• Title/Summary/Keyword: air conditioner installation work

Search Result 3, Processing Time 0.017 seconds

Analysis on Installation Conditions Survey and Improvement of Drain Pump in Air-Conditioner : Focusing on Changwon City (에어컨 배수펌프 설치 실태 및 개선방안 분석 - 창원시를 중심으로)

  • Kim, Sung-Sam
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.8
    • /
    • pp.102-106
    • /
    • 2012
  • This paper was carried out to survey fire hazard and improvement at the drain pump in air-conditioners. Based on the results of analysis, the proposal of electrical accidents prevention and a construction improvement are as follows. A power connection of the drain pump has two types, an electrical outlet type and direct connection type at control board of air-conditioner. The electrical outlet types need a bulletin sign or education as malfunction of the drain pump include an additional accidents, current leakage and overflowing with water on the floor from breaker trip by exterior cause and breaker off by mistake of worker. On the other hand, the direct connection types prevent a power interruption as exterior cause, but it has some trouble, cut of ground cable and without protection device. Usually it doesn't work by electrician when air-conditioner and the drain pump power work. Therefore an education or countermeasures are recommended for not electrician. Generally malfunction of the drain pump causes accumulated materials into the tank. Even though the accumulated materials lead to an overheating and burning as failure of detector occur an idling, periodic inspection of the air-conditioner filter and the drain pump tank prevent the trouble.

Performance and Flow Characteristics of Axial Fan (축류팬의 성능 평가 및 주변 유동 특성)

  • 김재원;정윤영
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.12 no.11
    • /
    • pp.972-981
    • /
    • 2000
  • Comprehensive work is done for flows by an axial fan by experimental research. The present model fan is used for air handling device for out-door unit of an air conditioner in home appliance. PIV(Particle Image Velocimetry) system and wind tunnel are adopted for measurements of flows and performance evaluation, respectively. Major experimental conditions are the installation depth of a fan into a bellmouth of it. Optimal position of a fan in an inlet guide tube is observed by examination of fan-performance and flows in both upstream and downstream of the fan. Consequently, in the case of the fan inserted in half depth into the inlet tube, the efficiency of fan shows its maximum value and flow patterns is also streamlined.

  • PDF

Impact of Construction Safety Managers and Project Characteristics on Air Conditioning Installation Safety Scores (건설 안전관리자의 특성 및 프로젝트 특성이 에어컨 설치 공사의 안전 점수에 미치는 영향)

  • Uhm, Miyoung;Kim, Jinyoung;Kim, Hongjo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.3
    • /
    • pp.381-391
    • /
    • 2024
  • This study examined the factors influencing safety scores in air conditioning installation projects, with a specific focus on the characteristics of safety managers and project-specific details. Given the increase in industrial accidents within this sector and the lack of research on smaller-scale operations, this analysis of 7,046 safety data records from Company A aimed to address this gap. The results indicate that the month of project commencement has the most significant impact on safety scores(correlation coefficient of 0.21), followed by the age of the safety manager(correlation coefficient of 0.06). Interestingly, the educational background of the managers did not appear to influence safety outcomes. Furthermore, project cost was found to have a negative correlation with safety scores(-0.1), suggesting that lower-cost projects may be associated with higher risk levels. These findings underscore the importance of developing tailored safety checklists that take into account the specific timing and scale of air conditioning installation projects. Additionally, the results suggest that incorporating both experienced(older) and less experienced(younger) safety managers into safety strategies may be beneficial for achieving optimal safety outcomes. This balanced approach could leverage the strengths of both groups, potentially enhancing overall risk assessment and mitigation efforts.