• Title/Summary/Keyword: and Scheduling

Search Result 4,700, Processing Time 0.039 seconds

SCHEDULING TECHNIQUE FOR CONTROL STEP (스케듈링 기법 연구)

  • JeongYoungSong;NamWooBack
    • Journal of the Korean Geophysical Society
    • /
    • v.4 no.3
    • /
    • pp.163-173
    • /
    • 2001
  • This paper deals with scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informaion trom the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth - order elliptic wave filter of a standard benchmark moedl, and then it is drawing up T.N matrix table by the number resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource th use this table. All of existing list scheduling techniques determine the priority function first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Distributed opportunistic packet scheduling for wireless ad-hoc network (무선 에드혹 네트워크에서 분산화된 opportunistic 패킷스케줄링)

  • Park, Hyung-Kun;Yu, Yun-Seop
    • Proceedings of the IEEK Conference
    • /
    • 2009.05a
    • /
    • pp.204-206
    • /
    • 2009
  • Opportunistic scheduling is one of the important techniques to maximize multiuser diversity gain. In this paper, we propose a distributed opportunistic scheduling scheme for ad-hoc network. In the proposed distributed scheduling scheme, each receiver estimates channel condition and calculates independently its own priority with probabilistic manner, which can reduce excessive probing overhead required to gather the channel conditions of all receivers. We evaluate the proposed scheduling using extensive simulation and simulation results show that proposed scheduling obtains higher network throughput than conventional scheduling schemes and has a flexibility to control the fairness and throughput by controlling the system parameter.

  • PDF

Scheduling Technique for Control Step (제어구간에 의한 스케듈링 기법)

  • Song, Jeong-Young;Back, Nam-Woo
    • The Journal of Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.35-45
    • /
    • 2002
  • This paper deals with the scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informations from the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth – order elliptic wave filter of a standard benchmark model, and then it is drawing up T.N matrix table by the number of resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource to use this table. All of existing list scheduling techniques determine the priority functions first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

A Study on Memetic Algorithm-Based Scheduling for Minimizing Makespan in Unrelated Parallel Machines without Setup Time (작업준비시간이 없는 이종 병렬설비에서 총 소요 시간 최소화를 위한 미미틱 알고리즘 기반 일정계획에 관한 연구)

  • Tehie Lee;Woo-Sik Yoo
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.1-8
    • /
    • 2023
  • This paper is proposing a novel machine scheduling model for the unrelated parallel machine scheduling problem without setup times to minimize the total completion time, also known as "makespan". This problem is a NP-complete problem, and to date, most approaches for real-life situations are based on the operator's experience or simple heuristics. The new model based on the Memetic Algorithm, which was proposed by P. Moscato in 1989, is a hybrid algorithm that includes genetic algorithm and local search optimization. The new model is tested on randomly generated datasets, and is compared to optimal solution, and four scheduling models; three rule-based heuristic algorithms, and a genetic algorithm based scheduling model from literature; the test results show that the new model performed better than scheduling models from literature.

QoS-based Scheduling Algorithm for ATM in the Broadband Access Networks (가입자망에서의 서비스 품질 기반ATM 스케줄링 알고리즘)

  • 정연서;오창석
    • Journal of the Korea Society of Computer and Information
    • /
    • v.6 no.1
    • /
    • pp.67-73
    • /
    • 2001
  • This paper proposes a new scheduling algorithm for broadband ATM access network. The existed scheduling algorithms (Train, Chao. Dynamic scheduling algorithm) have high cell loss rate and waste channel. These proposed mechanism utilize to control of multimedia services based on the quality of service level of the input traffic This paper suggests a functional architecture of scheduling and the scheduling algorithm to satisfy various QoS requirements. The performance measures of interest, namely steady-state cell loss probability and average delay, average delay, are discussed by simulation results.

  • PDF

Real-Time DBR Scheduling in Internet Based Make-to-Order Manufacturing (인터넷을 통한 주문생산환경에서의 실시간 생산 DBR 스케줄링)

  • Han, Young-Geun;Kim, Yeon-Kyun
    • IE interfaces
    • /
    • v.14 no.4
    • /
    • pp.341-347
    • /
    • 2001
  • This paper describes a real-time manufacturing scheduling system on Internet using DBR(Drum-Buffer-Rope) scheduling method. We intend to change company-oriented manufacturing scheduling, which has been used at most manufacturing companies, to customer-oriented manufacturing scheduling. Customers can not only choose product kinds, quantities and order due dates, but also evaluate optimum order due date by themselves in real-time through internet and then the results will be converted into practical manufacturing scheduling. If the company cannot meet the customer order due date, it will offer reliable and accurate information to the customers by suggesting the earliest order due date. To evaluate the customer order due date in real time, companies should be able to estimate their accurate production capacity. This research uses Goldratt's DBR scheduling method to realize that function. The DBR scheduling does not recognize the production capacity of the whole company, but only of the constraint resources which have a great effect on the company throughput. Thus, it can improve the customer service level as well as the profit by performing more dynamic and reliable scheduling through Internet.

  • PDF

Performance Analysis of Group Scheduling for Core Nodes in Optical Burst Switching Networks (광 버스트 스위칭 네트워크의 코어 노드를 위한 그룹 스케줄링 성능 분석)

  • 신종덕;이재명;김형석
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.8B
    • /
    • pp.721-729
    • /
    • 2004
  • In this paper, we applied a group scheduling algorithm to core nodes in an optical burst switching (OBS) network and measured its performance by simulation. For the case of core nodes with multi-channel input/output ports, performance of the group scheduling has been compared to that of the immediate scheduling. Since the group scheduling has a characteristic of scheduling a group of bursts simultaneously in a time window using information collected from corresponding burst header packets arrived earlier to a core node, simulation results show that the group scheduling outperforms the immediate scheduling in terms of both burst loss probability and channel utilization and the difference gets larger as the load increases. Another node configuration in which wavelength converters are equipped at the output ports has also been considered. In this case, even though both performance metrics of the group scheduling are almost the same as those of the immediate scheduling in the offered load range between 0.1 and 0.9, the group scheduling has lower wavelength conversion rate than the immediate scheduling by at least a factor of seven. This fact leads us to the conclusion that the group scheduling makes it possible to implement more economical OBS core nodes.

Service Prediction-Based Job Scheduling Model for Computational Grid (계산 그리드를 위한 서비스 예측 기반의 작업 스케쥴링 모델)

  • Jang Sung-Ho;Lee Jong-Sik
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2005.05a
    • /
    • pp.29-33
    • /
    • 2005
  • Grid computing is widely applicable to various fields of industry including process control and manufacturing, military command and control, transportation management, and so on. In a viewpoint of application area, grid computing can be classified to three aspects that are computational grid, data grid and access grid. This paper focuses on computational grid which handles complex and large-scale computing problems. Computational grid is characterized by system dynamics which handles a variety of processors and jobs on continuous time. To solve problems of system complexity and reliability due to complex system dynamics, computational grid needs scheduling policies that allocate various jobs to proper processors and decide processing orders of allocated jobs. This paper proposes the service prediction-based job scheduling model and present its algorithm that is applicable for computational grid. The service prediction-based job scheduling model can minimize overall system execution time since the model predicts a processing time of each processing component and distributes a job to processing component with minimum processing time. This paper implements the job scheduling model on the DEVSJAVA modeling and simulation environment and simulates with a case study to evaluate its efficiency and reliability Empirical results, which are compared to the conventional scheduling policies such as the random scheduling and the round-robin scheduling, show the usefulness of service prediction-based job scheduling.

  • PDF

Scheduling and simulation for FMC systems (FMC 시스템의 스케쥴링 및 시뮬레이션)

  • 서기성;이노성;안인석;박승규;이규호;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.370-375
    • /
    • 1992
  • This paper deals with the scheduling and simulation for FMC(Flexible Manufacturing Cells). In order to achieve CIM, there is a critical need to link factory level and machine level. The primary functions performed by this link for all jobs issued to the shop floor and cell include short-term scheduling and dynamic operational scheduling. Here, hierarchical control structure is introduced to define these functions. And Intelligent scheduling through expert module is adopted for efficiency of FMC operation. Computer simulation reveals that expert scheduling method is better than heuristics in various performance index.

  • PDF

Dynamic Task Scheduling Via Policy Iteration Scheduling Approach for Cloud Computing

  • Hu, Bin;Xie, Ning;Zhao, Tingting;Zhang, Xiaotong
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.3
    • /
    • pp.1265-1278
    • /
    • 2017
  • Dynamic task scheduling is one of the most popular research topics in the cloud computing field. The cloud scheduler dynamically provides VM resources to variable cloud tasks with different scheduling strategies in cloud computing. In this study, we utilized a valid model to describe the dynamic changes of both computing facilities (such as hardware updating) and request task queuing. We built a novel approach called Policy Iteration Scheduling (PIS) to globally optimize the independent task scheduling scheme and minimize the total execution time of priority tasks. We performed experiments with randomly generated cloud task sets and varied the performance of VM resources using Poisson distributions. The results show that PIS outperforms other popular schedulers in a typical cloud computing environment.