• Title/Summary/Keyword: a predetermined time standards

Search Result 12, Processing Time 0.029 seconds

Development of robot work measurement by the unit motion model (단위 동작 모형에 따른 로봇 작업시간 측정법의 개발)

  • 권규식
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.367-370
    • /
    • 1996
  • This study deals with the motion modeling by the unit motion of robots and the work measurement through classification of robot motions and standardization. The proposed approach is to scrutinize the Predetermined Time Standards(PTS) methods for measurement of manual tasks performed by people and the basic motions for accomplishing that tasks. And then, it constructs the unit motion models as subsets composed with the basic motions. It apply together with movements distance as a time variable, too. These results are used for the work measurements of robots by the unit motion models.

  • PDF

Development of Microcomputerized Master Standard Data (마이크로 컴퓨터를 이용한 기본표준자료(基本標準資料) 개발)

  • Park, Gyeong-Su
    • Journal of the Ergonomics Society of Korea
    • /
    • v.4 no.1
    • /
    • pp.3-6
    • /
    • 1985
  • This research developes a microcomputer program for MSD which is one of the most widely llsed predetermined time standards. The program is written in BASIC and designed mainly for desk-top or portable microcomputer to facilitate the development of standard times for time study analysis. A simple case is illustrated to show the program running procedure.

  • PDF

A Study on Computer-Generated time Standard Calculations with Applications (작업표준시간산출(作業標準時間算出)의 전산화(電算化)와 적용사례(適用事例))

  • Yu, Byeong-Nam;Sin, Hyeon-Pyo
    • IE interfaces
    • /
    • v.1 no.1
    • /
    • pp.63-72
    • /
    • 1988
  • Since many small and medium sized enterprises in Korea have lack of funds to install a commercial computer packages for work standards and work scheduling. This study has been attempted to develop the computer-generated package to ease those problems. The system consisted of three major parts. The first part is a work measurement program applying W.F.(work factor) predetermined time standards for work standards. The second part is a work scheduling program which calculates each operator's machine and job allocation. The last part is a control program for the production outputs and the machine utilization monitoring. The system is programmed by dBASE III for the IBM-PC compatibles for the sake of user's conveniences.

  • PDF

A Study on Work Measurement System Development Applying MODAPTS Technique (MODAPTS 기법을 이용한 작업시간 관리시스템에 관한 연구)

  • 신현표;송한상
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.16 no.27
    • /
    • pp.43-49
    • /
    • 1993
  • The purpose of this study is to develope a computer-generated work measurement system for creating and maintaining standard data as well as labor standards applying MODAPTS(Modular Arrangement of Predetermined Time Standards) technique. The system consists of three major parts. The first part is a work measurement program applying MODAPTS technique for work standards. The second part is a work scheduling program which calculate each operator's machine and job allocations, operation and load schedules, wage and wage incentives and direct labor costs etc. The last part is the case study application program for R-Instrument Manufacturing Industry. The whole system is programmed by dbase-Ⅲ and by pop-up mu for IBM PC compatibles.

  • PDF

A Study on Dimension of Structural Members and Calculating Standards of Choikgong (初翼工) Architecture (초익공집 주요 구조부재 단면치수 계획과 산출기준 연구)

  • Kim, Jong-Hoon;Kim, Wang-Jik
    • Journal of architectural history
    • /
    • v.20 no.4
    • /
    • pp.81-94
    • /
    • 2011
  • The purpose of the study, approaching from the aspect of the construction technologies, is to determine the architectural techniques of traditional wood architects in existence, through which the systems and techniques that create the inherent characteristics of Korean architecture are clarified. With understanding traditional construction system and focusing on the fact that built environment results from the consistent standards and technologies of architects, this study inquires into the systematic standard and its formation that present in the process of planning for the overall scale and shape of a building from the study determines dimension of structural members. All the members that constitute the structure are trimmed in advance and assembled in a short period of time on the site. Because of that, the dimensions for trimming and assembling are predetermined according to designated standards in the planning process, therefore consistent standard of computation are in necessity to design shapes and sizes of enormous amount of structural members. This study also shows the standards of measurement employed by architects while planning for structural members of a building, and how the size and range of its composition are developed.

An Efficiency Analysis for Total Work Scheduling (총합적 작업일정계획의 합리화 및 효율분석)

  • 신현표
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.10 no.16
    • /
    • pp.19-26
    • /
    • 1987
  • Since many small and medium sized enterprises have lack of funds to install the full scale Computer Aided Process Planning this study has been attempted to develop a part of computer generated production information system for a start. The system is programmed by DBASE III and BASIC languages for the IBM-PC competables for the sake of user's convenience. The system consisted of four major parts. The first part is a computerized work measurement system for applying WF predetermined time standards. The second part is a computerized forecasting and loading system for applying various statistical techniques. The third part is a GT scheduling system programmed by BASIC for applying heuristic scheduling method. Finally, the last part is a simulation system for GT scheduling efficiency test which is programmed by SIMAN simulation language.

  • PDF

AN IN-SITU YOUNG'S MODULUS MEASUREMENT TECHNIQUE FOR NUCLEAR POWER PLANTS USING TIME-FREQUENCY ANALYSIS

  • Choi, Young-Chul;Yoon, Doo-Byung;Park, Jin-Ho;Kwon, Hyun-Sang
    • Nuclear Engineering and Technology
    • /
    • v.41 no.3
    • /
    • pp.327-334
    • /
    • 2009
  • Elastic wave is one of the most useful tools for non-destructive tests in nuclear power plants. Since the elastic properties are indispensable for analyzing the behaviors of elastic waves, they should be predetermined within an acceptable accuracy. Nuclear power plants are exposed to harsh environmental conditions and hence the structures are degraded. It means that the Young's modulus becomes unreliable and in-situ measurement of Young's modulus is required from an engineering point of view. Young's modulus is estimated from the group velocity of propagating waves. Because the flexural wave of a plate is inherently dispersive, the group velocity is not clearly evaluated in temporal signal analysis. In order to overcome such ambiguity in estimation of group velocity, Wigner-Ville distribution as the time-frequency analysis technique was proposed and utilized. To verify the proposed method, experiments for steel and acryl plates were performed with accelerometers. The results show good estimation of the Young's modulus of two plates.

A Study on the Relationship Between Length of Time and Contamination in Open Intravenous Solutions (정맥주사용 수액의 개방후 시간경과에 따른 오염도에 관한 실험연구)

  • 김일원
    • Journal of Korean Academy of Nursing
    • /
    • v.16 no.1
    • /
    • pp.67-80
    • /
    • 1986
  • The use of intravenous solutions for fluid replacement has become an integral part of patient care, This widespread use of intravenous solutions has increased the risk of contamination that can lead to septicemia and phlebitis. The literature regarding contamination of in use intravenous solutions recommends a standard 24-hour time limit on the use of these fluids. But the desings of these studies did not incorporate a time variable related to contamination. In other studies, however, time was a manipulated variable: but data regarding the onset of contamination were conflicting. Because published reports conflict with regard to a time standard related to the use of intravenous therapy, additional empirical data are needed upon which to base the standards of care regulating use of intravenous therapy. This study investigated rate of contamination in simulated in-use intravenous solutions to obtain data from which to recomend a standard time period for the administration of intravenous solutions. In this study samples were drawn from 60 bottles of 5% D/W solution at predetermined time intervals over 48 hours and samples were inoculated to Thio-glychollate Broth. After 10 days' culturing in that Broth, samples were cultured on blood agar plates for 18∼48 hours to determine the rate of contamination. was found at all time Period, regardless of the presence or absence of nurse's gloving in the preparation of fluids, the location in which the experimentations were performed, the contamination level of surrounding air, or the length of time during which solutions were opened. Data from this study support the use of a 48-hour time period on which to base the standard involved in ready-to-use simple intravenous solutions without additives. In emergency departments and critical care areas where intravenous solutions are prepared in advance, the suggested time standard supported by the data generated from this study is 48 hours, not 24 hour. Data from this study support a 24-hour time standard for changing in-use intravenous solutions when the contamination results from the manipulation of intravenous infusion system by hospital personnel, or from some other exogenous sources during administration. Because contamination that does occur within 48 hours in intravenous solutions must be introduced from some exogenous sources, further empirical studies based on the identification of sources of contamination and factors that affect the rate of contamination, are needed to investigate the currently employed standard of intravenous therapy and to provide the patient with more efficient and safer intravenous thereapy.

  • PDF

A Study for Safe Storage Time for In-house Sterilized Products in a Korean Hospital (멸균품의 유효기간에 관한 연구 - 포장재와 보관환경 중심으로 -)

  • Yoon, Kesook;Kim, Jeong Hee;Yang, Shin Hye;Chae, Ji Yeun;Lee, Young Mee;Cho, Kyung Sook
    • Quality Improvement in Health Care
    • /
    • v.5 no.2
    • /
    • pp.258-276
    • /
    • 1998
  • This study was conducted to justify the "prescribed shelf life" currently used in Samsung Medical Center and give recommendations based on scientific data to adopt for safe and cost-effective storage times for sterile goods Since the early 1970's, predetermined expiration dating policy has been used in Korea on all in-house sterilized products like any other countries; six months for the supplies wrapped in polyethylene peel pouches and two weeks for the rest. Recently, however, the studies suggest that current standards for preserving the sterility can be changing. It looks like we unnecessarily have too-short expiration date of sterilized supplies, that is far from being cost effective. Certainly, this research is an exciting project, especially in Korea, and will be leading and contributing to the paradigm shift of the conservative concept of shelf life for sterile supplies in Korean healthcare facilities. The major goal of this study was placed on the measurement of the recontamination time in packs wrapped in all kinds of wrapping materials used in S.M.C and stored in various conditions for periods ranging from three months to six months, and then develop a practical standard of "shelf life" based on the analyzed data. Objectives: To measure and compare the recontamination time of sterile packs among wrapppers and storage conditions, and develop a practical standard for the shelf life and storage conditions of sterile products. Samples and Method: The sterile integrity was investigated of the total 1,440 sterile sample packs containing gauze strip($1.5cm{\times}0.5cm$) we prepared and wrapped in nine wrapping materials (randomized reprocessed linens, linens reprocessed 99 times, linens reprocessed 120 times, new kraft paper, used kraft paper, new nonwoven fabrics, 6-time reprocessed nonwoven fabrics, new polyethylene peel pouches, used polyethylene peel pouches), and stored in four locations(closed cabinet of one of the typical wards, open shelf of one of ICUs, open shelf of separate storage room in ER, open shelf in OR), for three to six months, respectively in 1998. Each type of packs were opened weekly and the gauze strips inoculated into Brewer's thioglycollate broth at $35^{\circ}C$ for seven days. Results: There was no growth found for any types of the pack and storage conditions studied. Discussion: This study was conducted in an attempt to identify the possibility of extending the current shelf life for sterile goods we use in a sense of cost effectiveness. The findings suggest that we could extend our expiration dates, that means we can save a lot of materials and personnel time meeded for resterilizing, outdating, recleaning, wrapping, and reshelving. Then it will initiate a great reform in the field of healthcare in Korea, and now we are looking forward to this valuable revolution. We are going to continue this study and take all steps need to apply this new concept to our practice, and then trying to extend to other hospitals.

  • PDF

Research of Early-age Strength Development Technology for Remove the Steel Form of Large-wide Tunnel Lining Concrete (대단면 터널 라이닝 거푸집의 조기 제거를 위한 초기 강도 발현 기법 연구)

  • Kim, Kwang-Don;Lee, Deuk-Bok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.5
    • /
    • pp.116-127
    • /
    • 2014
  • The studies were carried out to process one cycle for a day to the large section tunnel lining concrete. Climatic characteristics of the tunnel inside are changed, when the temperature of the concrete placement is low, the mold remove time is increased that the heat of hydration speed be delayed because affects the strength development, to compensate for this, after installing the curing sheet on both sides of the steel form and installation of tunnel entrance, when it comes to providing the additional heat source of $28{\pm}2^{\circ}C$ therein, it was to be achieved early strength development control standards (4.5MPa) presented as a crack control scheme or more, thus, It was able to remove after age of 14hr from mold. On the other hand, under the conditions of $10{\pm}1^{\circ}C$ that a natural curing temperature in the tunnel, it was analyzed must ensure the curing time of 36hr or more after concrete placement. Throughout this study, the concrete strength development and the temperature in the early-age concrete, it can find that reverify the curing temperature is greatly affected, even concrete fly ash is mixed 10%, if it is possible to raise the surface temperature for a predetermined time, is not a problem in the early strength development.