• Title/Summary/Keyword: anchorage length

Search Result 137, Processing Time 0.022 seconds

Experimental Evalution of Structural Behavior on SRC type TEC-BEAM to RC Column Connection (SRC형 TEC-BEAM과 RC기둥 접합부 구조적 거동의 실험적 평가)

  • Ju, Young Kyu;Kim, Do Hyun;Chung, Kwang Ryang;Kim, Sang Dae
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.3
    • /
    • pp.463-470
    • /
    • 2002
  • The TEC-Beam system is a composite beam consisting of structural tee, precast concrete, and cast-in-site reinforced concrete slab. The preliminary test of the proposed system was performed for simple beams, showing good behavior. However, for the field application of the system. TEC-Beam - RC column connection was required to produce a mechanism that transfers the force occurring in the lower part of the TEC-Beam. Thus, this study developed a connection mechanism that transfers the force occurring in the lower part of the TEC-Beam. Thus, this study developed a connection wherein the section of the TEC-Beam was enlarged and the lower part reinforced. Two setups of the proposed system were experimentally investigated. using the anchorage length of reinforcement., i.e., length of the increased section, as test parameter. It could be concluded from the result that the proposed system shows good structural behavior, with potential applicability in the field.

Experimental Study on Effect of Confinement Details for Lap Splice of Headed Deformed Reinforcing Bars in Grade SD400 and SD500 (구속상세가 SD400 및 SD500 확대머리 이형철근의 겹침이음에 미치는 영향에 관한 실험적 연구)

  • Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.1
    • /
    • pp.62-71
    • /
    • 2015
  • KCI 2012 and ACI318-11 contains development length provisions for the use of headed deformed bars in tension and does not allow their tension lap splices. In ACI318-11, the confinement factor, such as transverse reinforcement factor, is not used to calculate the development length of headed bars. The purpose of this experimental study is to evaluate the effect of confinement details to the lap splice performance of headed deformed reinforcing bars in grade SD400 and SD500. The confinement details are stirrups and tie-down bars in lap zone. Test results showed that specimens with only stirrups had the brittle failure and could not increase lap strengths, and that specimens with composite confinements by stirrups and tie-down bars had the flexural strengths over than nominal flexural strengths. Stirrups with tie-down bars can have an effect on improvement in lap splice of headed bars in grade SD400 and SD500.

Prediction of load transfer depth for cost-effective design of ground anchors using FBG sensors embedded tendon and numerical analysis

  • Do, Tan Manh;Kim, Young-Sang
    • Geomechanics and Engineering
    • /
    • v.10 no.6
    • /
    • pp.737-755
    • /
    • 2016
  • The load transfer depth of a ground anchor is the minimum length required to transfer the initial prestressing to the grout column through the bonded part. A thorough understanding of the mechanism of load transfer as well as accurate prediction of the load transfer depth are essential for designing an anchorage that has an adequate factor of safety and satisfies implicit economic criteria. In the current research, experimental and numerical studies were conducted to investigate the load transfer mechanism of ground anchors based on a series of laboratory and field load tests. Optical FBG sensors embedded in the central king cable of a seven-wire strand were successfully employed to monitor the changes in tensile force and its distribution along the tendons. Moreover, results from laboratory and in-situ pullout tests were compared with those from equivalent case studies simulated using the finite difference method in the FLAC 3D program. All the results obtained from the two proposed methods were remarkably consistent with respect to the load increments. They were similar not only in trend but also in magnitude and showed more consistency at higher pullout loading stages, especially the final loading stage. Furthermore, the estimated load transfer depth demonstrated a pronounced dependency on the surrounding ground condition, being shorter in hard ground conditions and longer in weaker ones. Finally, considering the safety factor and cost-effective design, the required bonded length of a ground anchor was formulated in terms of the load transfer depth.

A Study on Tension for Cables of a Cable-stayed Bridge Damper is Attached (댐퍼가 부착된 사장교의 케이블 장력에 관한연구)

  • Park, Yeon Soo;Choi, Sun Min;Yang, Won Yeol;Hong, Hye Jin;Kim, Woon Hyung
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.5
    • /
    • pp.609-616
    • /
    • 2008
  • Recently, many ocean bridges that connect land to island or island to island have been constructed along with the improvement of the nation's economy. Long-span bridges can be categorized as suspension bridge, cable-stayed bridge, arch bridge and truss bridge. In this study, correction with respect to construction error can be presented on site through the monitoring of the cable tension change of real structure for four major construction stages so that construction accuracy, including the management of profiles, can be improved. A vibration method, the so-called indirect method that uses the cable's natural frequency changes from the acceleration sensor installed on the cable, is applied in measuring cable tension. In this study, the estimation formula for the effective length of cable with damper is presented by comparing and analyzing between actual measurement and analysis result for the change of the cable's effective length. By the way, it is known that the reliability of estimating cable tension by applying the former method that uses the net distance from damper to anchorage is low. Therefore, for future reference of the maintenance stage, the presented formula for estimating the effective length of cable can be used as a reference for the rational decision-making, such as the re-tensioning and replacement of cable.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.

THE STUDY OF COMPARISON BEFORE AND AFTER ORTHODONTIC TREATMENT IN CLASS I BIALVEOLAR PROTRUSION CASES WITH FOUR BICUSPID EXTRACTION (제 1 소구치 발치를 동반한 제 I 급 치조성 양악 전돌 환자의 치료 전${\cdot}$후 비교에 관한 연구)

  • Kim, Hyung-Don;Park, Young-Chel
    • The korean journal of orthodontics
    • /
    • v.24 no.1 s.44
    • /
    • pp.149-159
    • /
    • 1994
  • The purposes of present study were to evaluate changes in models and lateral cephalometric head films during orthodontic treatment and to compare the amount of incisal retraction and anterior movement of molars with the two approaches of the retraction method of canine(sectional canine retractions vs sliding canine retractions) and the anchorage management(head gears vs no head gears, transpalatal arches vs no transpalatal arches and lingual arches vs no lingual arches) and to evaluate changes during orthodontic treatment in models with relation to lateral cephalometric head films. 67 Korean women with Angle's Class I bialveolar protrusion were selected, whose initial chronologic age was above 16 yrs. Models and lateral cephalometric head films were taken before and after orthodontic treatment with four bicuspid extraction. the results were obtained as follows. 1. Significant decreases were observed in intermolar width, arch length and arch perimeter of maxilla and mandible but significant difference was not observed in intercanine width of maxilla and mandible during treatment period. 2. The linear change of the upper incisor to upper lip was 2.84:1 and the linear change of the lower incisor to lower lip was 1.45:1 3. There were no significant differences between the two groups(sectional canine retractions vs sliding canine retractions), the !we groups(transpalatal arches vs no transpalatal arches) and the two groups(lingual arches vs no lingual arches) in the amount of incisal retraction and anterior movement of molars. There were a greater amount of maxillary incisal retraction and a lesser amount of anterior movement of maxillary molars with the use of head gears than no use of head gears. 4. Changes during orthodontic treatment in models with relation to lateral cephalometric head films were obtained as follows : 1) Maxilla Central incisors were moved 3.79mm backward, canines were moved 0.22mm laterally and 3.70mm backward, and molars were moved 0.535mm medially and 2.29mm forward. 2) Mandible Central incisors were moved 3.04mm backward, canines were moved 0.145mm laterally and 3.92mm backward, and molars were moved 0.755mm medially and 1.77mm forward.

  • PDF

A Study on the Applicability of Partial Post-Tension Slab with Top Anchorage System (상향긴장식 부분PT를 사용한 슬래브의 적용성 분석)

  • Lee, Deuck-Hang;Kim, Kang-Su;Kim, Chang-Hyuk;Kim, Sang-Sik;Kim, Yong-Nam;Chung, Kwang-Ryang
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.309-312
    • /
    • 2008
  • Reinforced concrete (RC) structures have been most widely used because of the economic efficiency. However, it is very weak to tensile stresses and difficult to control deflection due to the heavy self-weight of concrete. Although it is generally known that prestressed concrete structures can be the most effective to overcome the demerit of RC structures, its application is very seldom in domestic construction for the difficult onsite circumstances. The post-tension method, which is well fit for buildings that are mostly indeterminate structures and beneficial for monolithic construction, has been introduced to just a few building construction. The application of full PT method into entire spans makes construction engineers feel very difficult due to the lack of current condition in construction fields. Therefore, this study proposed the partially applied PT method as an alternative, which can improve the deflection control of RC structures and reduce the construction difficulty by applying the PT method in a part of span length as needed, and analyzed its characteristics of structural behavior. In this study, the top anchorage was applied to improve the applicability of partial PT method, and the analysis results of slab behavior were compared to the measured values obtained from the post-tensioned slab constructed by the partial PT method.

  • PDF

CLINICAL CONSIDERATION ON USING THE ELASTIC 'TIE BACKS' DURING SPACE CLOSURE ('Elastic tie back'을 이용한 발치공간 폐쇄에 관한 임상적 고려)

  • Cho, Ki-Soo;Chun, Youn-Sic
    • The korean journal of orthodontics
    • /
    • v.23 no.2 s.41
    • /
    • pp.217-227
    • /
    • 1993
  • Preadjusted appliance, following the original concept of the Andrews Straight-Wire appliance, became increasingly common in the 1980s. In six phases of treatment, anchorage control, leveling and aligning, overbite control, overjet reduction, space closure, and finishing are very effective with using the preadjusted appliances. Space closure is the phase of treatment in which the difference between standard edgewise and preadjusted mechanics is most noticeable. Orthodontists have been able to reduce the use of closing loops and, because of the level slot lineup, enjoy the advantages of sliding mechanics. In 1990, Dr. John C. Bennett and Richard P. McLaughlin introduced the new space closure system, namely, elastic 'tiebacks'. They found an $.019'\times.025'$ working archwire most effective in an .022'-slot system. Hooks of .024' stainless steel or .028' brass wire are soldered to the upper and lower archwires. The force required for space closure is delivered by elastic 'tiebacks'. An elastic modulo stretched by 2-3mm(to twice its normal length) usually delivers 0.5-1.5mm of space closure per month. Group movement and sliding mechanics are combined for gentle, controlled space closure, so that about 0.5mm of incisor retraction and 0.5mm of mesial molar movement can be seen each month. The tiebacks are replaced every four to six weeks. By using the elastic 'tiebacks', the next two cases were treated during space closure. Even though we found some clinical problems of this mechanics, long treatment time, hard to control of vertical dimension and anchorage, the application method of this system is so simple that orthodontists can manage many patients during short chair time. But we must apply this mechanics after perfect understanding of the biomechanics in tooth movement.

  • PDF

A Study on the Pullout Behavior of Shear Connectors which Fix the Additional Wall to the PHC-W Piles in the PHC-W Type Permanent Building Retaining Wall (PHC-W 흙막이를 활용한 건축영구벽체에서 PHC-W말뚝과 증설벽체를 합벽시키는 전단연결재의 인발거동에 관한 연구)

  • Jin, Hong-min;Kim, Sung-su;Choi, jeong-pyo;Choi, Yongkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.12
    • /
    • pp.107-113
    • /
    • 2017
  • Shear Connector should be used to fix the PHC pile with extension wall in order to utilize PHC-W retaining wall as permanent wall. The pullout behaviours on shear connectors anchored into PHC-W pile were observed as two modes. The first type behaviour showed that after reaching the maximum pullout resistance, the anchorage was broken and shear connector was pulled out abruptly. The second type behaviour showed that even after arriving the maximum pullout resistance, the anchorage was not destroyed and there was a progressive increase in pullout displacement. The maximum pullout resistance of the steel anchor shear connector is larger than that of deformed bar shear connector. The larger the diameter and the longer the embedment length of shear connector, the higher the maximum pullout resistance would be. The pullout displacements corresponding to the maximum pullout resistance of the shear connector showed various ranges regardless of the materials, the diameters and the anchoring lengths. A-D20 shear connectors showed a pull-out displacement of about 8~10 mm. A-D16, D-D19 and D-D16 shear connectors exhibited a pulling displacement of about 14~20 mm, but a pulling displacement of about 6~10 mm when the anchoring lengths were 50 and 80 mm.

Experimental Study on Flexural Behavior of RC Beams Strengthened with Prestressed CFRP Plate (CFRP판으로 프리스트레싱 보강한 RC 보의 휨거동에 관한 실험적 연구)

  • Han, Sang-Hoon;Hong, Ki-Nam;Kim, Hyung-Jin;Woo, Sang-Kyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.2A
    • /
    • pp.301-310
    • /
    • 2006
  • Carbon fiber reinforced polymer (CRFP) materials are well suited to the rehabilitation of civil engineering structures due to their corrosion resistance, high strength to weight ratio and high stiffness to weight ratio. Their application in the field of the rehabilitation of concrete structures is increased due to the vast number of bridges and buildings in need of strengthening. However, RC members, strengthened with externally bonded CFRP plates, happened to collapse before reaching the expected design failure load. Therefore, it is necessary to develop the new strengthening method to overcome the problems of previous bonded strengthening method. This problems can be solved by prestressing the CFRP plate before bonding to the concrete. In this study, a total of 21 specimens of 3.3 m length were tested by the four point bending method after strengthening them with externally bonded CFRP plates. The CFRP plates were bonded without prestress and with various prestress levels ranging from 0.4% to 0.8% of CFRP plate strain. All specimen with end anchorage failed by a plate fracture regardless of the prestress levels while the specimen without end anchorage failed by the separation of the plate from the beam due to premature debonding. The cracking loads was proportionally related to the prestress levels, but the maximum loads of specimens strengthened with prestressed CFRP plates were insignificantly affected by the prestress levels.