COST ESTIMATING MODEL FOR CONSTRUCTION PROJECTS

  • Daehee Lim;Seung-hoon Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1242-1247
    • /
    • 2009
  • The sudden changes in the construction market and the progressively intensifying price wars have amplified the importance of the construction cost estimation in the initial and planning phases of construction projects. However the methodologies and process of estimating construction cost in the planning and design phase are not standardized in the domestic market, in contrast to the markets of more developed countries. Therefore this paper proposes a new approximate estimation model to be used from the initial stages of construction projects. This methodology that extracts, modifies and synthesizes comparable elements of previous cases. This will introduce the foundation for the implementation of systems with improved usability and applicability.

  • PDF

사례기반추론을 이용한 강박스거더교의 개략공사비 산정 및 검증 (Computation and Verification of Approximate Construction cost of Steel Box Girder Bridge by Using Case-Based Reasoning)

  • 정민선;경갑수;전은경;권순철
    • 한국강구조학회 논문집
    • /
    • 제23권5호
    • /
    • pp.557-568
    • /
    • 2011
  • 공공 건설공사에서 공사 단계별 합리적인 공사비를 산정하는 것은 국가 예산의 효율적 확보 및 집행 등에 있어 매우 중요한 요소이다. 본 논문에서는 사업 초기단계의 가용정보가 제한된 조건에서 사례기반을 적용하여 강박스거더교의 개략공사비 추정 방안을 제시하였다. 또한 공사비 예측모델을 기존 설계사례에 대해 적용하여 본 논문에서 제시한 개략공사비 추정 모델의 정확성을 검증하였다. 연구 결과, 오차율은 비교적 안정적인 결과를 도출할 수 있었다. 따라서 국가 예산의 집행이나 수립에서 개략공사비 추정을 효율적으로 제시 할 수 있을 것으로 판단된다.

하천시설물 공사의 기획단계 개략공사비 산정체계 개발 (Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage)

  • 신정민;우성권;이시욱;김옥기
    • 대한토목학회논문집
    • /
    • 제28권3D호
    • /
    • pp.371-381
    • /
    • 2008
  • 국내 하천시설물 건설공사는 도로 등의 다른 토목시설공사에 비해서 사업의 금액규모가 상대적으로 작다는 등의 특성으로 인해 사업의 기획 및 계획단계에서의 개략적인 공사비용을 예측하는 기준 단가가 정립되어 있지 않으며, 시설물의 특성을 고려한 합리적이고 체계적인 견적 방법론 또한 존재하지 않는다는 문제점을 가지고 있다. 본 연구는 하천시설물 건설공사의 실적자료를 수집하고 분석하여, 4단계로 이루어진 하천 제방공사 실적정보 구성 체계를 제시하고, 공사비에 영향을 끼치는 인자들을 주요 공종별로 도출하여, 하천시설물 공사의 기획단계에서 적정한 개략공사비를 산정하는 체계적인 방법론을 제시한다.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Integrating Deep Learning with Web-Based Price Analysis to Support Cost Estimation

  • Musa, Musa Ayuba;Akanbi, Temitope
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.253-260
    • /
    • 2022
  • Existing web-based cost databases have proved invaluable for construction cost estimating. These databases have been utilized to compute approximate cost estimates using assembly rates, unit rates, and etc. These web-based databases can be used independently with traditional cost estimation methods (manual methods) or used to support BIM-based cost estimating platforms. However, these databases are rigid, costly, and require a lot of manual inputs to reflect recent trends in prices or prices relative to a construction project's location. To address this gap, this study integrated deep learning techniques with web-based price analysis to develop a database that incorporates a project's location cost estimating standards and current cost trends in generating a cost estimate. The proposed method was tested in a case study project in Lagos, Nigeria. A cost estimate was successfully generated. Comparison of the experimental results with results using current industry standards showed that the proposed method achieved a 98.16% accuracy. The results showed that the proposed method was successful in generating approximate cost estimates irrespective of project's location.

  • PDF

사례기반추론을 이용한 개략공사비 산정모델 개발 - PSC BEAM교를 중심으로 - (Approximate Estimating Model Using the Case Based Reasoning - PSC BEAM Bridge -)

  • 강찬성;이건희;김경민;김경주
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.445-448
    • /
    • 2008
  • 국내 도로건설사업에 있어서 개략공사비 산정 기준은 건설교통부 및 기획예산처, 한국도로공사 등에서 제시하는 평균 건설단가를 기준으로 활용하고 있다. 이때 도로의 등급, 구조물 추간의 구성 비율 등에 따라 공사비를 도정하고 있으나 다양한 공사 특성을 반영하고, 지속적인 공사비 갱신의 기준 등에 한계를 가지고 있다. 대규모 재원이 투입되는 건설공사의 공사비를 합리적인 방법으로 적정하게 예측하는 것은 사업비 관리 측면에서 필수적인 요소는 기술이라 할 수 있다. 본 연구에서는 기획단계에서 가용한 정보를 활용하여 공사비를 예측할 수 있는 사에 기반추론 PSC BEAM교의 개략공사비 산정모델을 개발하였다. 제시된 공사비 예측모델을 검증하기 위하여 표본교량을 대상으로 공사비를 추정한 결과 $-11.92%{\sim}3.20%$의 추정편차를 나타내었으며, 기존 개략공사비 산정 기준에 비해 신뢰도가 향상되었다.

  • PDF

사업 수행 단계별 강박스거더교 공사비 산정 모델 제시 및 검증 (Suggestion and Verification of Assessment model on Construction Cost of Steel Box Girder Bridge in Project Performance Phases)

  • 전은경;경갑수;박진은;강신화
    • 한국강구조학회 논문집
    • /
    • 제22권1호
    • /
    • pp.55-65
    • /
    • 2010
  • 공공 건설공사에서 공사 단계별 합리적인 공사비를 산정하는 것은 국가 예산의 효율적 확보 및 집행 등에 있어 매우 중요한 요소이다. 일반적으로 공사예정가격은 대상 구조물의 설계 종료시점에서 산출된다. 그러므로 대상 구조물의 구체적인 상세 단면이 주어지지 않은 기획단계 및 설계초기단계에서 교량 구조물에 대한 단순 정보만을 가지고 개략공사비를 추정하는 것은 상당히 어려운 문제일 것으로 생각된다. 본 연구에서는 선행연구에서의 61개의 강박스거더교 공사비 분석에 의해 효율적이고 적절한 기획단계 및 설계초기단계의의 개략공사비 산정 모델의 제시 및 타당성을 검증하고자 한다. 연구결과, 본 연구에서 제시된 공사비 산정 모델에 의해 얻어진 추정공사비는 기존에 사용된 방법과 비교할 때 매우 높은 신뢰도를 갖는 것을 알 수 있었다.

사무소 건물의 HVAC&R 시스템 공사비 분석방법 및 예측에 관한 연구 (Cost Analysis Study : Development of HVAC&R System Cost Estimation and Prediction Methodology for Office Buildings)

  • 조진균;신승호;김종헌
    • 설비공학논문집
    • /
    • 제26권3호
    • /
    • pp.115-121
    • /
    • 2014
  • HVAC&R system costs can often be one of the most expensive components, representing approximately 15% of the total construction cost for office buildings. Despite their significant importance, there is a lack of a consistent and homogeneous framework to approximate the estimate research. This research deals with the prediction methodology of HVAC&R system cost with the aim of establishing a common idea for the analysis of the construction cost estimate. Our approach deals with the concept of an HVAC&R set that is composed of subsystems. The matrix combination analysis is examined, and total 960 HVAC&R system cost estimation can be implemented to large scale office buildings.