• 제목/요약/키워드: application service quality

Search Result 901, Processing Time 0.024 seconds

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.