Kim, Mu-Geun;Baek, Seung-Don;Song, Chan-Yong;Ahn, Dae-Whee;Han, Jeongho;Yoo, Beong-Seon;Kang, Ja-Young
Journal of Advanced Navigation Technology
/
v.23
no.4
/
pp.281-288
/
2019
A Flight test is an important process that must be performed to maintain airworthiness in the aircraft lifecycle, including aircraft development and certification. Flight test can be conducted for the purpose of demonstrating or verifying compliance with the applicable standard. Results of the flight test air accident analysis confirm that it is caused by a combination of various factors as well as aircraft. The International Civil Aviation Organization recommends the establishment and implementation of a safety management system to prevent aircraft accidents, but it does not reflect the specificity of the flight test. As such, advanced countries are providing separate criteria to assist stakeholder in conducting flight test safety management. This study investigates and analyzes relevant regulations of advanced countries, in accordance with the construction of a national flight performance test site in Korea, and proposes government-level guidelines to help stakeholders develop their flight test operation manuals. The guidelines discuss topics such as organizational composition, safety and risk management, flight operation, personnel management, and administrative issues.
Choi, Woonggyu;Pa Pa Win Aung;Sanyukta Arvikar;Cha, Gichun;Park, Seunghee
KSCE Journal of Civil and Environmental Engineering Research
/
v.44
no.1
/
pp.1-9
/
2024
Bridges, which are construction structures, have increased from 584 to 38,405 since the 1970s. However, as the number of bridges increases, the number of bridges with a service life of more than 30 years increases to 21,737 (71%) by 2030, resulting in fatal accidents due to basic human resource maintenance of facilities. Accordingly, the importance of bridge safety inspection and maintenance measures is increasing, and the need for decision-making support for supervisors who manage multiple bridges is also required. Currently, the safety inspection and maintenance method of bridges is to write down damage, condition, location, and specifications on the exterior survey map by hand or to record them by taking pictures with a camera. However, errors in notation of damage or defects or mistakes by supervisors are possible, typos, etc. may reduce the reliability of the overall safety inspection and diagnosis. To improve this, this study visualizes damage data recorded in the BIM model in an AR environment and proposes a maintenance plan for bridges with a small number of people through maintenance decision-making support for supervisors.
The Journal of the Convergence on Culture Technology
/
v.10
no.1
/
pp.403-409
/
2024
In this paper, the guidelines for the design of an Artificial Intelligence(AI) based Integrated Process Safety Management(PSM) system to enhance workplace safety using data from process safety reports submitted by hazardous and risky facility operators in accordance with the Occupational Safety and Health Act is proposed. The system composed of the proposed guidelines is to be implemented separately by individual facility operators and specialized process safety management agencies for single or multiple workplaces. It is structured with key components and stages, including data collection and preprocessing, expansion and segmentation, labeling, and the construction of training datasets. It enables the collection of process operation data and change approval data from various processes, allowing potential fault prediction and maintenance planning through the analysis of all data generated in workplace operations, thereby supporting decision-making during process operation. Moreover, it offers utility and effectiveness in time and cost savings, detection and prediction of various risk factors, including human errors, and continuous model improvement through the use of accurate and reliable training data and specialized datasets. Through this approach, it becomes possible to enhance workplace safety and prevent accidents.
Anyone who wants to install local ventilation system must obtain a permission from the Ministry of Employment and Labor even if he has permission from the Ministry of Environment. This is because not only the Atmospheric Environmental Protection Act, but also the manufacturing industry's hazardous risk prevention plan under Article 48 Clause 2 of the Industrial Safety and Health Act is to be submitted by 15 days before the construction. Under the current Environmental Protection Act, the Ministry of Environment regulates only the emission of pollutants from local exhaust ventilation systems into the atmosphere and the contents of workers' safety and health within industrial sites are managed by the Ministry of Employment and Labor. Even with the approval of the Ministry of Environment, the number of unsuccessful cases by the Ministry of Employment and Labor has increased, causing a growing discontent among the sites due to production delays and additional costs of improvement. In addition, local exhaust systems that are at greater risk of fire explosion have increased the risk of severe industrial accidents due to fire explosion. This is due to insufficient design of air volume, control speed, return speed, duct size, and risk of fire explosion. This is because the criteria and procedures for approval of local exhaust ventilation systems are similar, but the Industrial Safety and Health Act adds additional screening items for safety and safety of workers and fire and explosion. In this study, the Environment Ministry and the Employment and Labor Ministry seek to find a reasonable way to operate the system by comparing local exhaust ventilation system installation approval standards.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.12
no.2
/
pp.99-107
/
1998
This dissertationhas confirmed the non-flam mability of cast mold transformer that is increasingly used lately. As a research progress, the investigation has been performed on the installation status and each line of the subway system which have the most mold transformer accidents, and the impediment status of the transformer for rectifier and the high-voltage distribution transformer per each manufacturer. Then, a high voltage mold of the actual mold transformer has been installed in the horiwntal heating furnace and the heat has been applied by the standard heating temperature curve of KSF 2257(Fireproof testing meth od of the construction structures: 1993). Accordingly, the combustibility of the mold transformer based on the test results has been found that 78 minutes has been required for the complete burning per the KSF 2257 combustion test curve and that, after stopping the heat application of the horizontal furnace after ignition, the flame progress has not been made but shown as the self-extinguishing characteristics when the flame progress has been checked. Thus, the non-flammability and self-extinguishability of the mold transformer have been confirmed. The result of this dissertation has indicated that the accident involving mold transformer has been progressed and expanded by the dielectric breakdown or void due to the crack in the mold rather than a fire accident caused by a short-circuit or an overload.r an overload.
Journal of the Computational Structural Engineering Institute of Korea
/
v.28
no.5
/
pp.523-533
/
2015
A reactor containment acts as a final barrier to prevent leakage of radioactive material due to the possible reactor accidents into external environment. Because of the functional importance of the containment building, the SIT(Structural Integrity Test) for containments shall be performed to evaluate the structural acceptability and demonstrate the quality of construction. An initial numerical analysis was performed to simulate the results obtained from the SIT for a prestressed concrete(PSC) structure. But the analysis results by the initial model expected smaller displacements than the measured ones by 30% at some locations. Accordingly, the research and development to improve the initial model to corelate the measured results of the SIT more properly have been performed. In this paper, the effects of the loss of concrete due to duct for tendons and the contact of duct and tendons in un-bonded tendon system are mainly evaluated based on the preliminary analysis results. In addition, the importances of the proper definition of mesh connectivity among structural elements of concrete, liner plates, rebars and tendons are discussed.
A rip-current warning index function, which is estimated from the likelihood of rip current quantified based on numerical simulations under various sea environments and is varied according to real-time buoy-observations, was studied to help protect against rip current accidents at Haeundae beach. For the quantification, the definition of likelihood of rip current, which proposed by Choi et al. (2011, 2012b), was employed and estimated based on Boussinesq modelling. The distribution of likelihood of rip current was evaluated by using various simulations according to scenarios established based on physical quantities(i.e., wave parameters) of buoy-observations. To index the likelihood of rip current, empirical functions were derived based on the distribution and adjusted to observational environments. In this study, the observations from June to September in 2011 at Haeundae beach were applied to the rip-current index functions, and its applications into the real events found based on CCTV images were presented and investigated. In addition, limitations and improvements of the rip-current index function were discussed.
Park, Seonghyeon;Sung, Deokyong;Lee, Changho;Jung, Hyuksang;Youg, Seungkyong
Journal of The Korean Society For Urban Railway
/
v.6
no.4
/
pp.249-257
/
2018
The number of deaths for railway traffic accidents is mainly caused by working close to the track, or when unauthorized passage pass through the track. The safety fences are being used to ensure safety for workers close to the track, and to improve the efficiency of the work, without interfering with the passage of trains. However, a safety fence for railway tracks needs to be examined to see if it will interfere with the passage of trains. The purpose of this study is to analyze the safe distance between train and safety fence developed in Korea. In addition, the lateral load condition of wind pressure by trains is estimated and numerical analysis is carried out according to the installation intervals of railway safety fences. It has been confirmed that the proper spacing between the train and the railway safety fence should be at least 200 mm from the vehicle limit, and that the proper spacing of railway safety fence must be calculated in consideration of the wind pressure by trains.
Journal of the Korean Institute of Intelligent Systems
/
v.25
no.3
/
pp.279-286
/
2015
The rapid increase of the current marine accidents is mainly due to the human execution errors. In an effort to address this, various kinds of researches such as construction of the digital vessels and vessel information monitoring systems have been conducted. But for safe navigation of vessels, it lack on systems study which can efficiently store, utilize and manage the mass data accepted by the vessel. In this paper, we propose a VWS(Virtual World System) that is based on the architecture of intelligent systems RVC(Reactive Layer-Virtual World-Considerative Layer) model of intelligent autonomous navigation system. VWS is responsible to store all the necessary information for safe navigation of the vessel and the information services to the sub-system of intelligent autonomous navigation system. VWS uses topology database to express the specific problem area, and utilizes a scheduling to reflect the characteristics of the real-time processing environment. Also, Virtual World defines API for the system to reflect the characteristics of the distributed processing environment. As a case study, the VWS is applied to a intelligent ship autonomous navigation system, and simulation is done to prove the effectiveness of the proposed system.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.38
no.4
/
pp.345-352
/
2020
To preserve and restore tidal flats and prevent safety accidents, it is necessary to construct tidal flat topographic information including the exact location and shape of tidal creeks. In the tidal flats where the field surveying is difficult to apply, airborne LiDAR surveying can provide accurate terrain data for a wide area. On the other hand, we can economically obtain relatively high-resolution data from UAV (Unmanned Aerial Vehicle) surveying. In this study, we proposed the methodology to generate high-resolution topographic information of tidal flats effectively by integrating airborne LiDAR and UAV point clouds. For the purpose, automatic ICP (Iterative Closest Points) registration between two different datasets was conducted and tidal creeks were extracted by applying CSF (Cloth Simulation Filtering) algorithm. Then, we integrated high-density UAV data for tidal creeks and airborne LiDAR data for flat grounds. DEM (Digital Elevation Model) and tidal flat area and depth were generated from the integrated data to construct high-resolution topographic information for large-scale tidal flat map creation. As a result, UAV data was registered without GCP (Ground Control Point), and integrated data including detailed topographic information of tidal creeks with a relatively small data size was generated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.